02_Site_Visit_Agenda.pdf
PDF 16 KB Posted
- Attached to
- SEKI LP VC HVAC - CONSTRUCTION Federal contract opportunity
- Solicitation number
- P15PS00174
About this file
Site visit Agenda
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P15PS00174_Amd_000003.pdf | ||
| RFI s_and_Government_Response_1-30-14.pdf | ||
| Davis_Bacon_Wage_Determination_Tulare_County_1.30.2015.pdf | ||
| REVISED_-_Contract_Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_P15PS00174_Amd_000002.pdf | ||
| 07_General_References.pdf | ||
| 05_Subcontractor_Reference.pdf | ||
| Sol_P15PS00174_Amd_000001 1 .pdf | ||
| 03_Site_Visit_-_O A.pdf | ||
| 06_Past_Performance_Questionnaire.pdf | ||
| 01_FedBizzOpps_Instructions.pdf | ||
| 04_Site_Visit_Sign_In_Sheet.pdf | ||
| 05_Specifications_and_Statement_of_Work.pdf | ||
| 04_Davis_Bacon_Wage_Determination_Tulare_County.pdf | ||
| 01_Bid_Bond_SF_24-98.pdf | ||
| 03_Form_2-_Key_Personnel.pdf | ||
| 02_Form_1-_Experience_ _Past_Performance.pdf | ||
| Sol_P15PS00174.pdf | ||
| 06_Drawings.pdf | ||
| 07_Bidder_Submittal_Instructions.pdf | ||
| Contract_Price_Schedule.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL SITE VISIT
SEQUOIA NATIONAL PARK
LODGEPOLE VISITORS CENTER HVAC
SYSTEM REHABILITATION
January 7, 2015 at 11:00 AM PDT
AGENDA
Welcome and Introductions:
-- Justin Pattison, Sequoia and Kings Canyon National Parks, Project Manager/COR
-- David Lewis, Sequoia and Kings Canyon National Parks, Contracting Officer
Sign-In Sheet: All persons present must sign the attendance record.
Handouts: FedBizOpps Website Instructions
Meeting Format
Ground Rules:
o NO sidebar discussions.
o In order to maintain the integrity of the procurement, we will not answer questions on a one-to-one basis.
o All questions and their answers will be documented. This information will be shared with all potential offerors as an amendment to the solicitation and will be made available for download on the Federal Business Opportunities (FBO) website (www.fbo.gov).nbc.gov).
o Any questions that cannot be answered by referring to the drawings or specifications will be answered by amendment.
o Remarks and explanations at this conference shall not qualify the terms of the solicitation.
o The terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.
Project Description: The work includes rehabilitation/replacement of the existing Lodgepole Visitor Centers HVAC System in the developed area of Lodgepole within Sequoia National Park.
Solicitation Overview:
o Pre-solicitation – The pre-solicitation notice was announced electronically on the FBO website (www.fbo.gov) and on December 04, 2014.
o Solicitation Publication –
-- The solicitation for this project was posted electronically on December 19, 2014.
-- Proposals must be received at the address provided in the solicitation (Three Rivers) NO LATER THAN 4:00 PM Pacific Time, January 22, 2015..
-- The Scope of Service and all attachments are available online and must be downloaded from the FedBizOpps (www.fbo.gov).
-- Paper copies of the solicitation documents are not available.
-- It is the contractor’s responsibility to check the website regularly for future amendments.
-- The Federal Business Opportunities website (a.k.a. FedBizOpps) at www.fbo.gov includes a notification capability which is available for your use. This service will send an email to a designated address when new postings are made related to a particular solicitation. Please note that this service is provided for convenience only and does not serve as a guarantee of notification. Subscribers to this service are ultimately responsible for reviewing the appropriate site for all information relevant to desired acquisitions.
Amendments Issued – o None to date o Contract Type – This will be a fixed price construction contract and award will be made to one offeror.
Offerors are required to submit both a technical and price proposal (two separate volumes) as stated in the clauses of the contract. This is a Total Hubzone set-aside, therefore, only contractors that are Hubzone certified will be considered for this project.
o Evaluation Criteria –
-- The solicitation states that all evaluation factors other than price, when combined, are approximately equal to price.
-- The Government may elect to accept other than the lowest price proposal when benefits of a higher priced proposal merit the additional cost.
-- Be sure that your technical proposal addresses each of the evaluation criteria as well as the subfactors as they are the only factors that the technical evaluation panel may use when rating your proposal.
-- The Government intends to evaluate and award without discussions; however, it reserves the right to enter into discussions.
o Contract Price Schedule –
-- The Contract Price Schedule contains six (6) items that make up the base line items and four (4) option items. Offerors are required to submit a price for all six base line items and four option items;
-- Proposals will be evaluated by adding the total price for all line items to the total price for the basic requirement.
Questions regarding the solicitation?
Walk Thru of the Site:
o Stay together as a group and do not linger behind.
o There are no sidebar discussions permitted. Make a note of your questions and refrain from asking them during the walk thru. We will ask the group as a whole if there are questions; that is the appropriate time to ask your questions. .
Questions regarding the walk thru?
Future access to site? The site is open to the public.
Future Questions: Any additional questions you may have during the remainder of the solicitation period must be provided in writing to the Contract Specialist. Please email these questions to david_lewis@nps.gov.
File details come from the government source that posted it. Updated .