Attachment 4 - Pricing Sheet
Other files for this federal contract opportunity
Other files attached to JEFF ENCAUSTIC TILE RESTORATION, SAINT LOUIS, MO, newest first.
| File |
Type |
Posted |
| B1_-_Appdx_A_-_Existing_Tile_Info.pdf |
PDF |
|
| B1_-_Atch_1_-_L13405_JEFF_Encaustic_Tile_PM_01 _2015-05-13.pdf |
PDF |
|
| B1_-_Atch_3_-_MO51_-_Wage_Determination _2015-05-29.docx |
DOCX document |
|
| B1_-_Atch_5_-_Past_Performance_Questionnaire.docx |
DOCX document |
|
| B1_-_Atch_6_-_Consent_Letter_Sample.docx |
DOCX document |
|
| Sol_P15PS01558.pdf |
PDF |
|
| B1_-_Atch_2_-_Drawings.pdf |
PDF |
|
| A13_-_P15PS01558_-_Presol_Notice.pdf |
PDF |
|
| A13_-_P15PS01558_-_Presol_Notice.pdf |
PDF |
|
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
Sheet1
| P15PS01558 - JEFF Encaustic Flooring | | | | | | | | | | |
| Offer Name: | | | | | | | | | | |
| Offer Address: | | | | | | | | | | |
| Offer DUNS: | | | | | | | | | | |
| SUMMARY OF COSTS | | | | | | | | | | |
| Bid Item | Cost Element Cost | Total | | | | | | | | |
| General Requirements | | | | | | | | | | |
| Existing Conditions | | | | | | | | | | |
| Concrete | | | | | | | | | | |
| Thermal & Moisture Protection | | | | | | | | | | |
| Finishes | | | | | | | | | | |
| Earthwork | | | | | | | | | | |
| Subtotal Direct Construction Cost by Divisions | | | | | | | | | | |
| Other Direct Costs 1 | | | | | | | | | | |
| Other Direct Costs 2 | | | | | | | | | | |
| Other Direct Costs 3 | | | | | | | | | | |
| Other Direct Costs 4 | | | | | | | | | | |
| Subtotal Other Direct Costs | | | | | | | | | | |
| Total Direct Construction Costs | | | | | | | | | | |
| Overhead (#% ) | | | | | | | | | | |
| Subtotal with Overhead | | | | | | | | | | |
| Profit (#%) | | | | | | | | | | |
| TOTAL Cost of Construction | | | | | | | | | | |
| COSTS BY DIVISION | | | | | | | | | | |
| General Requirements | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
| Existing Conditions | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
| Concrete | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
| Thermal & Moisture Protection | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
| Finishes | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
| Earthwork | | | Material | | Labor | | Equipment | | Totals | |
| Description | Qty | Unit | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |