Subcontracting_Form.docx

DOCX document 19 KB Posted

Attached to
MITIGATE MOLD, ASBESTOS, LEAD PAINT Federal contract opportunity
Solicitation number
P17PS02739
Issued by
Department of the Interior National Park Service

About this file

Subcontracting Form

View the file

Other files for this federal contract opportunity

Other files attached to MITIGATE MOLD, ASBESTOS, LEAD PAINT, newest first.
File Type Posted
Sol_P17PS02739.pdf PDF
A06_-_Environmental_Inspection_Report.pdf PDF
A04_-_SOW.pdf PDF
Clauses_-_UCF_Gibb_Changes_.docx DOCX document
DB_WD_KY170178.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR:___________________

PRIME CONTRACTOR

SUBCONTRACTOR

DIRECT

LABOR

FRINGE BENEFITS*

SUB

TOTAL

(A)

(B)

LABOR

G&A

TOT

AL

LABOR

COSTS

(C) (D)

)SUBCONTRACTOR: _____________________

SOURCE: ____________

SOURCE: __________________

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D) SUBCONTRACTING LABOR COST PERCENTAGE =____________________%

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs
***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

File details come from the government source that posted it. Updated .