A05_-_PWS.docx
DOCX document 38 KB Posted
- Attached to
- GRSM---FY17---WEBSTER---HWA SERVICE Federal contract opportunity
- Solicitation number
- P17PS02888
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clauses.rtf | RTF text file | |
| SCA_WD_98-0637.pdf | ||
| SCA_WD_01-0233_-_NC.pdf | ||
| Sol_P17PS02888.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Treatment of Hemlock Woolly Adelgid Great Smoky Mountains National Park North Carolina and Tennessee 2017
1. Background. The Great Smoky Mountains National Park (GRSM) is located in Tennessee and North Carolina and consists of nearly 521,000 acres. The park was established by Congress on June 15, 1934. The park’s mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. As with many of the Parks in the United States, the Great Smoky Mountains NP is working to offset the negative effects of invasive species that threaten the unique flora and fauna of our region. One of the valuable tree species in the park Tsuga canadensis (Eastern Hemlock), is now at risk of ecological extinction brought about by the invasive exotic forest pest, Adelges tsugae (Hemlock Woolly Adelgid -HWA). The Goal of this Contract is to suppress HWA populations and protect and preserve the valuable resource of Eastern Hemlock trees for the benefits of aesthetic, recreational, and ecological importance.
2a. Required Services. The contractor shall provide all labor, tools / equipment, materials and supervision required to treat 1 conservation areas, totaling 96 acres. All sites are within the Great Smoky Mountains National Park (see attachment maps). *Optional acreage of sites (2-14) may be added. Service Contract is subject to funding and all, some or none of these may be awarded… Sites for treatment and protocol are as follows:
| Site # |
| Site Name |
| Treatment Protocol |
| Acres |
| 1 |
| Trillium Gap Trail |
| Imidacloprid soil treatment:=>6” dbh |
| 96+/- |
| 2 |
| Black Fox Branch |
| Imidacloprid soil treatment:=>6” dbh |
| 65+/- |
| 3 |
| Lindsey Creek |
| Imidacloprid soil treatment:=>6” dbh |
| 288+/- |
| 4 |
| Copeland Creek East |
| Imidacloprid soil treatment: =>6”to<12” dbh |
| 78+/- |
| 5* |
| Evans Creek |
| Imidacloprid soil treatment:=>6”to<12” dbh |
| 104+/- |
| 6* |
| Mt. Cammerer |
| Imidacloprid soil treatment:=>6” dbh |
| 39+/- |
| 7* |
| Brushy Mountain |
| Imidacloprid soil treatment:=>6” dbh |
| 122+/- |
| 8* |
| Gabes Creek |
| Imidacloprid soil treatment:=>6” dbh |
| 47+/- |
| 9* |
| Gregory Ridge |
| Imidacloprid soil treatment:=>6” dbh |
| 164+/- |
| 10* |
| Bell Branch |
| Imidacloprid soil treatment:=>12” dbh |
| 106+/- |
| 11* |
| Boogerman Loop |
| Imidacloprid soil treatment:=>6” dbh |
| 124+/- |
| 12* |
| Buckeye Creek |
| Imidacloprid soil treatment:=>6” dbh |
| 35+/- |
| 13* |
| Sugar Cove |
| Imidacloprid soil treatment:=>6” dbh |
| 44+/- |
| 14* |
| Batsaw Branch |
| Imidacloprid soil treatment:=>6” dbh |
| 41+/- |
2b. Overview of treatment methods and associated requirements The contractor will be responsible for the identification of all target species and of similar appearing non-target species. In addition, some areas may contain sensitive native species (including but not limited to small mammals, insects, plants, lichens, bryophytes, mosses, liverworts and others) that must be avoided and must not be impacted by treatment activities. Special care must be taken on steep terrain to prevent damage from abrasion. Information about hemlock and HWA may be obtained by researching a variety of Internet sites or by contacting the Contracting Officer Representative (COR). The COR will provide information regarding sensitive species of concern after contract award. Identification characteristics and other information relevant to sensitive native species may also be obtained by consulting with Great Smoky Mountains Inventory and Monitoring Section liaison (to be named after contract award).
All treatment activities will be properly documented by vendor personnel, and the vendor is required to assign one person (preferably the on-site supervisor) to maintain such records and submit copies to the COR. Forms to be used will be provided by the COR. Vendor personnel responsible for maintaining records will be provided with proper training and instruction for completing required forms by the COR, with a time and date for such training and instruction to be scheduled with the COR prior to any treatment activities. Treatment forms are to be submitted to the COR on a regular basis, with the schedule for submission to be defined by the COR after contract award and prior to initiation of treatments. See Data collection section below…..
At minimum the on-site supervisor is required to possess a Commercial Pesticide Applicator’s Certification issued by the state of North Carolina or Tennessee Department of Agriculture and / or to be an International Society of Arboriculture Certified Arborist. Applicators certifications will be in the Forest Pest Control or Ornamentals and Turf grass Pest Control categories. Proof of certifications must be submitted to the COR prior to treatments.
A minimum of two employees are required to be on site during treatments due to the remote locations of treatment sites.
Material Safety Data Sheets (MSDS) and label information for chemicals utilized will be made available to personnel at the work site. Such information may be obtained by contacting the COR. This information will be carried by on-site supervisor when in the park.
3. Contractor Responsibilities
All treatment methods will be approved and periodically inspected by the COR. Note specific treatment protocol that will be used for each site.
Imidacloprid 75%WSP Protocol:
· All hemlock trees in selected sites for imidacloprid treatment will be treated either with a soil drench ,soil injection applicator or tablet form of imidaclprid. Soil drench or injections will be made with a solution of one 1.6 oz. packet of imidacloprid and enough water to result in a final volume of 48 oz solution. This solution will be applied at a rate of 1oz per inch of trunk diameter at dbh (4.5 feet from ground level) for all trees treated. Tablet treatments with be made with tablet form of imidacloprid based off of appropriate dose rate scale provided by COR. For reference marking purposes, each treated tree will be painted with tree marking paint (color determined by COR) with a two inch diameter dot after it is treated. The dot will be placed on the trunk two feet from ground surface and facing away from trails.
· *Only trees that have a transparency rating between 0% and 75% combined with a live crown ratio of 30% or higher will be treated with imidacloprid. Contractor will be instructed (during site visit) if needed by COR or representative in USFS Crown Condition Classification to determine transparency rating and live crown ratio. No trees with signs of Hemlock Borrer (Melanophila fulvoguttata) damage will be treated.
· All trees treated will be recorded with individual number and diameter on GPS units and data will be provided to COR on a regular basis.
Under this contract, no imidacloprid will be applied within 10 feet of surface water. No treatments may take place during heavy rain, periods of surface run-off or while the soil is in a saturated state. Determination of soil saturation will be made by the COR or Representative. Any trees that fall inside of the 10 foot buffer near surface water will be recorded on GPS unit with individual tree number and dbh (trunk diameter at 4.5 feet from ground level) recorded. COR will supply more information on this prior to treatment.
The contractor must have the ability to interpret topographic boundary maps of work sites using their own gps equipment. Paper copies of maps will be provided by the COR. Boundaries of work sites will not be flagged or marked previous to work period.
Data Collection for all protocols and treatment areas All data for treatments will be recorded in field on day(s) of treatment. Individual sites will be compiled onto one final form per site. COR will be presented completed field data forms by hardcopy or electronic mail within 3 business days after completion of treatment of each site.
4. Government Furnished Property, Materials and Supplies
| All paint and pesticide will be supplied by the Government/COR/Representative |
| All needed chemical supplies will be picked up by Contractor at the Sugarland’s North District Maintenance Yard at 107 Park Headquarters Rd. Gatlinburg, Tennessee A running tally of chemical withdrawn will be kept at the Vegetation building and Warehouse at the Sugarland’s North District Maintenance Yard in Gatlinburg. |
5. Business Hours. The contractor shall coordinate specific on-site work schedule with the Contracting Officer and COR five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours. Any work outside of normal business hours shall be pre-approved by the Contracting Officer and COR.
6. Suggested Contractor Furnished Property, Materials & Supplies
| Safety Glasses |
| Nitrile gloves |
| Diameter tape: dbh measurement or Biltmore stick: dbh measurement down to =>6”. |
| Reflective Safety Vest |
| Personal Protective Equipment (PPE) MUST include all requirements listed on the pesticide label. |
| PPE typically consists of nitrile gloves, long pants, socks and appropriate footwear, long sleeve shirts when applying pesticides. Potable water must be available on site. A safety and first aid kit should be available for immediate use while working. Snake protection boots or chaps are recommended. All PPE may be subject to inspection and approval by the COR prior to use, and questions regarding PPE should be submitted to the COR. |
7. Management. The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.
8. Safety & Environmental Compliance.
| The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety, laws. |
| The contractor shall comply with pertinent Environmental Protection Agency laws and regulations. |
| The GRSM safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property. |
| The contractor shall immediately report to the Contracting Officer, COR and GRSM safety officer all accidents resulting in employee injury or death or damage to property while performing this contract. |
8a. Suggested Safety Equipment.
Safety items: A first aid and safety kit must be available at all times while working. Kit contents should include eyewash, insect sting medication,(benzocaine wipes and/or benedryl tablets), poison ivy cream, various size bandages, antiseptic wipes, bandage tape and small scissors, burn cream, and other common first aid kit items. Further recommendations of Safety items and/or potential suppliers may be obtained by contacting the COR.
8b. Additional Safety requirements specific to this contract.
| Many of the treatment plots are off-trail in hemlock stands. These areas are typically rugged with uneven ground, steep slopes, fallen trees, and thick undergrowth. |
| All personnel should be briefed regarding terrain hazards, the possibility to encounter potentially hazardous wildlife (venomous snakes and stinging insects, spiders, coyotes, bears, feral dogs and hogs, or other species) and plants, fungi or other organisms exhibiting toxic properties. |
| All trails and roads in work areas will remain open to the public at all times. Care should be taken to prevent visitor exposure to chemicals and hazardous contractor activities. The Treatments alongside roadways will be conducted with the safety of contract personnel and visitors taken as a high priority. All personnel will be required to wear safety vest when working roadways. Chemical containers (Full or Empty) will not be left on roadway unsupervised. The Contractor must communicate with COR as to when roadwork will be performed. |
Note: Administrative roads access will not be permitted for Contractor vehicle use. It is the responsibility of the contractor to access work sites by foot traffic.
10. Special Contract Requirements
| Archeological Findings |
| All work is subject to the Antiquities Act of 1906 (16 CFR 1B, Archaeological Resources Protection) and the Archeological Resource Protection Act of 1979 (ARPA) (16 CFR 1B; 470aa – 470mm). Text of both documents may be obtained at http://www4.law.cornell.edu/uscode/16/ch1B.html, or by contacting the COTR/COR. Petroglyphs, artifacts, burial grounds or structural features, ceremonial, domestic and archeological objects of any nature, historic or prehistoric, found in the work area are the property of Great Smoky Mountains National Park and will only be removed by GRSM Park personnel. Should the contractor’s operation uncover any archeological remains the contractor will immediately suspend operations at the site of discovery, notify the COR of the findings, and continue operations in other areas. Included in the notification will be a brief statement describing the location (preferably with UTM coordinates located with GPS technology) and a detailed description of the findings. Any archeological finding MUST NOT BE DISTURBED IN ANY MANNER AFTER DISCOVERY to protect the integrity of the site and preserve historic data. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he/she will be compensated by an equitable adjustment under the General Provisions of the contract. |
Control of Erosion, Sedimentation and Pollution
| Operations will be scheduled and conducted to minimize erosion of soils to prevent siltation and/or excessive discharge of mud to streams, rivers, irrigation systems, and impoundments (ponds, lakes, reservoirs, etc.). The contractor will not be permitted to blade, doze, or slice the soil surface to remove vegetation. Soil disturbance should be minimized and prevented to the extent possible. |
| Pollutants such as fuels, lubricants, butamens, raw sewage, and/or other potentially harmful materials will not be discharged onto the ground, into or near rivers, streams and impoundments, or into natural or manmade channels. The vendor is responsible for all clean up resulting from toxic spills, and may be billed for costs of such cleanup if spills are discovered after job completion that may be shown to have been the result of vendor activities. |
All empty pesticide containers must be disposed of according to Label. Local recycling centers are available for such containers. Field rinsate of containers will be applied to target species.
· On some sites, Treatments will be on or near park boundary; Check with Contracting Officer Representative (COR) to determine park boundary before treatments begin.
11. Insurance. The Contractor shall be insured in accordance with State of Tennessee and North Carolina insurance regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.
Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of the State of Tennessee and North Carolina.
Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract, and shall submit proof of insurance to the Contracting Officer.
12. Motor Vehicle & Traffic Regulations. Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits.
13. Employee signage / Parking. All contractor employees shall comply with parking procedures published for the GRSM. Contractor employees shall return any GRSM issued personal or vehicle identification signage immediately upon termination of employment or completion of this contract.
14. Replacement of Contractor Employee for Security Reasons. The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.
15. Non-Payment for Additional Work. Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
16. Conflict of Interest. The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives utilized by the GRSM.
17 Quality Control. The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Performance Requirements Summary establishes performance standards that are the minimum requirements for acceptable performance of required services. The contractor’s QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:
| What method do you use to ensure the contract is performed in accordance with the PWS |
| Describe your typical courses of action when a problem does arise, or is addressed by COR. |
| Determine corrective measures and who will evaluate and correct deficiencies. |
| Describe the record-keeping system in accordance with Paragraph 3 (Overview). Define the types of reports generated and the frequency of reporting. |
18. Performance Requirements Summary (PRS). The contractor performance requirements are summarized into required services that relates directly to successful contract completion. The performance standard identifies the minimum acceptable levels of service allowed.
| PWS Section |
| Required Service |
| Standard |
| Monitoring Method |
| Incentive/ |
Disincentive
| 2a |
| Overview of treatment methods |
| 100% compliance |
| Random Inspection |
| Performance Evaluation |
| 3 |
| Contractor Responsibilities |
| 100% compliance |
| Random Inspection |
| Performance Evaluation |
| 8 |
| Safety |
| 100% compliance |
| Random Inspection |
| Performance Evaluation |
| 10 |
| Special Contract Requirements |
| 100% compliance |
| Random Inspection |
| Performance Evaluation |
19. Contractor’s Proposal Package. The following deliverables are to be submitted with offer in response to RFQ. These items below Must Be Provided.
| Read the solicitation letter |
| Provide a technical approach to perform required services mentioned above; See Solicitation Provision 52.212-2, page 10 of the SF 1449 / Commercial Clauses |
| Provide Past Performance; See Solicitation Provision 52.212-2. |
| Contractor safety plan. There are many safety items addressed in this document, Performance Work Statement, see paragraph 8, please address in your plan. |
| Contractor’s QCP, Paragraph 17 Performance Work Statement. |
| Proof of Insurance–Business Liability & Workers Compensation. See Paragraph 11 in this document, and Solicitation Provision 1452.228-70 Liability Insurance |
| Commercial Pesticide Applicator’s Certification or Proof of Arborists certification , see Paragraph 2a of this document bullet point |
20. Inspection. In order for the COR or representative to monitor Contractor performance and give feedback; no more than three sites shall be actively treated at one time. Final payment will be processed upon confirmation that all records from completed treatment site have been given to COR, all sites have been inspected for quality of completion and all contractor performance deficiencies have been satisfactorily corrected.
21. Site Evaluations. A site visit will be offered in advance of the submittal due date. The Contractor is responsible for field checking site conditions prior to submitting a bid. Failure of the Contractor to inspect sites prior to submitting a proposal will not constitute grounds for withdrawal of a proposal or of a claim after the award of the contract.
Ratio of treatable trees to acres may vary from stand to stand.
File details come from the government source that posted it. Updated .