P04 VA Inspection Checklist Template.pdf
PDF 249 KB Posted
- Attached to
- H391--Fuel Tank Testing & Inspection Federal contract opportunity
- Solicitation number
- 36C26322Q0441
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26322Q0441 0001.docx | DOCX document | |
| S02 36C26322Q0441.pdf | ||
| P07 Wage Determination - Fargo.txt | TXT text file | |
| 36C26322Q0441.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
Health Care Systems
2101 N Elm Street
Fargo, ND 58102-2498
Aboveground and Underground Petroleum Storage
INSPECTION AND SCHEDULED MAINTENANCE CHECKLIST
Date ______________________________________________
Name of Company ___________________________________________________________
Technician Name ____________________________________________________________
Annual Triannual
Fuel Tank Number __________________________ Aboveground Underground
Tank Location _________________________________________________________________________
Contents #2 Diesel #1 Diesel
Capacity (gallons) 75 100 150 200 4,000 20,000
Construction Double-walled steel Other __________________________________
Container Steel Other ________________________________________
Please see next page for checklist
Annual Testing – minimum testing
TANK AND PIPING
1. Is tank exterior (roof, shell, heads, bottom, connections, fittings, valves, etc..)
free of visible leaks? Yes No
2. Are there any trip hazards with the tank pad or pavement? Yes No
3. Is the Vent Piping secured properly? Yes No
4. Is the containment area free of excess liquid, debris, cracks, corrosion, erosion, fire hazards and other integrity issues? Yes No
5. Are piping connections to the tank free of visible leaks?
Yes No
TANK SUBMERSIBLE PUMP INSPECTIONS
1. Are junction boxes sealed, free of corrosion, seal-offs present, intrinsically safe wiring in good condition? Yes No
2. Are the flexible connectors in good condition? Yes No
3. Are the piping connections to the STP in good condition? Yes No
UST SUMP INSPECTION
1. Inspection for water or product completed?
Inspection satisfactory? Yes No
2. Inspection of Sumps for cracks, penetration, or bulges Inspection satisfactory? Yes No
3. Penetration fittings inspected Inspection satisfactory? Yes No
4. Inspection of Sump sensor and Sensor Test completed Inspection satisfactory? Yes No
5. Inspection of Sump cover, gaskets and seals completed Inspection satisfactory? Yes No
6. Manway Inspection completed Inspection satisfactory? Yes No
DISPENSER INSPECTIONS
1. Inspection of dispenser leaks Inspection satisfactory? Yes No
2. Inspection of Electrical Junction boxes Inspection satisfactory? Yes No
3. Inspection of Safety Shear Valve Inspection satisfactory? Yes No
4. Inspection of Safety Shear Valve Mounting Inspection satisfactory? Yes No
5. Inspection of Dispenser Piping Inspection satisfactory? Yes No
ATG MANHOLE INSPECTIONS
1. Inspection of ATG Probe riser pipe Cap and Adaptor Inspection satisfactory? Yes No
2. Inspection of Electrical Junction Box Inspection satisfactory? Yes No
3. Inspection of ATG Manhole
Inspection satisfactory? Yes No
4. Inspection of ATG Manhole Inspection and cleaning complete? Yes No
SPILL/FILL MANHOLE INSPECTION
1. Inspection Overfill Valve and Drop Tube Inspection satisfactory? Yes No
2. Clean/Remove any buildup of sand, gravel, or dirt from the containment bucket and manhole top cast flange. Yes No
3. Inspection of containment bucket for cracks, penetrations, or other damage Inspection satisfactory? Yes No
ATG CONSOLE SYSTEM INSPECTION
System Status
Inspect Console has no active warnings or alarms Inspection satisfactory? Yes No
The Alarm history shows no recurring leak alarms Inspection satisfactory? Yes No
Verify in-tank leak detection tests are being completed Yes No
Verify piping leak detection tests are being completed Yes No
Programming Inspection
Verify correct set-up parameters for the in-tank test Yes No
Verify correct set-up parameters for electronic line leak detector Yes No
Triannual Testing – minimum testing
Spill bucket Sump Integrity Test Test satisfactory? Yes No
Overfill Prevention Equipment Functionality Test Test satisfactory? Yes No
Tank Cathodic Protection Test Test satisfactory? Yes No
Pipeline Cathodic Protection Test Test satisfactory? Yes No
Note: If “No”, identify any issue and action taken.
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box19: Off |
| Check Box4: Off |
File details come from the government source that posted it. Updated .