B1_-_Atch_4_-_Pricing_Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
JEFF ENCAUSTIC TILE RESTORATION, SAINT LOUIS, MO Federal contract opportunity
Solicitation number
P15PS01558
Issued by
Department of the Interior National Park Service

About this file

Attachment 4 - Pricing Sheet

View the file

Other files for this federal contract opportunity

Other files attached to JEFF ENCAUSTIC TILE RESTORATION, SAINT LOUIS, MO, newest first.
File Type Posted
B1_-_Appdx_A_-_Existing_Tile_Info.pdf PDF
B1_-_Atch_1_-_L13405_JEFF_Encaustic_Tile_PM_01 _2015-05-13.pdf PDF
B1_-_Atch_3_-_MO51_-_Wage_Determination _2015-05-29.docx DOCX document
B1_-_Atch_5_-_Past_Performance_Questionnaire.docx DOCX document
B1_-_Atch_6_-_Consent_Letter_Sample.docx DOCX document
Sol_P15PS01558.pdf PDF
B1_-_Atch_2_-_Drawings.pdf PDF
A13_-_P15PS01558_-_Presol_Notice.pdf PDF
A13_-_P15PS01558_-_Presol_Notice.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

P15PS01558 - JEFF Encaustic Flooring
Offer Name:
Offer Address:
Offer DUNS:
SUMMARY OF COSTS
Bid ItemCost Element CostTotal
General Requirements
Existing Conditions
Concrete
Thermal & Moisture Protection
Finishes
Earthwork
Subtotal Direct Construction Cost by Divisions
Other Direct Costs 1
Other Direct Costs 2
Other Direct Costs 3
Other Direct Costs 4
Subtotal Other Direct Costs
Total Direct Construction Costs
Overhead (#% )
Subtotal with Overhead
Profit (#%)
TOTAL Cost of Construction
COSTS BY DIVISION
General RequirementsMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost
Existing ConditionsMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost
ConcreteMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost
Thermal & Moisture ProtectionMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost
FinishesMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost
EarthworkMaterialLaborEquipmentTotals
DescriptionQtyUnitMaterial Cost/UnitTotal Material CostLabor Cost/UnitTotal Labor CostEquipment Cost/UnitTotal Equipment CostTotal Cost/UnitTotal Cost

File details come from the government source that posted it. Updated .