P09 Pricing Sheet NJ Water Treatment FINAL (1).xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- H246--Water Systems Testing and Treatment Federal contract opportunity
- Solicitation number
- 36C24221Q0366
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09 Pricing Sheet NJ Water Treatment FINAL-Amend.xlsx | XLSX spreadsheet | |
| 36C24221Q0366 0006_1.docx | DOCX document | |
| S06 36C24221Q0366 0006.docx | DOCX document | |
| AMEND 36C24221Q0366 0005.pdf | ||
| 36C24221Q0366 0005_1.docx | DOCX document | |
| 36C24221Q0366 0003.docx | DOCX document | |
| 36C24221Q0366 0002.docx | DOCX document | |
| 36C24221Q0366 0001.docx | DOCX document | |
| SAM-DESCRIPTION.docx | DOCX document | |
| P09 ATTACHMENT A.docx | DOCX document | |
| 36C24221Q0366.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Line Item | Description | Frequency | Unit of Measure | Unit Price | Unit Cost per Month (per year for quarterly/semi/annual services) | Total Price |
| 0001 | EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month | 24 | JB | |||
| 0002 | EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month | 24 | JB | |||
| 0003 | EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month | 24 | JB | |||
| 0004 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month | 24 | JB | |||
| 0005 | EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month | 24 | JB | |||
| 0006 | EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month | 24 | JB | |||
| 0007 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month | 24 | JB | |||
| 0008 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month | 24 | JB | |||
| 0009 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month | 24 | JB | |||
| 0010 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month | 24 | JB | |||
| 0011 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month | 24 | JB | |||
| 0012 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month | 24 | JB | |||
| 0013 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month | 24 | JB | |||
| 0014 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month | 24 | JB | |||
| 0015 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month | 24 | JB | |||
| 0016 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month | 24 | JB | |||
| 0017 | EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month | 24 | JB | |||
| 0018 | EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 0019 | EO Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 0020 | EO Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 0021 | EO Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 0022 | EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month | 24 | JB | |||
| 0023 | EO On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 0024 | EO Unscheduled Chemical Metering Pump, one time per year | 1 | EA | |||
| 0025 | EO Unscheduled Injection Quils, once per year | 1 | EA | |||
| 0026 | EO Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 0027 | EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 0028 | EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 0029 | EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 0030 | EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 0031 | EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 0032 | EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 0033 | EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total | 1 | EA | |||
| 0034 | EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA | |||
| 0035 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month | 24 | JB | |||
| 0036 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month | 24 | JB | |||
| 0037 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month | 24 | JB | |||
| 0038 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month | 24 | JB | |||
| 0039 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month | 24 | JB | |||
| 0040 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month | 24 | JB | |||
| 0041 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month | 24 | JB | |||
| 0042 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month | 24 | JB | |||
| 0043 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month | 24 | JB | |||
| 0044 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month | 24 | JB | |||
| 0045 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month | 24 | JB | |||
| 0046 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month | 24 | JB | |||
| 0047 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month | 24 | JB | |||
| 0048 | LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 0049 | LY Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 0050 | LY Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 0051 | LY Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 0052 | LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month | 24 | JB | |||
| 0053 | LY On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 0054 | LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year | 1 | EA | |||
| 0055 | LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year | 1 | EA | |||
| 0056 | LY Unscheduled Chemical metering Pump, one time per year | 1 | EA | |||
| 0057 | LY Unscheduled Injection Quils, once per year | 1 | EA | |||
| 0058 | LY Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 0059 | LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 0060 | LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 0061 | LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 0062 | LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 0063 | LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 0064 | LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 0065 | LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total | 1 | EA | |||
| 0066 | LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA |
Option 1
| Line Item | Description | Frequency | Unit of Measure | Unit Price | Unit Cost per Month (per year for quarterly/semi/annual services) | Total Price |
| 1001 | EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month | 24 | JB | |||
| 1002 | EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month | 24 | JB | |||
| 1003 | EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month | 24 | JB | |||
| 1004 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month | 24 | JB | |||
| 1005 | EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month | 24 | JB | |||
| 1006 | EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month | 24 | JB | |||
| 1007 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month | 24 | JB | |||
| 1008 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month | 24 | JB | |||
| 1009 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month | 24 | JB | |||
| 1010 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month | 24 | JB | |||
| 1011 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month | 24 | JB | |||
| 1012 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month | 24 | JB | |||
| 1013 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month | 24 | JB | |||
| 1014 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month | 24 | JB | |||
| 1015 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month | 24 | JB | |||
| 1016 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month | 24 | JB | |||
| 1017 | EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month | 24 | JB | |||
| 1018 | EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 1019 | EO Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 1020 | EO Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 1021 | EO Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 1022 | EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month | 24 | JB | |||
| 1023 | EO On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 1024 | EO Unscheduled Chemical Metering Pump, one time per year | 1 | EA | |||
| 1025 | EO Unscheduled Injection Quils, once per year | 1 | EA | |||
| 1026 | EO Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 1027 | EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 1028 | EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 1029 | EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 1030 | EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 1031 | EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 1032 | EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 1033 | EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total | 1 | EA | |||
| 1034 | EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA | |||
| 1035 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month | 24 | JB | |||
| 1036 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month | 24 | JB | |||
| 1037 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month | 24 | JB | |||
| 1038 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month | 24 | JB | |||
| 1039 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month | 24 | JB | |||
| 1040 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month | 24 | JB | |||
| 1041 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month | 24 | JB | |||
| 1042 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month | 24 | JB | |||
| 1043 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month | 24 | JB | |||
| 1044 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month | 24 | JB | |||
| 1045 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month | 24 | JB | |||
| 1046 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month | 24 | JB | |||
| 1047 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month | 24 | JB | |||
| 1048 | LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 1049 | LY Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 1050 | LY Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 1051 | LY Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 1052 | LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month | 24 | JB | |||
| 1053 | LY On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 1054 | LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year | 1 | EA | |||
| 1055 | LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year | 1 | EA | |||
| 1056 | LY Unscheduled Chemical metering Pump, one time per year | 1 | EA | |||
| 1057 | LY Unscheduled Injection Quils, once per year | 1 | EA | |||
| 1058 | LY Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 1059 | LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 1060 | LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 1061 | LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 1062 | LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 1063 | LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 1064 | LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 1065 | LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total | 1 | EA | |||
| 1066 | LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA |
Option 2
| Line Item | Description | Frequency | Unit of Measure | Unit Price | Unit Cost per Month (per year for quarterly/semi/annual services) | Total Price |
| 2001 | EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month | 24 | JB | |||
| 2002 | EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month | 24 | JB | |||
| 2003 | EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month | 24 | JB | |||
| 2004 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month | 24 | JB | |||
| 2005 | EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month | 24 | JB | |||
| 2006 | EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month | 24 | JB | |||
| 2007 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month | 24 | JB | |||
| 2008 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month | 24 | JB | |||
| 2009 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month | 24 | JB | |||
| 2010 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month | 24 | JB | |||
| 2011 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month | 24 | JB | |||
| 2012 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month | 24 | JB | |||
| 2013 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month | 24 | JB | |||
| 2014 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month | 24 | JB | |||
| 2015 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month | 24 | JB | |||
| 2016 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month | 24 | JB | |||
| 2017 | EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month | 24 | JB | |||
| 2018 | EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 2019 | EO Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 2020 | EO Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 2021 | EO Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 2022 | EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month | 24 | JB | |||
| 2023 | EO On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 2024 | EO Unscheduled Chemical Metering Pump, one time per year | 1 | EA | |||
| 2025 | EO Unscheduled Injection Quils, once per year | 1 | EA | |||
| 2026 | EO Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 2027 | EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 2028 | EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 2029 | EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 2030 | EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 2031 | EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 2032 | EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 2033 | EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total | 1 | EA | |||
| 2034 | EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA | |||
| 2035 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month | 24 | JB | |||
| 2036 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month | 24 | JB | |||
| 2037 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month | 24 | JB | |||
| 2038 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month | 24 | JB | |||
| 2039 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month | 24 | JB | |||
| 2040 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month | 24 | JB | |||
| 2041 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month | 24 | JB | |||
| 2042 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month | 24 | JB | |||
| 2043 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month | 24 | JB | |||
| 2044 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month | 24 | JB | |||
| 2045 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month | 24 | JB | |||
| 2046 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month | 24 | JB | |||
| 2047 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month | 24 | JB | |||
| 2048 | LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 2049 | LY Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 2050 | LY Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 2051 | LY Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 2052 | LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month | 24 | JB | |||
| 2053 | LY On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 2054 | LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year | 1 | EA | |||
| 2055 | LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year | 1 | EA | |||
| 2056 | LY Unscheduled Chemical metering Pump, one time per year | 1 | EA | |||
| 2057 | LY Unscheduled Injection Quils, once per year | 1 | EA | |||
| 2058 | LY Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 2059 | LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 2060 | LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 2061 | LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 2062 | LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 2063 | LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 2064 | LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 2065 | LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total | 1 | EA | |||
| 2066 | LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA |
Option 3
| Line Item | Description | Frequency | Unit of Measure | Unit Price | Unit Cost per Month (per year for quarterly/semi/annual services) | Total Price |
| 3001 | EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month | 24 | JB | |||
| 3002 | EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month | 24 | JB | |||
| 3003 | EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month | 24 | JB | |||
| 3004 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month | 24 | JB | |||
| 3005 | EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month | 24 | JB | |||
| 3006 | EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month | 24 | JB | |||
| 3007 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month | 24 | JB | |||
| 3008 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month | 24 | JB | |||
| 3009 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month | 24 | JB | |||
| 3010 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month | 24 | JB | |||
| 3011 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month | 24 | JB | |||
| 3012 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month | 24 | JB | |||
| 3013 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month | 24 | JB | |||
| 3014 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month | 24 | JB | |||
| 3015 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month | 24 | JB | |||
| 3016 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month | 24 | JB | |||
| 3017 | EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month | 24 | JB | |||
| 3018 | EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 3019 | EO Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 3020 | EO Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 3021 | EO Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 3022 | EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month | 24 | JB | |||
| 3023 | EO On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 3024 | EO Unscheduled Chemical Metering Pump, one time per year | 1 | EA | |||
| 3025 | EO Unscheduled Injection Quils, once per year | 1 | EA | |||
| 3026 | EO Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 3027 | EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 3028 | EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 3029 | EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 3030 | EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 3031 | EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 3032 | EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 3033 | EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total | 1 | EA | |||
| 3034 | EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA | |||
| 3035 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month | 24 | JB | |||
| 3036 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month | 24 | JB | |||
| 3037 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month | 24 | JB | |||
| 3038 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month | 24 | JB | |||
| 3039 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month | 24 | JB | |||
| 3040 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month | 24 | JB | |||
| 3041 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month | 24 | JB | |||
| 3042 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month | 24 | JB | |||
| 3043 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month | 24 | JB | |||
| 3044 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month | 24 | JB | |||
| 3045 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month | 24 | JB | |||
| 3046 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month | 24 | JB | |||
| 3047 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month | 24 | JB | |||
| 3048 | LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 3049 | LY Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 3050 | LY Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 3051 | LY Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 3052 | LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month | 24 | JB | |||
| 3053 | LY On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 3054 | LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year | 1 | EA | |||
| 3055 | LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year | 1 | EA | |||
| 3056 | LY Unscheduled Chemical metering Pump, one time per year | 1 | EA | |||
| 3057 | LY Unscheduled Injection Quils, once per year | 1 | EA | |||
| 3058 | LY Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 3059 | LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 3060 | LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 3061 | LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 3062 | LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 3063 | LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 3064 | LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 3065 | LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total | 1 | EA | |||
| 3066 | LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA |
Option 4
| Line Item | Description | Frequency | Unit of Measure | Unit Price | Unit Cost per Month (per year for quarterly/semi/annual services) | Total Price |
| 4001 | EO Testing, Chemical & Reagent,Supplies and Report of Main Chiller 1,2,&3, twice per month | 24 | JB | |||
| 4002 | EO Testing, Chemical & Reagent,Supplies and Report of OR Chiller & Bldg 15 Chiller, twice per month | 24 | JB | |||
| 4003 | EO Testing, Chemical & Reagent,Supplies and Report of Maint Closed Loop Plant, OR & Bldg 15, twice per month | 24 | JB | |||
| 4004 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, OR Heating System C-Level, twice per month | 24 | JB | |||
| 4005 | EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month | 24 | JB | |||
| 4006 | EO Testing , Chemical & Reagent,Supplies and Report of Building 1, 5C Heating System, twice per month | 24 | JB | |||
| 4007 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,Radiology Heating System A-236, twice per month | 24 | JB | |||
| 4008 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month | 24 | JB | |||
| 4009 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1,O.R. Heating System C-Level, twice per month | 24 | JB | |||
| 4010 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month | 24 | JB | |||
| 4011 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month | 24 | JB | |||
| 4012 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month | 24 | JB | |||
| 4013 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month | 24 | JB | |||
| 4014 | EO Testing, Chemical & Reagent,Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month | 24 | JB | |||
| 4015 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,B-level cooling system located in shack in front of building 7, twice per month | 24 | JB | |||
| 4016 | EO Testing, Chemical & Reagent,Supplies and Report of Building 7,A-level cooling system located in the penthouse, twice per month | 24 | JB | |||
| 4017 | EO Testing, Chemical & Reagent,Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month | 24 | JB | |||
| 4018 | EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 4019 | EO Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 4020 | EO Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 4021 | EO Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 4022 | EO Testing, Chemical & Reagent,Supplies and Report of Building 8, Boiler Plant, twice per month | 24 | JB | |||
| 4023 | EO On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 4024 | EO Unscheduled Chemical Metering Pump, one time per year | 1 | EA | |||
| 4025 | EO Unscheduled Injection Quils, once per year | 1 | EA | |||
| 4026 | EO Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 4027 | EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 4028 | EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 4029 | EO Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 4030 | EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 4031 | EO Unsheduled Continous Blowdown Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 4032 | EO Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 4033 | EO Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, four (4) in total | 1 | EA | |||
| 4034 | EO Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA | |||
| 4035 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 135, twice a month | 24 | JB | |||
| 4036 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 3, twice a month | 24 | JB | |||
| 4037 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 4, twice a month | 24 | JB | |||
| 4038 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 7, twice a month | 24 | JB | |||
| 4039 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 53, twice a month | 24 | JB | |||
| 4040 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 54, twice a month | 24 | JB | |||
| 4041 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 57, twice a month | 24 | JB | |||
| 4042 | LY Testing, Chemical & Reagent,Supplies and Report of (8) Closed Loop Hot, Bldg 143, twice a month | 24 | JB | |||
| 4043 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chilled Water Closed Loop System, Bldg 136, twice a month | 24 | JB | |||
| 4044 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Chillers, Bldg 136, twice a month | 24 | JB | |||
| 4045 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Chiller, Bldg 135, twice a month | 24 | JB | |||
| 4046 | LY Testing, Chemical & Reagent,Supplies and Report of (3) Cooling Towers, Bldg 136, twice a month | 24 | JB | |||
| 4047 | LY Testing, Chemical & Reagent,Supplies and Report of (1) Cooling Tower, Bldg 135, twice a month | 24 | JB | |||
| 4048 | LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October) | 2 | JB | |||
| 4049 | LY Corrossion Study for all towers and main Chiller Water System. Twice a year | 2 | JB | |||
| 4050 | LY Biological Studies All Cooling and chill Systems Monthly | 12 | JB | |||
| 4051 | LY Anaerobic bacteria testing on Main Chiller Quarterly | 4 | JB | |||
| 4052 | LY Testing, Chemical & Reagent,Supplies and Report of Building 14, Boiler Plant, twice per month | 24 | JB | |||
| 4053 | LY On Site for Annual cleaning and Inspections for boiler plant and chill system. | 1 | JB | |||
| 4054 | LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year | 1 | EA | |||
| 4055 | LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year | 1 | EA | |||
| 4056 | LY Unscheduled Chemical metering Pump, one time per year | 1 | EA | |||
| 4057 | LY Unscheduled Injection Quils, once per year | 1 | EA | |||
| 4058 | LY Unscheduled Tubing for injection, one roll per year | 1 | EA | |||
| 4059 | LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year | 1 | EA | |||
| 4060 | LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year | 1 | EA | |||
| 4061 | LY Unscheduled Sample Line Repair parts, Check valves, globe valves,nipples,piping, unions…etc., two times per year | 1 | EA | |||
| 4062 | LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year | 1 | EA | |||
| 4063 | LY Unsheduled Continous Blowdon Valve (Automatic), with actuator and ball valve, one per year | 1 | EA | |||
| 4064 | LY Unscheduled Conductivity Auto Controls, Continous Blowdown controller, one per year | 1 | EA | |||
| 4065 | LY Unscheuled Conductivity Electrode, To be replaced every six months on each boiler, five (5) in total | 1 | EA | |||
| 4066 | LY Unscheduled Orfice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year | 1 | EA |
Base and all Options Summary
| Period: | Price |
| Base Total | |
| Option 1 Total | |
| Option 2 Total | |
| Option 3 Total | |
| Option 4 Total | |
| Base and All Options Total |
File details come from the government source that posted it. Updated .