B09_P14PS01466_Questions_and_Answers_.pdf

PDF 140 KB Posted

Attached to
PROVIDE AND INSTALL TWO STORAGE BOXES Federal contract opportunity
Solicitation number
P17PS01466
Issued by
Department of the Interior National Park Service

About this file

Attachment 1 - B09 P17PS01466 Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to PROVIDE AND INSTALL TWO STORAGE BOXES, newest first.
File Type Posted
A04_Revised_SOW_Furnish_Install_Two_Casemate_Storage_Boxes-8_29_17.doc DOC document
Sol_P17PS01466_Amd_000001.pdf PDF
FedConnect File —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P17PS01466: Provide and Install Two Climate Controlled Boxes - Gateway

National Recreation Area - Staten Island, NY – Questions and Answers

Question 1: Please supply the criteria for Humidity and Temperature Control for the Storage Boxes. In the winter when being heated is there any constraint on the environment being too dry?

Answer 1: Winter is likely to be dry; however, there is no water source for moistening the air.

Therefore the Park will be satisfied to control higher humidity levels than lower levels.

Question 2: We will size a pair of 2’ -6” x 7’ – 0” Doors. Do you require taller doors than this?

Answer 2: No

Question 3: Is 4” insulation on the floor panels sufficient?

Answer 3: Yes

Question 4: Please confirm there are no Communications, Security or Phone Requirements beyond the radio connected Fire Alarm.

Answer 4: See revised SOW attached to Amendment 0001. Phone line is the connection for the fire alarms.

Question 5: Please confirm that only the one set of doors is required for each storage container.

Answer 5: Confirmed

Question 6: Please confirm that 50 foot candles is sufficient lighting for the interior.

Answer 6: According to our architect that is fine.

Question 7: Please supply the heaviest loads on the insulated floor so storage box manufacturer can price them correctly.

Answer 7: Example 400lb, 12” cannon ball. And four legged metal shelving units reaching close to the ceiling of the box.

Question 8: Is there a required interior clear height? 11’ nominal exterior height would be about 10’ – 6” interior less the light fixtures.

Answer 8: See revised scope. Revised SOW in Fed Biz Ops changed to 10’ nominal height. Height is based on a maximum height that will get under existing ceiling light fixtures in arched ceiling casemate rooms.

Question 9: One of the questions just asked was about any telecom as part of the project. Page 8 says site plan for telephone cable but the next page does not call for any. The note “Cap Cable for future use may be is CAT cable? The last page requests a new 4” conduit run to a demark in the switchgear room. Is this the only task at this location? The rest of the SOW does not say anything about phones, phone conduit or cabling. Please clarify the phone requirements if any.

Answer 9: The telephone line in the manhole is a 100 pair cable. It should be brought into the electrical service panel room and punched down. A sufficient number of pairs needs to be extended from the electrical service panel room to the two casemate boxes and tied in to a dialer going back to the dispatch office.

To get into the electrical service panel room, there is an abandoned 4" cast iron pipe going through the wall of the Fort that the 100pr phone line should go thorough. See attached Revised Statement of

Work for more detail.