CUVA_Roof_Q A.docx

DOCX document 19 KB Posted

Attached to
z--Roofing Project Cuyahoga Valley NP Federal contract opportunity
Solicitation number
P15PS00615
Issued by
Department of the Interior National Park Service

About this file

Q and A

View the file

Other files for this federal contract opportunity

Other files attached to z--Roofing Project Cuyahoga Valley NP, newest first.
File Type Posted
Sol_P15PS00615_Amd_000001.pdf PDF
2015_Roof_Bid_Schedule_7-1-15.docx DOCX document
CUVA_Roofing_SOW_FY15_7-1-15.doc DOC document
Sol_P15PS00615.pdf PDF
2015_Roof_Bid_Schedule_6-1-15_final.docx DOCX document
OH121.txt TXT text file
CUVA_Roofing_SOW_FY15_final.doc DOC document
FORM_Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CVNP Roof Project Q&A Gleeson Barn Q1: Are the gutters being replaced?

A1: No.

Boston store Q2: does work include the entrance roof? What are we doing with the copper porch roof?

A2: Yes, the wood entrance roof is part of the square footage. Please quote on fixing the wood roof only. We are not going to do the copper porch roof this at this time.

Q3: Where can we stage materials at this site?

A3: Next to the building on the west side.

Jyurovat – address is 696, not 676.

Q4: How do we handle the porch roof? Will the railings be coming off?

A4: Railings will be removed by park personnel.

Q5: What roofing material will we be putting on the porch roof?

A5: 60 mil TPO membrane.

Q6: What are we replacing the metal flashing with?

A6: Replace in kind.

Q7: Please detail how the chimney is to be fixed.

A7: Tuck point.

Q8: The list of materials in the SOW lists slate. Are we replacing any slate roofs?

A8: Not this year. That is just a general list of materials that may be used.

Hunt Farm Barn & Restrooms Q9: How will we attach gutters?

A9: Gutters will need brackets not straps.

Q10: Are we doing the outbuilding?

A10: Yes.

Everett School House – address is 2279.

Q11: What are we replacing with?

A11: Wood shingles.

Q12: Can we use government electric when available?

A12: No. Bring generators to all sites.

Q13: Are bathrooms available at any of the sites?

A13: Yes. Boston store and Hunt farm have public restrooms available.

Sager Q14: Is the shed included?

A14: Yes Richardson Q15: Do you want the roof on the garage to match the house?

A15: Yes Maur Q16: Is the shed included?

A16: Yes Hardy House Q17: Is the shed included?

A17: Yes Q18: Confirm that existing wood shingle roofs (Boston Store & Pine Hollow) are to replace with wood shingles, not wood shake.

A18: Replace with wood shingles.

Q19 Confirm drip edge requirements on wood shingle roofs. No drip edge is currently installed on Boston Store; however, drip edge is installed at Pine Hollow.

A19 No drip edge is needed.

Q20 Confirm if splash guards are required on all roofs. Only observed at Pine Hollow.

A20 Splash guards are required on all roofs.

Q21 Confirm valleys are to have metal and not shingled through.

A21 All valleys will be aluminum W 24” wide.

Q22 Confirm acceptable gutter installation method. Straps were observed at some location and brackets were observed at others.

A22 All gutters will be installed with brackets.

Q23 Under “Tasks” item #11 states “seal all cracks in chimneys.” Could you further define your expectations of sealing i.e. tuck pointing, silicone, mortar, etc.

A23 Tuck pointing.

Q24 Confirm at Richard House that flat roof section is to receive membrane roof. Please provide specifications for desired membrane.

A24 Confirmed. 60 mil. TPO membrane.

Q25 Confirm at Hunt Barn/Comfort Station that small outhouse roof is included in the re-roof square footage.

A25 Out house is included.

Q26 Confirm at Muar House that small outhouse roof is included in the re-roof square footage.

A26 Out house is included.

Q27 Confirm at Sager & Stewart Shed that small outhouse roof is included in the re-roof square footage. Confirm that power is turned back on.

A27 Out house is included. Companies will supply own power.

Q28 The Jurovat House address was 696 on the house not 676 as stated in optional work.

A28 696 is correct.

Q29 Confirm that the wood railings & posts will be removed prior to construction. Also, confirm that the flat roof section is to receive membrane roof and provide specifications for desired membrane.

A30 Flat roof is to be 60 mil. TPO membrane. Railings will be removed by park personnel.

Q31 Please consider a complete tear off down to trusses and re-apply of decking to Everett school house. Site observation appeared to be 100% failure of the shingle and roof deck of the structure.

A31 Building is historic and as much original fabric as possible is to be kept.

Q32 Please consider a complete tear off of the Richard Garage. Current roof is corrugated metal over shingle roof with visible failures in the substrate.

A32 Building is historic and as much original fabric as possible is to be kept.

Q33 Please confirm the requested repair for the optional porch repair of the Boston Store.

A33 We are not going to do the copper porch at this time.

Q34 Confirm that the outhouse at the Hardy house (2167 Everett Rd.) is to be re shingled.

A34 Out house is included.

Q35 Confirm if contractor can use CVNP power at the individual sites or if contractor must provide their own power source.

A35 Contractor must supply own power.

Q36 Please confirm the square footage for the Boston Store, on the SOW it says 2700 square feet and on the Bid Schedule it says 2280 square feet.

A36 2280 square feet.

Q37 Confirm size of half round gutters. 4 inch half round gutters were installed and SOW states 6’ which is believe to be 6 inches.

A37 yes, all 6 inch half round gutters.

See attached updated bid sheet.

See attached updated SOW.