A5_-_Draft_Drawings.pdf

PDF 2 MB Posted

Attached to
JEFF Repair/Replace Arch Louvers Federal contract opportunity
Solicitation number
P15PS00924
Issued by
Department of the Interior National Park Service

About this file

Draft Drawings

View the file

Other files for this federal contract opportunity

Other files attached to JEFF Repair/Replace Arch Louvers, newest first.
File Type Posted
A5_-_SOURCES_SOUGHT_01.docx DOCX document
A5_-_Draft_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET SUB-SHEET TITLE

1 G-0.0 COVER SHEET

2 A-1.1 NORTH TRAM CONTROL FLOOR PLAN AND PARTIAL ROOF PLAN

3 A-1.2 SOUTH TRAM CONTROL FLOOR PLAN

4 M-0.1 NORTH TRAM CONTROL FLOOR PLAN - MECHANICAL DEMOLITION

5 M-0.2 SOUTH TRAM CONTROL FLOOR PLAN - MECHANICAL DEMOLITION

6 M-1.1 NORTH TRAM CONTROL FLOOR PLAN - MECHANICAL NEW WORK

7 M-1.2 SOUTH TRAM CONTROL FLOOR PLAN - MECHANICAL NEW WORK

1. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE

MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE

FOR DAMAGE TO SAME RESULTING FROM WORK UNDER THIS

CONTRACT. THE CONTRACTOR SHALL RESTORE DAMAGED

EXISTING BUILDING AND SITE MATERIALS TO THEIR ORIGINAL

CONDITION.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND

SHALL BE RESPONSIBLE FOR THE SAME. COORDINATE ALL WORK

AND SHOP DRAWINGS WITH OTHER TRADES.

3. REPORT DISCREPANCIES IN THE DESIGN TO THE CONTRACTING

OFFICER PRIOR TO ANY DEMOLITION. CONTRACTOR SHALL FIELD

VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING WORK.

4. THE CONTRACTOR SHALL COORDINATE ALL TESTING AND

INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE

A COMPLETE AND SATISFACTORY INSTALLATION.

5. THE CONTRACTOR SHALL COORDINATE ON-SITE STORAGE OF

BUILDING MATERIALS, EQUIPMENT, AND TRASH CONTAINERS WITH

THE PARK.

6. ALL WORK SHALL COMPLY WITH LOCAL CODES AND ALL OTHER

APPLICABLE CODES, REGULATIONS, AND ORDINANCES.

7. ALL MATERIALS AND EQUIPMENT OF THE SAME TYPE SHALL BE

SUPPLIED BY THE SAME MANUFACTURER, AND SHALL BE NEW, OF

THE BEST QUALITY AND DESIGN, AND FREE FROM DEFECTS.

8. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS

EXISTING.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL

WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE

INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE

RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL

COORDINATE INSTALLATION BETWEEN THE TRADES.

10. CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL

MECHANICAL AND ELECTRICAL ITEMS WITH THE GENERAL

CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER OF ANY DISCREPANCIES PRIOR TO INSTALLATION AND/OR

FABRICATION.

11. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A

MAIN LEVEL FINISH FLOOR DATUM OF 100'-0". WHERE ITEMS ARE

LABELED A.F.F. (ABOVE FINISHED FLOOR), CONTRACTOR SHALL SET

THE ITEM AS MEASURED FROM THE LOCAL FLOOR ELEVATION.

COORDINATE ANY DISCREPANCIES REGARDING THIS SITUATION TO

ASSURE THAT ALL BUILDING COMPONENTS ARE PROPERLY SET TO

FUNCTION AS INTENDED. CONTRACTOR SHALL ERECT ALL

PARTITIONS IN A VERTICAL PLANE, NOT NECESSARILY

PERPENDICULAR TO THE FLOOR.

12. IT IS THE INTENT OF THIS CONTRACT THAT ALL AREAS AFFECTED BY

CONSTRUCTION SHALL PROVIDE A FINISHED AND COMPLETE

PROJECT, UNLESS NOTED OTHERWISE. CONTRACTOR SHALL

PATCH, REPAIR, AND ADJUST AS REQUIRED TO ACHIEVE THIS

FINISHED PROJECT.

13. THE BUILDING, LANDSCAPE AND SURROUNDINGS IS ON THE

NATIONAL REGISTER OF HISTORIC PLACES. THE ENTIRE SITE IS A

HISTORIC PROPERTY AND ALL REASONABLE PRECAUTIONS SHALL

BE TAKEN TO PREVENT COLLATERAL DAMAGE TO HISTORIC

MATERIALS SURROUNDING THE WORK AREA. IF DAMAGE OCCURS,

REPAIRS SHALL BE MADE AT NO ADDITIONAL COST TO THE

GOVERNMENT TO THE SATISFACTION OF THE CONTRACTING

OFFICER. EVERY OPPORTUNITY SHOULD BE TAKEN TO PRESERVE,

REPAIR AND CONSERVE HISTORIC MATERIALS AND DESIGNS.

COORDINATE ALL NEW PENETRATIONS AND ANY ALTERATIONS TO

THE BUILDING WHICH MIGHT AFFECT THE HISTORIC INTEGRITY OF

THE BUILDING WITH THE CONTRACTING OFFICER PRIOR TO

BEGINNING WORK.

14. "REMOVE" MEANS TO DEMOLISH AND DISPOSE OF AN ITEM OFF OF

NPS PROPERTY.

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

MIDWEST REGIONAL OFFICE

INSTALL ACCESS PORTALS AND PERFORM COMPONENT

RENEWAL OF ARCH LOUVER SYSTEM

ST. LOUIS, MISSOURI

JEFFERSON NATIONAL EXPANSION MEMORIAL

KJH

NAS

DCF

03-26-15

FINAL CD SUBMITTAL

THERE ARE NO KNOW ASBESTOS-CONTAINING MATERIALS (ACM) IN THE PROJECT WORK AREAS. IF, DURING REMOVAL WORK, THE CONTRACTOR DISCOVERS ANY MATERIAL WHICH HE SUSPECTS MAY CONTAIN ASBESTOS, HE SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. THE CONTRACTING OFFICER WILL THEN ARRANGE FOR

TESTING AND REMOVAL OF ANY ACM.

THE GOVERNMENT HAS INDICATED THAT ALL PAINTED STEEL WITHIN THE ARCH LEGS IS PAINTED WITH LEAD BASED PAINT (LBP). IF, DURING REMOVAL AND/OR INSTALLATION WORK, THE CONTRACTOR DISTURBS ANY LBP IN A MANNER THAT WOULD CREATE DUST AND/OR TOXIC FUMES, HE MUST REMEDIATE ALL AFFECTED SURFACES IN ACCORDANCE WITH ALL GOVERNMENTAL REGULATIONS IN ORDER TO PERFORM HIS WORK FOR THIS CONTRACT. THE USE OF BOLTED CONNECTIONS IN LIEU OF WELDED CONNECTIONS IS ENCOURAGED IN ORDER TO MINIMIZE UNNECESSARY

DISTURBANCE OF LBP.

DRAFT

A1.1

A

A1.1

B

A1.1 C

A1.1

D

A1.1

E

A1.2

A

A1.2

B

A1.2

C

3-26-15

NPS JNEM ARCH

124323

186472

3/26/15

MRG

MRG

STA

NORTH TRAM CONTROL

FLOOR PLAN -

MECHANICAL DEMOLTIONDRAFT

124323

186472

3/26/15

MRG

MRG

STA

SOUTH TRAM CONTROL

MECHANICAL DEMOLITIONDRAFT

124323

186472

3/26/15

MRG

MRG

STA

NORTH TRAM CONTROL

MECHANICAL NEW WORKDRAFT

124323

186472

3/26/15

MRG

MRG

STA

SOUTH TRAM CONTROL

FLOOR PLAN -

MECHANICAL NEW WORK

01_G-0.0
02_A-1.1
03_A-1.2
04_M-0.1
05_M-0.2
06_M-1.1
07_M-1.2

File details come from the government source that posted it. Updated .