Sol_P17PS01831_Amd_000001.pdf

PDF 84 KB Posted

Attached to
MORA-MNT-ASPHALT OVERLAY PARADISE Federal contract opportunity
Solicitation number
P17PS01831
Issued by
Department of the Interior National Park Service

About this file

P17PS01831

View the file

Other files for this federal contract opportunity

Other files attached to MORA-MNT-ASPHALT OVERLAY PARADISE, newest first.
File Type Posted
Attachment_5_-_Bond_Form_SF25A.pdf PDF
Attachment_4_-_Read_Me_First.pdf PDF
Attachment_2_-_Drawings.pdf PDF
Attachment_1_-_Specifications.pdf PDF
Sol_P17PS01831.pdf PDF
Attachment_3_-_Dept_of_Labor_Gen_Decision_WA20160001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P17PS01831

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PY2

Ashford WA 98304-9751 55210 238th. Ave. E.

DOI, NPS, PWR - OLYM MABO - MORA

PPY

Ashford WA 98304-9751 55210 238th Ave E Mount Rainier National Park

NPS, PWR - OLYM MABO

07/26/2017000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/14/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to issue Questions and Answers discussed at the site visit on July 26, 2017. No other changes.

Q1- Where is access to site?

A1- Trail Head in Lower Parking Lot near Ski Dorm Building. Area will be roped off for contractor use for asphalt loads.

Q2-Will all old asphalt be removed?

A2-No, most will be left in place with overlay of new. Three areas (less than 20' each will have old asphalt removed and park will prep and compact gravel base for contractor to overlay.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Pamela Griffin

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

P17PS01831/000001

Q3-What will the bridge final condition be?

A3-Culvert is in place, park will finish installing stem walls on each side. The surface will be 8' wide compacted base.

Q4-Will asphalt surface be swept clean by park or contractor?

A4-Park will complete.

Q5-Are there designated areas where equipment can pass?

A5-Yes, all trails will be closed to the public so trail junctions can be used. Also, there are three areas where NPS has used as materials staging sites that can be used. No machinery can leave trail on to vegetation.

Q6-Can contractor stay on site anywhere?

A6-No, accommodations are at the cost of the contractor. Campgrounds may be available.

Q7-Is a tack coat required throughout?

A7-Yes.

Legacy Doc #: NPS

Period of Performance: 09/05/2017 to 09/22/2017

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .