Subcontracting_Form.docx
DOCX document 19 KB Posted
- Attached to
- MITIGATE MOLD, ASBESTOS, LEAD PAINT Federal contract opportunity
- Solicitation number
- P17PS02739
About this file
Subcontracting Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P17PS02739.pdf | ||
| A06_-_Environmental_Inspection_Report.pdf | ||
| A04_-_SOW.pdf | ||
| Clauses_-_UCF_Gibb_Changes_.docx | DOCX document | |
| DB_WD_KY170178.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR:___________________
PRIME CONTRACTOR
SUBCONTRACTOR
DIRECT
LABOR
FRINGE BENEFITS*
SUB
TOTAL
(A)
(B)
LABOR
G&A
TOT
AL
LABOR
COSTS
(C) (D)
)SUBCONTRACTOR: _____________________
SOURCE: ____________
SOURCE: __________________
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D) SUBCONTRACTING LABOR COST PERCENTAGE =____________________%
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
| ** | G&A denotes General and Administrative Costs |
| *** | You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs. |
File details come from the government source that posted it. Updated .