Construction_Clauses_Over_SAT_.docx

DOCX document 197 KB Posted

Attached to
BLRI 2016 VA RESTRIPING Federal contract opportunity
Solicitation number
P16PS01697
Issued by
Department of the Interior National Park Service

About this file

Clauses

View the file

Other files for this federal contract opportunity

Other files attached to BLRI 2016 VA RESTRIPING, newest first.
File Type Posted
FBO_-_Presolicitation.pdf PDF
Sol_P16PS01697_Amd_000001.pdf PDF
SOW-2016_VA_Restriping.pdf PDF
DB_WD_VA160128.pdf PDF
Sol_P16PS01697.pdf PDF
DB_WD_VA160133.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

PART I - THE SCHEDULE……A-1
SECTION A - SOLICITATION/CONTRACT FORMA-1
SF 1442 SOLICITATION, OFFER, AND AWARD NOTICE: SET-ASIDE FOR SMALL BUSINESS (Construction, Alteration, or Repair)A-1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTSB-3
B.1 PRICE/COST SCHEDULEB-1
B.2 SUPPLIES AND/OR SERVICES TO BE FURNISHEDB-2
B.3 CONSIDERATION -- FIXED-PRICEB-3
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORKC-1
C.1 STATEMENT OF OBJECTIVES/SPECIFICATIONSC-1
SECTION D - PACKAGING AND MARKINGD-1
SECTION E - INSPECTION AND ACCEPTANCEE-2
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEE-1
E.2 INSPECTION AND ACCEPTANCEE-2
SECTION F - DELIVERIES OR PERFORMANCEF-4
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEF-1

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OFWORK ALT 1 (APR 1984) F-2

F.3 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS (MAY 2014)F-3
F.4 PRINCIPAL PLACE OF PERFORMANCEF-4
SECTION G - CONTRACT ADMINISTRATION DATAG-3
G.1 IDENTIFICATION OF GOVERNMENT OFFICIALSG-1
G.2 INVOICESG-2
G.3 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)G-3
SECTION H - SPECIAL CONTRACT REQUIREMENTSH-23

H.1 EXECUTIVE ORDER 13513 PROHIBITION ON TEXT MESSAGING AND USING ELECTRONIC

EQUIPMENT SUPPLIED BY THE GOVERNMENT WHILE DRIVING (OCT 2009)H-1
H.2 1452.228-70 LIABILITY INSURANCE (JUL 1996)H-2

H.3 1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT – DEPARTMENT OF THE

INTERIOR (JUL 1996)H-3
H.4 WAGE DETERMINATIONH-4
H.5 SAFETYH-5
H.6 PAYROLLSH-6
H.7 OPERATION OF FACILITY DURING CONSTRUCTIONH-7
H.8 WORK HOURSH-8
H.9 USE OF PREMISESH-9
H.10 MAXIMUM WORK WEEKH-10
H.11 SAMPLES AND CERTIFICATESH-11
H.12 DISPOSALH-12
H.13 CONTRACTOR EMPLOYEESH-13
H.14 PERMITSH-14
H.15 QUALITY OF WORKH-15
H.16 COMPLETION OF WORKH-16
H.17 MATERIAL APPROVAL SUBMITTALSH-17
H.18 ARCHEOLOGICAL FINDINGSH-18
H.19 PROGRESS MEETINGSH-19
H.20 OPERATION OF FACILITY DURING CONSTRUCTIONH-20
H.21 EXCAVATION AND UTILITY CLEARANCESH-21
H.22 DISPOSALH-22

H.23 DOI ELECTRONIC INVOICING ELECTRONIC INVOICING AND PAYMENT-REQUIRE-

MENTS – INTERNET PAYMENT PLATFORM (IPP) (APR 2011)H-23
PART II - CONTRACT CLAUSESI-20
SECTION I - CONTRACT CLAUSESI-20
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEI-1
I.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACTI-2
I.3 52.219-14 LIMITATIONS ON SUBCONTRACTING. (NOV 2011)I-3
I.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)I-4
I.5 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)I-5

I.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELA-

TIONS ACT (DEC 2010)I-6
I.7 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)I-7
I.8 52.232-16 PROGRESS PAYMENTS. (APR 2012)I-8
I.9 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)I-9
I.10 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)I-10
I.11 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)I-11
I.12 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. (APR 1984)I-12
I.13 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984)I-13
I.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)I-14
I.15 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)I-15
I.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)I-16
I.17 1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIORI-17
I.18 1452.228-70 LIABILITY INSURANCEI-18
I.19 CONTRACTING OFFICER REPRESENTATIVEI-19
I.20 NARA RECORDS MANAGEMENT LANGUAGE FOR CONTRACTSI-20

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS J-1

SECTION J - LIST OF ATTACHMENTS J-1

PART IV - REPRESENTATIONS AND INSTRUCTIONS M-1

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS K-6

K.1 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)K-1
K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)K-2
K.3 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)K-3
K.4 52.215-5 FACSIMILE PROPOSALS (OCT 1997)K-4
K.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)K-5
K.6 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)K-6

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS L-7

L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCEL-1
L.2 52.216-1 TYPE OF CONTRACT (APR 1984)L-2

L.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK

(MAY 2014) L-3

L.4 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT --CONSTRUCTION MATERIALS

(MAY 2014)L-4
L.5 52.233-2 SERVICE OF PROTEST (SEP 2006)L-5
L.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)L-6
L.7 PROPOSAL PREPARATION AND SUBMISSION INSTRUCTIONSL-7

SECTION M - EVALUATION FACTORS FOR AWARD M-1

SECTION M – EVALUATION FACTORS FOR AWARD M-1

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

PRICE SCHEDULE

ITEM
DESCRIPTION
EST QTY
UNITS
UNIT PRICE
TOTAL PRICE
0010
Yellow Retro-Reflective Centerline
899,000
LF
0020
White Non-Reflective Parking & Edge Lines
6,100
LF

TOTAL SCHEDULE A:

B.2 SUPPLIES AND/OR SERVICES TO BE FURNISHED

The contractor shall provide all labor, materials, and facilities necessary to perform the restriping of the faded centerlines on Blue Ridge Parkway in Virginia in accordance with the Specifications.

B.3 CONSIDERATION -- FIXED-PRICE

The total firm-fixed price of this contract is $ _______________________

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 STATEMENT OF WORK/SPECIFICATIONS

The statement of work is attached and listed in Section J as Attachment 1.

SECTION D - PACKAGING AND MARKING

[For this Solicitation, there are NO clauses in this Section]

SECTION E - INSPECTION AND ACCEPTANCE

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

NUMBER TITLE DATE

52.222-30CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT
(NONE OR SEPARATELY SPECIFIED METHOD)MAY 2014
52.246-12INSPECTION OF CONSTRUCTIONAUG 1996
52.246-13INSPECTION—DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTSAUG 1996
52.248-3VALUE ENGINEERING—CONSTRUCTIONOCT 2015
52.249-10DEFAULT (FIXED-PRICE CONSTRUCTION)APR 1984

E.2 INSPECTION AND ACCEPTANCE

Final inspection and acceptance shall be by the Contracting Officer or his/her duly authorized representative at:

Inspection: -Blue Ridge Parkway in Virgina Acceptance: (Same as Above)

For the purpose of this clause, the Contracting Officer's Representative (COR) named in the Designation of COR clause in this contract is the representative of the Contracting Officer. The Contracting Officer reserves the right to unilaterally designate other Government agents as authorized representatives. Should such occur, the Contractor will be notified by a written notice.

SECTION F - DELIVERIES OR PERFORMANCE

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

NUMBER TITLE DATE

52.222-27AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CON-
STRUCTIONAPR 2015
52.227-4PATENT INDEMNITY – CONSTRUCTION CONTRACTSDEC 2007
52.232-5PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS.MAY 2014
52.236-5MATERIAL AND WORKMANSHIP.APR 1984
52.236-7PERMITS AND RESPONSIBILITIES.NOV 1991
52.236-8OTHER CONTRACTSAPR 1984
52.236-9PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTSAPR 1984
52.236-10OPERATIONS AND STORAGE AREASAPR 1984
52.236-11USE & POSSESSION PRIOR TO COMPLETIONAPR 1984
52.236-12CLEANING UPAPR 1984
52.236-13ACCIDENT PREVENTIONNOV 1991
52.242-14SUSPENSION OF WORK.APR 1984
52.246-21WARRANTY OF CONSTRUCTION.MAR 1994

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, ALT 1 (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 Sep 2016. The time stated for completion shall include final cleanup of the premises.

F.3 52.225-9 BUY AMERICAN ACT – CONSTRUCTION MATERIALS (MAY 2014)

(a)Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description
Unit of measure
Quantity
Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

F.4 PRINCIPAL PLACE OF PERFORMANCE

The effort required under this contract shall be performed at:

LOCATION/ADDRESS: Blue Ridge Parkway in Virginia

G - CONTRACT ADMINISTRATION DATA

G.1 IDENTIFICATION OF GOVERNMENT OFFICIALS

The Government Officials assigned to this contract are as follows:

Contracting Officer (CO):

Name: Laurie L. Sherrod Phone: 865-436-1219 Fax: 865-436-1220 Email: laurie_sherrod@nps.gov

Contracting Officer's Representative (COR):

Name: TBD Phone: TBD Cell: TBD Email: TBD

G.2 INVOICES

DOI ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS

Payment Request means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Condition - Commercial Items including in commercial item contracts. The IPP website address is: https://www.ipp.gov.

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via emailippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.3 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)

For the purpose of this contract the Contracting Officer's Representative (COR), shall be: TBD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 EXECUTIVE ORDER 13513 PROHIBITION ON TEXT MESSAGING AND USING ELECTRONIC EQUIPMENT SUPPLIED BY THE GOVERNMENT WHILE DRIVING (OCT, 2009)

This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.

H.2 1452.228-70 LIABILITY INSURANCE (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$100,000.00 each person* $500,000.00 each occurrence* $1,000,000.00 property damage*

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

H.3 1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT. - DEPARTMENT OF THE INTERIOR (JUL 1996) Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.

H.4 WAGE DETERMINATION

In the performance of this contract the Contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Numbers VA160128 and VA160133 which is contained as Attachments 2 and 3 to this solicitation.

H.5 SAFETY

The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right-to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).

H.6 PAYROLL

The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, seven (7) days after close of payroll period.

H.7 OPERATION OF FACILITY DURING CONSTRUCTION

Construction activities must not interrupt the function and day-to-day operations of the facility during construction.

The contractor must coordinate with the Project Inspector for any temporary measures. All temporary measures employed shall be at the Contractor's expense and shall be removed upon completion of the contract.

H.8 WORK HOURS

Normal work hours are from 7:30 a.m. through 4:00 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Saturday, Sunday or legal holidays unless otherwise authorized by the CO.

H.9 USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Government land or lands administered by the Government, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. Such permission, if granted, will be without charge to the Contractor.

(b) Unless provided otherwise, the Contractor shall provide and maintain sanitation facilities for the workforce at the site. Solid waste shall be disposed of in accordance with applicable Federal, State, and local regulations.

H.10 MAXIMUM WORK WEEK

The maximum workweek that will be approved is 40 hours. The Contractor's proposed hours of work are to include daily starting and stopping times.

H.11 SAMPLES AND CERTIFICATES

When required by the specifications or the contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements. Samples shall be submitted in duplicate by the contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall both be used in the work until approved in writing by the Contracting Officer.

H.12 DISPOSAL

Debris, rubbish, and non-usable material resulting from under this contract shall be disposed in a manner that meets federal, state and local laws.

H.13 CONTRACTOR EMPLOYEES

(a) The Contractor shall provide the Contracting Officer with the name(s) of responsible the responsible supervisor authorized to act for the Contractor.

(b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.

(c) Contractor employees shall conduct themselves in a proper, efficient, courteous and business-like manner.

(d) The Contractor shall remove from the site any individual whose continued employment is deemed by the contracting Officer to be contrary to public interest or inconsistent with the National Park Service.

H.14 PERMITS

The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. The Contractor shall comply with federal, state and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer before work commences, or as requested.

H.15 QUALITY OF WORK

Workmanship shall be of the highest quality and best practices of the trade. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6 and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards. Substitute items shall be equal to or better that the original material and must be approved by the Government.

H.16 COMPLETION OF WORK

The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause "Commencement, Prosecution and Completion of Work", FAR 52.211-10 (APR 1984) Section F.

H.17 MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause herein entitles "Materials and Workmanship", FAR 52.236-5 (APR 1984), Section I, shall be submitted to the Contracting Officer through the COR in five (5) copies. The Denver Service Center Form (DSC-1) entitled "Transmittal USDI, National Park Service” shall be used. Contractor shall re-submit any disapproved submittals within seven (7) calendar days of disapproval.

H.18 ARCHEOLOGICAL FINDINGS

Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he will be compensated by an equitable adjustment under the General Provision of the Contract.

H.19 PROGRESS MEETINGS

(a) The Contractor shall be available to meet with the CO or his/her representative at the job site during construction to discuss work progress.

(b) Meetings will be scheduled by the CO with timely notification to the Contractor.

(c) At the progress meetings, the Contractor shall give oral reports of the progress on the project to the CO. If the work is behind schedule, the Contractor shall be prepared to (i) discuss the work and any causes of work delay(s); (ii) present a plan to bring the work back into conformance with the schedule; or, if necessary (iii) to propose a revised work schedule.

H.20 OPERATION OF FACILITY DURING CONSTRUCTION

Construction activities must not interrupt the function and day-to-day operations of the facility during construction. The contractor must coordinate with the Project Inspector for any temporary measures. All temporary measures employed shall be at the Contractor's expense and shall be removed upon completion of the contract.

H.21 EXCAVATION AND UTILITY CLEARANCES

The Chief of Maintenance, for each park, shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the Contracting Officer no less than ten (10) calendar days prior to the date which he/she anticipates commencement of work. The Contractor will not proceed with excavation of any kind until such clearances have been issued. Clearances will be valid from the date of issue or completion of, or otherwise directed by the issuing authority.

H.22 DISPOSAL

Debris, rubbish, and non-usable material resulting from under this contract shall be disposed in a manner that meets federal, state and local laws.

H.23 DOI ELECTRONIC INVOICING ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INTERNET PAYMENT PLATFORM (IPP) APRIL 2011

Beginning May 1, 2011, payment requests for all new awards must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System (IPP). Payment terms for existing contracts and orders awarded prior to May 1 remain the same. The Contractor must use IPP for contracts and orders awarded May 1 and later, and must use the non-IPP invoicing process for those contracts and orders awarded prior to May 1.

Copy of the Vendor’s Commercial Invoice

Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

The contractor must submit to the CO and the COR the payroll for the general contractor and any applicable sub-contractors and an updated schedule.

The contractor must us the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instruction via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment the Contractor must submit a waiver request in writing to the Contracting Office with its proposal or quotation.

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

NUMBER TITLE DATE

52.202-1DEFINITIONSNOV 2013
52.203-3GRATUITIESAPR 1984
52.203-5COVENANT AGAINST CONTINGENT FEESMAY 2014
52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENTSEP 2006
52.203-7ANTI-KICKBACK PROCEDURESMAY 2014
52.203-8CANCELLATION, RECESSION, AND RECOVERY OF FUNDS FOR ILLEGAL
OR IMPROPER ACTIVITYMAY 2014
52.203-10PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITYMAY 2014
52.203-12LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONSOCT 2010
52.203-17CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIRE-
MENTS TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTSAPR 2014
52.204-4PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER CON-
TENT PAPERMAY 2011
52.204-10REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCON-
TRACT AWARDSOCT 2015
52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE.JUL 2013
52.209-6PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACT-

ING WITH CONTRACTOR’S DEBARRED, SUSPENDED, OR PROPOSED

FOR DEBARMENTOCT 2015
52.209-10PROHIBITION ON CONTRACTING WITH INVERTED DOMESTICCORPOR-
ATIONS.NOV 2015
52.215-2AUDIT AND RECORDS NEGOTIATIONSOCT 2010
52.215-8ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT.OCT 1997
52.219-6NOTICE OF TOTAL SMALL BUSINESS SET-ASIDENOV 2011
52.219-8UTILIZATION OF SMALL BUSINESS CONCERNSOCT 2014
52.219-14LIMITATIONS ON SUBCONTRACTINGNOV 2011
52.219-28POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATIONJUL 2013
52.222-3CONVICT LABOR.JUN 2003
52.222-4CONTRACT WORK HOURS AND SAFETY STANDARDS-OVERTIME
COMPENSATIONMAY 2014
52.222-6CONSTRUCTION WAGE RATE REQUIREMENTSMAY 2014
52.222-7WITHHOLDING OF FUNDS.MAY 2014
52.222-8PAYROLLS AND BASIC RECORDS.MAY 2014
52.222-9APPRENTICES AND TRAINEES.JUL 2005
52.222-10COMPLIANCE WITH COPELAND ACT REQUIREMENTSFEB 1988
52.222-11SUBCONTRACTS (LABOR STANDARDS).MAY 2014
52.222-12CONTRACT TERMINATION – DEBARMENTMAY 2014
52.222-13COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONSMAY 2014
52.222-14DISPUTES CONCERNING LABOR STANDARDS.FEB 1988
52.222-15CERTIFICATION OF ELIGIBILITY.MAY 2014
52.222-21PROHIBITION OF SEGREGATED FACILITIESAPR 2015
52.222-26EQUAL OPPORTUNITY.APR 2015
52.222-35EQUAL OPPORTUNITY FOR VETERANSOCT 2015
52.222-36EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES.JUL 2014
52.222-37EMPLOYMENT REPORTS ON VETERANSFEB 2016
52.222-50COMBATING TRAFFICKING IN PERSONSMAR 2015
52.222-54EMPLOYMENT ELIGIBILITY VERIFICATIONOCT 2015
52.222-55MINIMUM WAGES UNDER EXECUTIVE ORDER 13658DEC 2015
52.223-5POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATIONMAY 2011
52.223-6DRUG-FREE WORKPLACEMAY 2001
52.223-18ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVINGAUG 2011
52.225-13RESTRICTIONS ON CERTAIN FOREIGN PURCHASESJUN 2008
52.227-1AUTHORIZATION AND CONSENTDEC 2007
52.227-2NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENTDEC 2007
52.228-2ADDITIONAL BOND SECURITYOCT 1997
52.228-5INSURANCE-WORK ON A GOVERNMENT INSTALLATIONJAN 1997
52.228-11PLEDGES OF ASSETSJAN 2012
52.228-12PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDSMAY 2014
52.228-14IRREVOCABLE LETTER OF CREDITNOV 2014
52.229-3FEDERAL, STATE, AND LOCAL TAXESFEB 2013
52.232-16PROGRESS PAYMENTS, ALT 1MAR 2000
52.232-17INTERESTMAY 2014
52.232-23ASSIGNMENT OF CLAIMS.MAY 2014
52.232-25PROMPT PAYMENTJUL 2013
52.232-27PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS.MAY 2014
52.232-33PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENTJUL 2013
52.232-39UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONSJUN 2013
52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUB-
CONTRACTORSDEC 2013
52.233-1DISPUTES.MAY 2014
52.233-3PROTEST AFTER AWARD.AUG 1996
52.233-4APPLICABLE LAW FOR BREACH OF CONTRACT CLAIMOCT 2004
52.236-26PRECONSTRUCTION CONFERENCEFEB 1995
52.242-13BANKRUPTCYJUL 1995
52.243-4CHANGESJUN 2007
52.244-6SUBCONTRACTS FOR COMMERCIAL ITEMSJUN 2016
52.248-1VALUE ENGINEERINGOCT 2010
52.249-3TERMINATION FOR CONVENEINCE OF THE GOVERNMENT (DISMANTL-
ING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS)APR 2012
52.253-1COMPUTER GENERATED FORMSJAN 1991

I.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT. (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 1 year, 6 months (months)(years)

I.3 52.219-14 LIMITATIONS ON SUBCONTRACTING. (NOV 2011)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to--

(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and

(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for-

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a non-manufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

I.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

(a) Definitions. As used in this clause-- Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts—

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards .

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ______________ assigned to contract number ______________.[Contractor to sign and date and insert authorized signer's name and title].

(End of clause)

I.5 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(a) Definitions. As used in this clause-- “Gender identity” has the meaning given by the Department of Labor’s Office of Federal Contract Compliance Programs, and is found at www.dol.gov/ofccp/LGBT/LGBT_FAQs.html .

“Segregated facilities” means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin because of written or oral policies or employee custom. The term does not include separate or single-user rest rooms or necessary dressing or sleeping areas provided to assure privacy between sexes.

“Sexual orientation” has the meaning given by the Department of Labor’s Office of Federal Contract Compliance Programs, and is found at www.dol.gov/ofccp/LGBT/LGBT_FAQs.html .

(b) The contractor agrees that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The Contractor agrees that a breach of this clause is a violation of the Equal Opportunity clause in the contract.

(c) The Contractor shall include this clause in every subcontract and purchase order that is subject to the Equal Opportunity clause of this contract.

(End of clause) I.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

(a) During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR 471.2(d) and (f).

(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor's plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contract.

(2) If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice electronically by displaying prominently, on any Web site that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor's Web site that contains the full text of the poster. The link to the Department's Web site, as referenced in (b)(3) of this section, must read, "Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers."

(b) This required employee notice, printed by the Department of Labor, may be-

(1) Obtained from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 Constitution Avenue, NW., Room N-5609, Washington, DC 20210, (202) 693-0123, or from any field office of the Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;

(2) Provided by the Federal contracting agency if requested;

(3) Downloaded from the Office of Labor-Management Standards Web site at http://www.dol.gov/olms/regs/compliance/EO13496.htm; or

(4) Reproduced and used as exact duplicate copies of the Department of Labor's official poster.

(c) The required text of the employee notice referred to in this clause is located at Appendix A, Subpart A, 29 CFR Part 471.

(d) The Contractor shall comply with all provisions of the employee notice and related rules, regulations, and orders of the Secretary of Labor.

(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 and subpart 9.4. Such other sanctions or remedies may be imposed as are provided by 29 CFR part 471, which implements Executive Order 13496 or as otherwise provided by law.

(f) Subcontracts.

(1) The Contractor shall include the substance of this clause, including this paragraph (f), in every subcontract that exceeds $10,000 and will be performed wholly or partially in the United States, unless exempted by the rules, regulations, or orders of the Secretary of Labor issued pursuant to section 3 of Executive Order 13496 of January 30, 2009, so that such provisions will be binding upon each subcontractor.

(2) The Contractor shall not procure supplies or services in a way designed to avoid the applicability of Executive Order 13496 or this clause.

(3) The Contractor shall take such action with respect to any such subcontract as may be directed by the Secretary of Labor as a means of enforcing such provisions, including the imposition of sanctions for noncompliance.

(4) However, if the Contractor becomes involved in litigation with a subcontractor, or is threatened with such involvement, as a result of such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.

I.7 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

(a) Definitions. As used in this clause-- "Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury