Sol_P15PS01171_Amd_000001.pdf

PDF 84 KB Posted

Attached to
Design and install a fire detection suppression system Federal contract opportunity
Solicitation number
P15PS01171
Issued by
Department of the Interior National Park Service

About this file

P15PS01171

View the file

Other files for this federal contract opportunity

Other files attached to Design and install a fire detection suppression system, newest first.
File Type Posted
GRBA_EXISTING_sensor_locations_MAP_1.pdf PDF
GRBA_EXISTING_sensor_locations_MAP_2.pdf PDF
GRBA_Fire_Detection_and_Notification_System_Specs.pdf PDF
Sol_P15PS01171.pdf PDF
LCVC_Project_site-Baker_NV.pdf PDF
Wage_Rates_Davis_Bacon_White_Pine.pdf PDF
GRBA_Fire-Security_System_Upgrade_SOW.pdf PDF
LCVC_floor_plan_2003.pdf PDF
LCVC_Project_site-GRBA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P15PS01171

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PL3

Barstow CA 92311 2701 Barstow Rd

DOI, NPS, PWR - LAME MABO - MOJA

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAME MABO

06/01/2015000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/11/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment #01, clarify Statement of Work, Description of Work, item 12, GRBA requires only one indoor camera, pointed at the front counter of the visitor center. GRBA does not need external monitoring of the building.

Other items to clarify:

1. Window break detection. GRBA has them installed now, condition is unknown. They can remain or be removed. This was not addressed in the Statement of Work.

2. Existing panels are actually two separate systems: 1 for visitor center and 1 for the concessions area. They should remain separate for intrusion, but can be combined for fire/smoke.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JAMES READ

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

P15PS01171/000001

3. GRBA has no preference for one or two

(separate) panels for Fire/Intrusion at each location. A future sprinkler system shall be able to tie into any new fire detection system.

4. Attached are the existing schematics that were found since solicitation was announced. These schematics show elements that may or may not be installed and/or functioning. Conditions are unknown. Low voltage wiring runs to most sensors.

5. A 110V 20 amp circuit is available at the panel, next to the telephone closet.

Suggested COR: TVINCE1

Period of Performance: 07/01/2015 to 10/31/2015