P09 Pricing Sheet NJ Water Treatment FINAL (1).xlsx

XLSX spreadsheet 32 KB Posted

Attached to
H246--Water Systems Testing and Treatment Federal contract opportunity
Solicitation number
36C24221Q0366
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

View the file

Other files for this federal contract opportunity

Other files attached to H246--Water Systems Testing and Treatment, newest first.
File Type Posted
P09 Pricing Sheet NJ Water Treatment FINAL-Amend.xlsx XLSX spreadsheet
36C24221Q0366 0006_1.docx DOCX document
S06 36C24221Q0366 0006.docx DOCX document
AMEND 36C24221Q0366 0005.pdf PDF
36C24221Q0366 0005_1.docx DOCX document
36C24221Q0366 0003.docx DOCX document
36C24221Q0366 0002.docx DOCX document
36C24221Q0366 0001.docx DOCX document
SAM-DESCRIPTION.docx DOCX document
P09 ATTACHMENT A.docx DOCX document
36C24221Q0366.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Line ItemDescriptionFrequencyUnit of MeasureUnit PriceUnit Cost per Month (per year for quarterly/semi/annual services)Total Price
0001EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month24JB
0002EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month24JB
0003EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month24JB
0004EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month24JB
0005EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month24JB
0006EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month24JB
0007EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month24JB
0008EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month24JB
0009EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month24JB
0010EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month24JB
0011EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month24JB
0012EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month24JB
0013EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month24JB
0014EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month24JB
0015EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month24JB
0016EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month24JB
0017EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month24JB
0018EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
0019EO Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
0020EO Biological Studies All Cooling and chill Systems Monthly12JB
0021EO Anaerobic bacteria testing on Main Chiller Quarterly4JB
0022EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month24JB
0023EO On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
0024EO Unscheduled Chemical Metering Pump, one time per year1EA
0025EO Unscheduled Injection Quils, once per year1EA
0026EO Unscheduled Tubing for injection, one roll per year1EA
0027EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
0028EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
0029EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
0030EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
0031EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year1EA
0032EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
0033EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total1EA
0034EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA
0035LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month24JB
0036LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month24JB
0037LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month24JB
0038LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month24JB
0039LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month24JB
0040LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month24JB
0041LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month24JB
0042LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month24JB
0043LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month24JB
0044LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month24JB
0045LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month24JB
0046LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month24JB
0047LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month24JB
0048LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
0049LY Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
0050LY Biological Studies All Cooling and chill Systems Monthly12JB
0051LY Anaerobic bacteria testing on Main Chiller Quarterly4JB
0052LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month24JB
0053LY On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
0054LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year1EA
0055LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year1EA
0056LY Unscheduled Chemical metering Pump, one time per year1EA
0057LY Unscheduled Injection Quils, once per year1EA
0058LY Unscheduled Tubing for injection, one roll per year1EA
0059LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
0060LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
0061LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
0062LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
0063LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year1EA
0064LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
0065LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total1EA
0066LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA

Option 1

Line ItemDescriptionFrequencyUnit of MeasureUnit PriceUnit Cost per Month (per year for quarterly/semi/annual services)Total Price
1001EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month24JB
1002EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month24JB
1003EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month24JB
1004EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month24JB
1005EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month24JB
1006EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month24JB
1007EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month24JB
1008EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month24JB
1009EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month24JB
1010EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month24JB
1011EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month24JB
1012EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month24JB
1013EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month24JB
1014EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month24JB
1015EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month24JB
1016EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month24JB
1017EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month24JB
1018EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
1019EO Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
1020EO Biological Studies All Cooling and chill Systems Monthly12JB
1021EO Anaerobic bacteria testing on Main Chiller Quarterly4JB
1022EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month24JB
1023EO On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
1024EO Unscheduled Chemical Metering Pump, one time per year1EA
1025EO Unscheduled Injection Quils, once per year1EA
1026EO Unscheduled Tubing for injection, one roll per year1EA
1027EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
1028EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
1029EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
1030EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
1031EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year1EA
1032EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
1033EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total1EA
1034EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA
1035LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month24JB
1036LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month24JB
1037LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month24JB
1038LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month24JB
1039LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month24JB
1040LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month24JB
1041LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month24JB
1042LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month24JB
1043LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month24JB
1044LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month24JB
1045LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month24JB
1046LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month24JB
1047LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month24JB
1048LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
1049LY Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
1050LY Biological Studies All Cooling and chill Systems Monthly12JB
1051LY Anaerobic bacteria testing on Main Chiller Quarterly4JB
1052LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month24JB
1053LY On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
1054LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year1EA
1055LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year1EA
1056LY Unscheduled Chemical metering Pump, one time per year1EA
1057LY Unscheduled Injection Quils, once per year1EA
1058LY Unscheduled Tubing for injection, one roll per year1EA
1059LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
1060LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
1061LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
1062LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
1063LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year1EA
1064LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
1065LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total1EA
1066LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA

Option 2

Line ItemDescriptionFrequencyUnit of MeasureUnit PriceUnit Cost per Month (per year for quarterly/semi/annual services)Total Price
2001EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month24JB
2002EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month24JB
2003EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month24JB
2004EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month24JB
2005EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month24JB
2006EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month24JB
2007EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month24JB
2008EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month24JB
2009EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month24JB
2010EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month24JB
2011EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month24JB
2012EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month24JB
2013EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month24JB
2014EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month24JB
2015EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month24JB
2016EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month24JB
2017EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month24JB
2018EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
2019EO Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
2020EO Biological Studies All Cooling and chill Systems Monthly12JB
2021EO Anaerobic bacteria testing on Main Chiller Quarterly4JB
2022EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month24JB
2023EO On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
2024EO Unscheduled Chemical Metering Pump, one time per year1EA
2025EO Unscheduled Injection Quils, once per year1EA
2026EO Unscheduled Tubing for injection, one roll per year1EA
2027EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
2028EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
2029EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
2030EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
2031EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year1EA
2032EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
2033EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total1EA
2034EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA
2035LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month24JB
2036LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month24JB
2037LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month24JB
2038LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month24JB
2039LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month24JB
2040LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month24JB
2041LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month24JB
2042LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month24JB
2043LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month24JB
2044LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month24JB
2045LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month24JB
2046LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month24JB
2047LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month24JB
2048LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
2049LY Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
2050LY Biological Studies All Cooling and chill Systems Monthly12JB
2051LY Anaerobic bacteria testing on Main Chiller Quarterly4JB
2052LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month24JB
2053LY On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
2054LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year1EA
2055LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year1EA
2056LY Unscheduled Chemical metering Pump, one time per year1EA
2057LY Unscheduled Injection Quils, once per year1EA
2058LY Unscheduled Tubing for injection, one roll per year1EA
2059LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
2060LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
2061LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
2062LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
2063LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year1EA
2064LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
2065LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total1EA
2066LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA

Option 3

Line ItemDescriptionFrequencyUnit of MeasureUnit PriceUnit Cost per Month (per year for quarterly/semi/annual services)Total Price
3001EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month24JB
3002EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month24JB
3003EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month24JB
3004EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month24JB
3005EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month24JB
3006EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month24JB
3007EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month24JB
3008EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month24JB
3009EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month24JB
3010EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month24JB
3011EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month24JB
3012EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month24JB
3013EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month24JB
3014EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month24JB
3015EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month24JB
3016EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month24JB
3017EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month24JB
3018EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
3019EO Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
3020EO Biological Studies All Cooling and chill Systems Monthly12JB
3021EO Anaerobic bacteria testing on Main Chiller Quarterly4JB
3022EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month24JB
3023EO On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
3024EO Unscheduled Chemical Metering Pump, one time per year1EA
3025EO Unscheduled Injection Quils, once per year1EA
3026EO Unscheduled Tubing for injection, one roll per year1EA
3027EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
3028EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
3029EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
3030EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
3031EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year1EA
3032EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
3033EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total1EA
3034EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA
3035LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month24JB
3036LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month24JB
3037LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month24JB
3038LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month24JB
3039LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month24JB
3040LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month24JB
3041LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month24JB
3042LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month24JB
3043LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month24JB
3044LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month24JB
3045LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month24JB
3046LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month24JB
3047LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month24JB
3048LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
3049LY Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
3050LY Biological Studies All Cooling and chill Systems Monthly12JB
3051LY Anaerobic bacteria testing on Main Chiller Quarterly4JB
3052LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month24JB
3053LY On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
3054LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year1EA
3055LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year1EA
3056LY Unscheduled Chemical metering Pump, one time per year1EA
3057LY Unscheduled Injection Quils, once per year1EA
3058LY Unscheduled Tubing for injection, one roll per year1EA
3059LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
3060LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
3061LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
3062LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
3063LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year1EA
3064LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
3065LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total1EA
3066LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA

Option 4

Line ItemDescriptionFrequencyUnit of MeasureUnit PriceUnit Cost per Month (per year for quarterly/semi/annual services)Total Price
4001EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month24JB
4002EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month24JB
4003EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month24JB
4004EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month24JB
4005EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month24JB
4006EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month24JB
4007EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month24JB
4008EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month24JB
4009EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month24JB
4010EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month24JB
4011EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month24JB
4012EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month24JB
4013EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month24JB
4014EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month24JB
4015EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month24JB
4016EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month24JB
4017EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month24JB
4018EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
4019EO Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
4020EO Biological Studies All Cooling and chill Systems Monthly12JB
4021EO Anaerobic bacteria testing on Main Chiller Quarterly4JB
4022EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month24JB
4023EO On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
4024EO Unscheduled Chemical Metering Pump, one time per year1EA
4025EO Unscheduled Injection Quils, once per year1EA
4026EO Unscheduled Tubing for injection, one roll per year1EA
4027EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
4028EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
4029EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
4030EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
4031EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year1EA
4032EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
4033EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total1EA
4034EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA
4035LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month24JB
4036LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month24JB
4037LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month24JB
4038LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month24JB
4039LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month24JB
4040LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month24JB
4041LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month24JB
4042LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month24JB
4043LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month24JB
4044LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month24JB
4045LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month24JB
4046LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month24JB
4047LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month24JB
4048LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)2JB
4049LY Corrossion Study for all towers and main Chiller Water System. Twice a year2JB
4050LY Biological Studies All Cooling and chill Systems Monthly12JB
4051LY Anaerobic bacteria testing on Main Chiller Quarterly4JB
4052LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month24JB
4053LY On Site for Annual cleaning and Inspections for boiler plant and chill system.1JB
4054LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year1EA
4055LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year1EA
4056LY Unscheduled Chemical metering Pump, one time per year1EA
4057LY Unscheduled Injection Quils, once per year1EA
4058LY Unscheduled Tubing for injection, one roll per year1EA
4059LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year1EA
4060LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year1EA
4061LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year1EA
4062LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year1EA
4063LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year1EA
4064LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year1EA
4065LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total1EA
4066LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year1EA

Base and all Options Summary

Period:Price
Base Total
Option 1 Total
Option 2 Total
Option 3 Total
Option 4 Total
Base and All Options Total

File details come from the government source that posted it. Updated .