Sol_P17PS01831_Amd_000001.pdf
PDF 84 KB Posted
- Attached to
- MORA-MNT-ASPHALT OVERLAY PARADISE Federal contract opportunity
- Solicitation number
- P17PS01831
About this file
P17PS01831
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_5_-_Bond_Form_SF25A.pdf | ||
| Attachment_4_-_Read_Me_First.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Sol_P17PS01831.pdf | ||
| Attachment_3_-_Dept_of_Labor_Gen_Decision_WA20160001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
P17PS01831
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PY2
Ashford WA 98304-9751 55210 238th. Ave. E.
DOI, NPS, PWR - OLYM MABO - MORA
PPY
Ashford WA 98304-9751 55210 238th Ave E Mount Rainier National Park
NPS, PWR - OLYM MABO
07/26/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/14/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to issue Questions and Answers discussed at the site visit on July 26, 2017. No other changes.
Q1- Where is access to site?
A1- Trail Head in Lower Parking Lot near Ski Dorm Building. Area will be roped off for contractor use for asphalt loads.
Q2-Will all old asphalt be removed?
A2-No, most will be left in place with overlay of new. Three areas (less than 20' each will have old asphalt removed and park will prep and compact gravel base for contractor to overlay.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Pamela Griffin
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
P17PS01831/000001
Q3-What will the bridge final condition be?
A3-Culvert is in place, park will finish installing stem walls on each side. The surface will be 8' wide compacted base.
Q4-Will asphalt surface be swept clean by park or contractor?
A4-Park will complete.
Q5-Are there designated areas where equipment can pass?
A5-Yes, all trails will be closed to the public so trail junctions can be used. Also, there are three areas where NPS has used as materials staging sites that can be used. No machinery can leave trail on to vegetation.
Q6-Can contractor stay on site anywhere?
A6-No, accommodations are at the cost of the contractor. Campgrounds may be available.
Q7-Is a tack coat required throughout?
A7-Yes.
Legacy Doc #: NPS
Period of Performance: 09/05/2017 to 09/22/2017
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .