subcontracting_WorkSheet_DIAPR_2011-06.docx
DOCX document 20 KB Posted
- Attached to
- Replace HVAC North Cascades NP Newhalem WA Federal contract opportunity
- Solicitation number
- P15PS00940
About this file
Subcontracting Percentage Worksheet (complete and submit with offer)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_Clarifications.pdf | ||
| Sol_P15PS00940_Amd_000002.pdf | ||
| Attachment_5_Site_Visit_notes.pdf | ||
| Sol_P15PS00940_Amd_000001.pdf | ||
| Attachment_2_Site_Plan_and_Equipment_General_Layout.pdf | ||
| Hot_Work_Permit_HW-1.pdf | ||
| key_personnel.docx | DOCX document | |
| Sol_P15PS00940.pdf | ||
| Attachment_3_Wage_Determination.pdf | ||
| Attachment_1_Scope_of_Work.pdf | ||
| P15PS00940_SF1442_and_clauses.pdf | ||
| Read_Me_First_P15PS00940.pdf | ||
| Attachment_6a_Site_Utilities_drawings.pdf | ||
| Attachment_6d_Mechnical_and_electrical_drawings.pdf | ||
| Attachment_6c_Structural_drawings.pdf | ||
| Attachment_6b_Architectural_drawings.pdf | ||
| experience_and_past_performance.doc | DOC document | |
| subcontractor_references.doc | DOC document | |
| synopsis_P15PS00940.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Subcontracting Percentage Worksheet Limitations on Subcontracting (FAR clause 52.219-14) Service-Disabled Veteran-Owned Small Business Set-Aside (FAR clause 52.219-27) Set-Aside under EDWOSB Program (FAR clause 52.219-29) Set-Aside under WOSB Program (FAR Clause 52.219-30)
| PRIME CONTRACTOR: ___________________ | Solicitation or contract number: _____________ | |
| SUBCONTRACTORS: ______________________ | ________________________ | |
| ________________________ | ________________________ |
Wage determination number and revision: ___________________
| PRIME CONTRACTOR |
| SUBCONTRACTORS |
| DIRECT LABOR |
| $ |
| $ |
| FRINGE BENEFITS* |
| $ |
| $ |
| SUB TOTAL |
| (A) $ |
| (B) $ |
| LABOR G&A** @_____% |
| (C) $ |
| (D) $ |
TOTAL LABOR COSTS
(E) $
(F) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor(s) (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in (A) and enter in (C).
Calculate the subcontractors’ G&A by multiplying their G&A rate by their SUBTOTAL figure in (B) and enter in (D).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (E) and (F).
Next, using this formula, calculate the subcontracting labor percentage. (F) / (E) + (F)
SUBCONTRACTING LABOR COST PERCENTAGE = __________________%
Prepared by: _________________________________________ Date submitted: _______________
| * | The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations. |
| ** | G&A denotes General and Administrative Costs. |
| *** | You will need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (F) even though you must still breakdown the contractor's costs. |
File details come from the government source that posted it. Updated .