On-Call_Plumbing_Services..pdf
PDF 444 KB Posted
- Attached to
- On-Call Plumbing Services. State and local contract opportunity
- Solicitation number
- 25-069-RFP
- Issued by
- Yolo County, California
About this file
This is a Request for Proposals (RFP #25-069-RFP) issued by the City of West Sacramento, California, seeking qualified firms to provide on-call professional plumbing services for various City facilities. The services include repairs, maintenance, drain cleaning (cable or hydro-jetting), backflow certification testing, water leak repairs both above and below ground, restroom fixture maintenance, sewer line inspection with camera equipment, irrigation system maintenance, and pool/splashpad plumbing repairs. Vendors must hold a C36 plumbing license and be able to respond to emergency services within 2 hours of notification. The RFP was released on August 6, 2025, with questions due by August 19, 2025, and proposals due by August 27, 2025 at 2:00 pm through the City's electronic procurement portal. The initial contract term may be up to 3 years with the City's option to extend for up to 2 additional 1-year terms, creating a potential 5-year total contract period.
The City anticipates a contract value of no more than $68,500, though adjustments may be mutually agreed upon in writing if unanticipated expenses arise. Pricing must remain valid from September 1, 2025 through October 31, 2028, and contractors must furnish all labor, materials, tools, and equipment necessary to perform the services. The cost proposal includes detailed hourly rates for regular, after-hours, and weekend/holiday work across various plumbing services, plus truck charges per service call. Evaluation criteria includes proposal completeness (10.5%), proposer qualifications and experience (21.1%), proven ability (26.3%), technical approach (15.8%), acceptance of City's standard contract (5.3%), and cost proposal (21.1%). The work is subject to prevailing wage requirements and DIR registration, and contractors must provide comprehensive insurance coverage as specified in the City's standard contract terms.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Contract_for_Services_(West_Sacramento)_-_Boilerplate_for_RFP_11.4.24.docx | DOCX document | |
| Insurance_Checklist_2023.pdf | ||
| Contract_for_Services_(West_Sacramento)_-_Federal_Boilerplate_for_RFP_5.1.24.docx | DOCX document | |
| Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
25-069-RFP
ON-CALL PLUMBING SERVICES.
City of West Sacramento
1110 W Capitol Ave
West Sacramento, CA 95691
RELEASE DATE: August 6, 2025
DEADLINE FOR QUESTIONS: August 19, 2025
RESPONSE DEADLINE: August 27, 2025, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d
City of West Sacramento
REQUEST FOR PROPOSALS
On-Call Plumbing Services.
I. Introduction II. Scope of Work
III. Proposal Requirements IV. General Information V. Terms and Conditions
VI. Evaluation Criteria VII. Consultant Selection and Contract Award
VIII. Standard Contract Information IX. Proposer Questionnaire X. Cost Proposal
Attachments:
A - Contract for Services (West Sacramento) - Boilerplate for RFP 11.4.24
B - Insurance Checklist
Request for Proposals #25-069-RFP Title: On-Call Plumbing Services.
1. Introduction
1.1. Summary
Please state the Statement of Purpose of this Solicitation, being as descriptive as possible.
STATEMENT OF PURPOSE
The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide On-Call Plumbing Services. More details on the City's needs for this work are provided in the
Scope of Work.
Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal
("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."
SYNONYMOUS TERMS
Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous:
a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror
b. Purchase Order, Contract, Agreement
c. Services, Work, Scope, and Project
d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet
1.2. Background
West Sacramento is a vibrant riverfront community centrally located in Northern California. West
Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and over 400 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.
https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169289
1.3. Contact Information
Jason Puopolo
Superintendent of Parks Operations
1951 S River Rd
West Sacramento, CA 95691
Email: jasonp@cityofwestsacramento.org
Phone: (916) 617-4817
Department:
Parks and Recreation
1.4. Timeline
Project Release Date August 6, 2025
Question Submission Deadline August 19, 2025, 3:00pm
Question Response Deadline August 22, 2025, 3:00pm
Proposal Submission Deadline August 27, 2025, 2:00pm mailto:jasonp@cityofwestsacramento.org tel:(916)617-4817
2. Scope of Work
2.1. Scope of Work
The following is a list of tasks that are intended to be the responsibility of the Contractor pursuant to this Request for Proposals ("Scope of Work ").
The City of West Sacramento Parks & Recreation Department is seeking a vendor to provide on-call professional plumbing support services, including but not limited to; repairs, maintenance, drain cleaning (cable or hydro-jetting) and backflow certification testing services on an as-needed basis at various City of West Sacramento facilities.
• Vendor must have a C36 plumbing license
• Vendor must be able to respond to emergency services within 2 hours of being notified.
• The contractor shall provide plumbing-related maintenance, repair, and inspection services on an as-needed basis. Services may include, and are limited to:
o Repair and replacement of various types and sizes of water piping systems, both above and below ground.
o Maintenance, repair, or replacement of restroom fixtures and associated plumbing components.
o Clearing of drains and sewer lines using appropriate equipment and techniques.
o Provision of drain cleaning equipment and tools capable of addressing a range of drain and sewer maintenance needs.
o Sewer line inspection services utilizing camera equipment with the ability to capture and provide visual documentation.
o Backflow prevention assembly testing, certification, maintenance, and repair services, including the provision of certified personnel.
o Maintenance and repair services for irrigation systems and related components.
o Maintenance and repair services for pools, splashpads, and other similar equipment. These repairs exclude any work outside of plumbing infrastructure.
• The contractor shall furnish all labor, materials, tools, and equipment necessary to perform these services in a safe, timely, and professional manner https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169289
2.2. ADDITIONAL INFORMATION
• PRICING MUST BE VALID from September 1, 2025 - October 31, 2028
• Any incomplete bid will be ruled unresponsive and may not be considered for an award.
• Any parts listed reflect typical parts used for bid comparison purposes only. Actual purchase may vary.
2.3. Equipment and Supplies
The Contractor shall furnish all tools, materials, supplies, and equipment to perform the tasks outlined in the Scope of Work.
2.4. Estimated Project Value
The City anticipates that the Contract shall be for no more than $68,500. However, should unanticipated expenses arise, the City and Contractor may mutually agree in writing to price adjustments pursuant to the terms of the executed contract.
2.5. Term of Contract
The initial term of the Contract is at the City's discretion and may be up to 3 years. The City also reserves the right to extend the Contract for up to 2 additional 1-year terms (individually, “Extension”) upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 5 years upon the same terms and conditions as parties agreed in the Contract.
Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time.
If there is outstanding work within the Scope of Work at the end of the term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor.
3. Proposal Requirements
3.1. Proposal Format & Content
Proposer Questionnaire must include each of the following sections to be uploaded in the Proposer
Questionnaire section.
A. Proposal Transmittal Letter
B. Proposer's Mandatory Qualifications and Experience
C. Technical Project Approach
D. Cost Proposal
Specific content and format requirements for each section are detailed below.
Each section shall be uploaded in the Proposer Questionnaire section of this RFP.
3.2. Proposal Transmittal Letter
A Proposer is required to provide a written transmittal letter and offer in the form of a standard business letter ("Proposal Transmittal Letter" or "Letter"). The Proposal Transmittal Letter shall reference and respond to the following subsections in sequence and have attached to it corresponding documentation, as required. A Proposal Transmittal Letter is mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected.
A. Proposer's Name and Contact.The Letter shall state the complete name, or business name, of the Proposer making the Proposal. The Letter shall state the name, title, mailing address, email address, and telephone number of the person the City should contact regarding the Proposal.
B. Statement of Offer. The Letter shall state that the Proposal is an offer to complete the Scope of
Work and the offer, including the Cost Proposal rates and budget, remains valid for at least ninety (90) business days after the Proposal due date.
C. Conflict of Interest.The Letter shall state whether the Proposer, or any individual who shall perform work under the Contract, has a possible conflict of interest and, if so, the nature of that conflict. The City reserves the right to terminate the Contract if its execution would or could create, or give the appearance of creating, a conflict of interest. The City, at its sole discretion, shall make all determinations on the existence or appearance of a conflict of interest.
D. City Contract Terms. The Letter shall include a statement of acknowledgement that the City’s standard contract and insurance (Included in Attachments) have been reviewed and accepted by the Proposer with or without qualification.
1. If the Proposer has qualifications, the Proposer shall download a copy of the standard contract and re-upload a version of the document in the Proposer Questionnaire under https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169284 https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169284 https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=undefined https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169293 https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=1169284
Standard City Contract Qualifications identifying the contract language at issue and
Proposer's suggested adjustment or modification.
2. If no qualifications are identified, Proposer is presumed to have accepted the City' standard contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification.
E. Subcontractors. The Letter shall state whether the Proposer intends to use subcontractors, subconsultants, or other contracting parties to complete the Scope of Work (collectively, "Subcontractors"). If so, the Letter shall clearly identify the name of each proposed
Subcontractor, their mailing address, email address, and telephone number as well as the service related to the Scope of Work that the Subcontractor is anticipated to perform. NOTE:
The Contractor must obtain written approval from the City prior to the use of any
Subcontractor, even after a Contract is executed.
F. Signature and Authority. The Letter shall be signed by a person empowered to bind the
Proposer to the provisions of the RFP, and any contract awarded pursuant to it. Evidence demonstrating authority to bind the Proposer shall be included or attached to the Letter, such as a statement describing the signatory's role with or relationship to the Proposer.
3.3. Proposer's Mandatory Qualifications and Experience
A Proposal shall demonstrate that the Proposer holds the qualifications and experience required to complete the Scope of Work by referencing and responding to the following subsections in sequence and attaching corresponding documentation, as required ("Mandatory Qualifications and Experience").
The qualifications and experience listed below are mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected.
A. Organization. A brief description of Proposer's background, years in business, organizational history, and client base. Briefly state Proposer's total number of employees and list all relevant licenses, specialties, and trainings held by Proposer and/or employees. List office location(s) and identify the office(s) from which services will be performed.
B. Experience. A brief statement of how long Proposer has been performing the services required to complete the Scope of Work. Proposer shall have a minimum of five (5) years of experience providing the services required to complete the Scope of Work to public agencies in California. If the Proposer has been in business for less than five years, the experience of its principals may be used to meet this requirement.
C. Public Agency Experience.A description of no more than ten (10) public sector projects completed within the last five (5) years that demonstrates Proposer's experience performing services to complete the Scope of Work, including a statement as to whether Proposer has experience working for the City of West Sacramento, or a public agency similar in size to the
City. Note key personnel involved in each project and if they are proposed for this Proposal and if applicable, differentiate which work was performed by subcontractor. List any contractual relationships with the City existing now or within the past five (5) years.
D. Personnel.A narrative description, resume, and organizational structure chart of personnel to be assigned to complete tasks within the Scope of Work, clearly indicating where Subcontractors will be used, if applicable. The narrative description or resume shall list, at least, each individual’s title, education, relevant experience and duration, professional licenses, and demonstrated accomplishments. Identify the individual who will lead the day-to-day work effort and serve as the primary contact to the City.
E. References. A list of five (5) references for whom the services required to complete the Scope of
Work have been performed by Proposer within the last three (3) years. The list of references shall include name, mailing address, email address, brief description of services completed relevant to this RFP, and point of contact who can attest to the quality and effectiveness of the services.
F. Local Benefit.A statement describing any and all local benefit the Proposer would bring to the
Contract. For example, local benefit may include but is not limited to local vendors, suppliers, labor or subcontractors used in support of the project as well as fees or taxes paid to the City. To the extent practical, the local benefit described with the Proposal should be measurable. At the end of the Contract, the Contractor shall be required to provide a report detailing the measures taken to enhance the local benefit and whether or not stated goals were met. For purposes of this section, a local vendor or service provider is one located within the City limits and in possession of a West Sacramento business license. If the solicitation has Federal funds, there will be no Local Benefit considered.
G. History.A statement as to whether there have been any mergers, acquisitions, or sales related to
Proposer's organizational structure within the last three (3) years. If so, attach an explanation providing relevant details.
H. Legal Challenges.A statement as to whether there is any pending litigation against the Proposer.
If such litigation exists, attach an opinion of counsel as to whether the pending litigation will impair the Proposer's ability to perform the Contract.
I. Fiscal Viability. A statement as to whether, in the last ten (10) years, the Proposer has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors. If so, attach an explanation providing relevant details.
J. Business License.Registration with the Secretary of State to conduct business in the State of
California. Attach a copy of a proof of registration.
K. Department of Industrial Relations. Contractor registration with the State of California
Department of Industrial Relations. Attach a copy of proof of registration.
3.4. Technical Project Approach
A document detailing the operational and/or organizational approach the Proposer will take to timely fulfill the Scope of Work shall be submitted with the Proposal ("Technical Project Approach"). The
Technical Project Approach shall be a comprehensive narrative describing how the Proposer will complete the Scope of Work, communicate with the City throughout the work, advance the project objectives, and provide continuity on work efforts.
3.5. Cost proposal using Electronic Pricing Table
Proposers shall use the electronic Rate Sheet to provide pricing for services listed. Proposers shall use the "no bid" option to opt out of any services not offered. Costs shall include all applicable federal, state, and local taxes and must be all-inclusive of project expenses, as no additional charges shall be allowed, except for additional services as requested by the City, if any. The City will not be responsible for any errors.
For sealed bids, the Cost Proposal shall be opened after and separately from the rest of the Proposal. If applicable, the Cost Proposal shall separately delineate costs for optional term extensions and/or optional services. Proposer agrees to maintain pricing for the duration of the Contract, and any optional extensions.
https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=undefined
4. General Information
4.1. Proposal Submission
All Proposals, including any attachments, exhibits, or amendments, shall be submitted through the City's
E-Procurement Portal, which will deliver Proposals to the City of West Sacramento staff overseeing the solicitation. Proposals not submitted through the City's E-Procurement Portal shall be deemed nonresponsive and rejected. Proposals may not be delivered orally, by paper, by email, by facsimile transmission, or by any other means.
All proposals shall be submitted through the City’s e-Procurement Portal no later than:
Wednesday, August 27, 2025 at 2:00 pm.
A Proposer shall respond to the RFP and any exhibits, attachments, or amendments.
A Proposer's failure to submit a Proposal in compliance with the procedures and timelines set forth in the RFP shall cause the Proposal to be deemed nonresponsive and rejected. A late Proposal shall not be accepted. Additional time to respond shall not be granted to any Proposer.
4.2. Questions and/or Objections
It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the RFP and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this RFP and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).
A Proposer may submit Questions related to this RFP to the City through the City’s e-Procurement Portal at or before:
Tuesday, August 19, 2025 at 3:00 pm.
Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.
Any revisions to the Standard Contract should be in the Proposal Transmission Letter and shown in redline, as described above.
4.3. General Proposal Format Requirements
A. The City discourages lengthy and costly proposals. A Proposal should be prepared simply and economically and provide a straightforward, concise description of the Proposer's capabilities to satisfy the requirements of this RFP. Emphasis should be on conformity to the City’s instructions, requirements of this RFP, and completeness and clarity of content.
https://secure.procurenow.com/portal/CityofWestSacramento https://secure.procurenow.com/portal/CityofWestSacramento
B. A Proposal must address all portions of the RFP, provide all information requested, and comply with all formatting requirements detailed herein.
C. A Proposal must be labeled and organized as requested in this RFP, including using section headers. Failure to follow the specified format, to label the responses correctly, or to address all of the subsections may, at the City’s sole discretion, result in the rejection of a Proposal.
D. A Proposal must not contain extraneous information. All information presented in a Proposal must be relevant to, and in response to, a requirement of this RFP. Any information not meeting these criteria shall be deemed extraneous and shall in no way contribute to the evaluation process.
E. A Proposal shall be prepared on standard 8 1/2" x 11" formatted electronic documents. Foldouts containing charts, spreadsheets, and other exhibits are permissible but Proposer shall be reminded that responses will be read electronically through the City’s e-Procurement Portal.
F. All responses, as well as any reference material presented, must be written in English.
G. All monetary amounts must be detailed in United States currency.
H. All uploaded proposal pages must be numbered. Proposals shall be limited to a total of twenty-five (25) pages and should not include unnecessary company advertisement material. Resumes and references are part of the proposal package and will be included as part of the total page count. Cost proposals may be excluded.
4.4. Proposal Preparation, Interview, and Negotiation Costs
The City shall not be responsible for, nor shall it pay, any costs associated with the preparation, proposal, or presentation of any Proposal, or costs incurred by the Proposer during the preparation of the Proposal, the Proposal Evaluation Process, or Contract Award Process.
4.5. Proposal Withdrawal
A Proposal may be withdrawn at any time by clicking "unsubmit" on the City's e-Procurement Portal. If after withdrawing a Proposal and before the deadline to submit a Proposal, a Proposer may submit another Proposal.
4.6. Proposal Amendment
A Proposal may be amended prior to the deadline to submit a Proposal by unsubmitting and resubmitting a Proposal on the City's e-Procurement Portal. After the deadline to submit a Proposal, the
City shall not accept any amendments, revisions, or alterations to a Proposal.
4.7. Proposal Errors
Proposers are liable for all errors or omissions contained in their Proposal. A Proposer is prohibited from altering a Proposal through any means after the deadline for submitting a proposal.
4.8. Incorrect Proposal Information
If the City determines that a Proposer has provided, for consideration in the Proposal Evaluation Process or Contract Award Process incorrect information which the Proposer knew or should have known was materially incorrect, the Proposal may be rejected by the City, at its sole discretion.
5. Terms and Conditions
5.1. Prevailing Wages
A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this
RFP is subject to compliance monitoring and enforcement by the DIR.
B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full.
5.2. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic
Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of
Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
5.3. Assignment and Subcontracting
The Contractor may not subcontract, transfer, or assign any portion of the Contract without prior written approval from the City. Any subcontractor, subconsultant, or other contracting parties
(collectively, "Subcontractor") must be specifically approved in writing by the City. Inclusion of a subcontractor in a Proposal does not guarantee the City's later approval of a Subcontractor.
Notwithstanding the use of an approved Subcontractor, the Contractor shall remain the prime contractor and responsible for all work performed under the Contract and pursuant to this RFP.
5.4. RFP Amendment and Cancellation
The City reserves the right to amend, cancel, or reissue this RFP at any time and at its sole discretion.
Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the RFP page to receive notifications and shall be solely responsible for complying with such notifications.
5.5. Right of Rejection
A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this RFP in its entirety.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
B. A Proposer must comply with all of the terms and instruction of this RFP, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this RFP may be considered to be nonresponsive and rejected.
C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.
D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the RFP requirements or excuse the Proposer from full compliance with the RFP. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the RFP.
5.6. Prohibition of Respondent Terms and Conditions
A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this RFP.
5.7. Joint Ventures and Partnering
A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:
A. The Proposal shall respond to each section and subsection of this RFP.
B. The Proposal shall clearly set forth the respective responsibilities and functions that each
Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this RFP.
C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this RFP.
D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.
5.8. Proposal of Alternate Services
A Proposal for alternate services (i.e., proposals that offer something different from that requested by the RFP) will be considered nonresponsive and rejected.
5.9. Proposal of Additional Services
A Proposal may indicate and offer services in addition to those required by this RFP. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the
Contract before execution.
5.10. Severability
If any provision of this RFP is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and
Proposers shall be construed and enforced as if the RFP did not contain the particular provision held to be invalid.
5.11. Licensure and Special Certification
Before executing the Contract pursuant to this RFP, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all
Proposers to submit evidence of proper licensure and certifications.
5.12. Disclosure of Proposal Contents
All Proposals and other materials submitted to the City related to this RFP shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals and shall be open for review by the public to the extent required by the California Public
Records Act, Government Code section 6254 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.
Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
5.13. Conflict of Interest and Restrictions
By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this RFP.
5.14. Local Benefit Definition
The Proposer is invited to provide a statement describing any and all local benefit the Proposer would bring to the Contract. For example, local benefit may include but is not limited to local vendors, suppliers, labor or subcontractors used in support of the project as well as fees or taxes paid to the City.
To the extent practical, the local benefit described with the Proposal should be measurable. At the end of the Contract, the Contractor may be required to provide a report detailing the measures taken to enhance the local benefit and whether or not stated goals were met.
For purposes of this section, a local vendor or service provider is one located within the city limits and in possession of a West Sacramento business license.
5.15. Proprietary Information
A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.
Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.
Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.
6. Evaluation Criteria
No. Evaluation Criteria Scoring Method Weight (Points)
1. Proposal Transmittal Letter
Information and completeness of a Proposal
Transmittal Letter in conformity with the requirements in the RFP.
Points Based 10 (10.5% of Total)
2. Proposer Qualifications and Experience
Qualifications and experience of the Proposer and members of the team that may be assigned tasks within the Scope of Work.
Points Based 20 (21.1% of Total)
3. Proven Ability
Ability to complete the Scope of Work, as described in the Proposal, including experience completing projects for public agencies similar to the City.
Points Based 25 (26.3% of Total)
4. Technical Approach
Operational and organizational approach to complete the Scope of Work.
Points Based 15 (15.8% of Total)
5. Acceptance of City's Standard Contract for
Services
Ability to accept the City’s Standard Contract with little to no qualifications.
Points Based 5 (5.3% of Total)
6. Cost Proposal or Rate Sheets
Cost-effectiveness to complete the Scope of
Work. Note that the City’s evaluation process is intended to identify the Proposer with the best combination of attributes; cost is not the exclusive attribute and the lowest Proposer is not guaranteed to be offered a Contract.
Points Based 20 (21.1% of Total)
7. Consultant Selection and Contract Award
7.1. Proposal Evaluation Process
The Proposal review and evaluation process will comply with the following processes ("Proposal
Evaluation Process"):
A. The Proposal Evaluation Process is designed to establish a list of qualified Proposers with the best combination of attributes based upon the Evaluation Criteria.
B. The City's Proposal Evaluation Process is intended to identify the Proposer with the best combination of attributes. Cost is not the exclusive attribute and the lowest Proposer is not guaranteed to be offered a Contract.
C. The Project Contact, identified in the "Contact Information" of this RFP, shall manage the
Proposal Evaluation Process and maintain all records related to the process.
D. The Project Contact shall conduct an initial review of all Proposals and determine if each
Proposal is in compliance with the requirement specified in this RFP and, thereby, responsive.
E. The Project Contact shall work with selected City staff whose specialties and responsibilities are relevant to this RFP (collectively, "Evaluation Team") to complete the evaluation process.
F. The Evaluation Team shall evaluate all responsive Proposals. Each Evaluation Team member shall score each responsive Proposal based on the Evaluation Criteria.
G. The City reserves the right, at its sole discretion, to request clarification of any Proposal. Any such communication shall only be after initial evaluation by the Evaluation Team and only for the purpose of ensuring full understanding of the Proposal. Any clarification shall be made by the Proposer in writing.
H. Proposers with the highest scores pursuant to the Evaluation Criteria may be asked to complete an interview. The City reserves the right, at its sole discretion, to request an interview. If requested, interviews shall be conducted as provided in this RFP.
7.2. Proposer Interviews
The top-rated Proposers with the highest score from the Evaluation Criteria may be interviewed and rated. The City reserves the right, at its sole discretion, to request interviews. If interviews are held, they will occur at a time and location to be specified or virtually via a City internet platform.
A. Interviews will be conducted by the Evaluation Team and in a format determined by the Team, generally consisting of Team questions and Proposer presentations. The interviews will be limited to one (1) hour. The Evaluation Team shall use the Evaluation Criteria to rate Proposers during the interview.
B. Interviews shall be attended by the individual identified in the Proposal as the primary contact to the City on a day-to-day basis and members of the proposed team identified in the
"Personnel" section of the Mandatory Qualifications and Experience.
C. Following all interviews, the Evaluation Team will re-rank the Proposers to determine the highest ranked Proposers. Then, the Project Contact will open the sealed Cost Proposals for the highest ranked Proposers and re-rank the highest ranked Proposers based on overall ranking and Cost Proposal.
7.3. Contract Award Process
The contract selection and award process shall comply with the following process ("Contract Award
Process"):
A. The Project Contact shall invite the Proposer with the highest score from the Proposal
Evaluation Process to participate in contract negotiations with the City.
B. Proposer and City shall negotiate the final terms and conditions of the Contract, pursuant to this
RFP. The Contact shall contain the same, or substantially the same, terms and conditions as portrayed in this RFP, the Scope of Work, the Proposal, and the City's Standard Contract.
C. Following negotiations, the City shall draft a contract for execution by all parties. If the Proposer fails to sign and return the Contact within seven (7) working days of its delivery to the Proposer, the City may determine, at its sole discretion, that the Proposer is nonresponsive to the terms of this RFP and initiate further Proposal Evaluation Processes.
D. City records related to this RFP shall be made available for public inspection, as permitted by law, following Contract execution, or rejection of all Proposals.
E. The City reserves the right to accept or reject any or all Proposals.
8. Standard Contract Information
8.1. Standard Contract
The Contract executed pursuant to this RFP shall contain the same, or substantially the same, terms as provided in the City of West Sacramento Standard Professional Services Contract (provided in
Attachments). Capitalized and bracketed items shall be replaced with appropriate information in the final contract.
This RFP, including the Scope of Work, and the successful Proposal emanating from the RFP process shall be incorporated into the Contract.
8.2. Insurance Requirements
The apparent successful Proposer will be required to provide proof of insurance as set forth in the
Standard Contract and Insurance Requirements, both found in Attachments, prior to commencing work.
Exceptions to City insurance requirements will not be made. Any Proposer unable to meet the insurance requirements, as detailed, shall not be eligible for selection or award of a Contract.
8.3. Contract Approval
This RFP, Proposal Evaluation Process and Contract Award Process do not obligate the City to act in any certain way and do not create rights, interests, or claims of entitlement to any Proposer or any other entity. Any perceived or actual obligation of the City related to this RFP shall not commence until after the Contract is fully executed in compliance with City ordinances and regulations to establish a legally binding contract.
8.4. Contract Payment
Contract payments shall only be made in accordance with the terms and conditions of the Contract and only after the Contract is fully executed in compliance with City ordinances and regulations. No payment shall be made until the Contract is executed. The City shall not be liable for any payment related to this
RFP or the Scope of Work prior to the execution of the Contact, even if the services or work is done in good faith or reliant on oral promises.
8.5. Contract Monitoring
The Contractor shall be responsible for the completion of all services required to complete the Scope of
Work. All services, work, and tasks pursuant to the Scope of Work are subject to inspection, evaluation, and acceptance by the City. The City may employ all reasonable means to ensure that the Scope of Work is progressing and being performed in compliance with the Contract, including, but not limited to, inspection of Contractor's office, records, files, and other materials and places related to the Scope of
Work. If the City wishes to conduct such an inspection, the Contractor shall provide reasonable access and assistance.
https://secure.procurenow.com/portal/cityofwestsacramento/projects/130347/document?section=undefined
8.6. Contract Amendment
During the course of the Contract, the City may request the Contractor to perform additional services for which the Contractor would be compensated. Those services shall be within the general scope of this
RFP. In such instances, the City shall provide the Contractor a written description of the additional work, and the Contractor shall submit a time schedule and cost proposal for completing the additional services, based on either the rates included in the Contractor's Proposal to this RFP or else a fixed fee that is mutually agreed to by City and Contractor, whichever is lowest. If the City and Contractor reach an agreement regarding the services and associated compensation, said agreement shall become effective by means of an amendment to the Contract.
9. Proposer Questionnaire
9.1. Proposal Requirements*
Please confirm that you have read and met all of the Proposal Requirements.
☐ Yes
☐ No
*Response required
9.2. W-9 Form*
Please download the attached 2024 version of the W-9 form, complete, and upload.
• W-9_Form_ver._2024_-_BLANK.pdf
*Response required
9.3. Please enter Legal Company Name and any related DBA*
Please enter the full legal company name and any other business names related to this proposal registered with the Secretary of State to conduct business in the State of California.
*Response required
9.4. Type of Business*
Please confirm your form of business.
☐ Individual
☐ Sole Proprietor
☐ Corporation
☐ Non-Profit Corporation
☐ Partnership
☐ Joint Venture
☐ Limited Liability Company
*Response required
9.5. California Contractors State License Board #
Please provide your Contractors License #, if applicable.
9.6. Proposal Documents without Cost Proposal*
Please upload all of the following Proposal Documents here and in the following order, WITHOUT any
Cost Proposal documents.
A. Proposal Transmittal Letter
B. Proposer's Mandatory Qualifications and Experience
C. Technical Project Approach
*Response required https://government-project.s3.us-west-2.amazonaws.com/4470/1b710ad4-dece-445e-ad69-a3a9e82d89d2_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BDK5DWS5%2F20250807%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250807T023310Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEkaCXVzLXdlc3QtMiJHMEUCIQDOTzsi3ui6W8Aqz6NRoJd4wcuAgZIep19rUtdvLXEr9wIgPyAvztJ%2BIchxzy6IqXuXWkmuyxCD%2F%2Bn719267Hpm6UUqjAUIgv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDKbwZ94YgXGo7BUd8irgBCk3VXsXuiYGrwcEGsZ96PcaxABfRdVeaTFW810sOi0w8em2nR6a5B2HiIFwm0B0%2FvKx%2BzzkhDs7TOPjdvNSXCTLeJxUXlc23jfSEg4jNof%2B9vjhjodMbKwHxBQwGhJYGBqKuMJQjtaeb4%2FECOtNAERZVXWzr0nNoQqJS%2Fv9ybK1CxKhuDF4Zv%2FUMo7QHie7gXE4Xh4CbQJj97KqkdcP23ZEgKqkKO1ebncwMSwnPIu7HDqVf7BJdbUEZ82gwEvh5QLbSAusMrfBBna%2BriybPBlXtXCLmWIJfyxNlFMhBs5BR89%2FdHONKG2jHl2IKkO5NzKzrI2hfO2tmY4VojiyOapY4tKCHtT%2FO0SlBHMwlaEJtRLmkiDt9SQlzbO89W3UWihbuGUw1qhLKQaPavkBCJiO1zVJWyxo75B1Om%2Bgxx7JDkPFhAvmxUfcAewuwXtP6cWRuIVjMKTv2IY7D8uomgyXqXQ%2FOLV%2F1HC1qddodKytpn4yGsx3ib9mBOD2nUoVcjBBeH1xmySShgXBUe6pWJOXNCw%2Flw4veLlBR%2BxBy7Bhk7WBM5V4cUFWUCRLlLgAelww0CXLa0i4f3Rz8Q6aY9xQRzJe6HuVQNKM0DzoEgUT1RNLJpNzbTn0p50oO1kia0JwKkVgT0DRtn%2BxKZr1UMaROJvxwphZt6rSE6%2BKGAlAQJRFKhnMcSqREhIHFpZz%2FWRnTMIIKSgRjXR%2Fcs5vis4Aa44OBQUiFnjudm6lfJ9NZu5zwD7I3KDZxKNn0Sz%2FpU%2B%2FKHDvEFFEyIt7vOk0UrRO5u5wsPwDTYJr0%2BLnpunBMOX6z8QGOpsBAv1pzw5MKZSR5d%2B6nS5iIsKt1P7krgzEQ274jJD8KyR7L%2B5VpqkiPitv7hHSbtwWoYFgFONPZU7RDyR9S16MNhdcMhDNT0ZBU7OJ6ZG7p3ZswL66n5EcawsNDzLZ00pH6%2F6YtmyDphURmjVBCZaeYxa5BQjQGwvF%2B6diOn%2FBUF4%2BtFnXTwnCOnTPbrgfXEBQiWyJNotDSfJKxAU%3D&X-Amz-Signature=e9c1c2420419493e67a3f0612b06db564e5daea5ec50542c6a4c282140381fd4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject
9.7. Cost Proposal using Pricing Table*
The bidder acknowledges that a Cost Proposal for Professional Services must be submitted via the City's e-Procurement Portal and will be kept separate from the rest of the response.
☐ Please confirm
*Response required
9.8. Standard City Contract Qualifications
If the Proposer has contract qualifications, the Proposer shall upload a redlined copy of the contract found in Attachments; clearly identifying the Contract language at issue and suggested adjustment or modification in redline.
If no qualifications are identified, Proposer is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract and this question may be bypassed.
9.9. Insurance Requirements*
The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the
Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.
Proposer shall be required to provide proof of requisite insurance prior to Contract execution. Failure to do so shall be just cause for forfeiture of the Proposal guaranty and/or rejection of the Proposal.
☐ Please confirm
*Response required
9.10. Certification Regarding Debarment
The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.
A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.
Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.
For all other proposers, the completed form is sufficient.
• Certification_Regarding_Deb...
9.11. Other Documentation*
Please upload American California/Nevada Water Works Association (AWWA) Backflow Prevention
Assembly Tester Certification documentation required by this RFP here as well as any additional documentation that you feel would be a value to your submitted proposal. For example: Awards, Licenses, DIR Registration, etc.
https://procurement.opengov.com/portal/cityofwestsacramento/projects/130347/document?section=undefined https://government-project.s3.us-west-2.amazonaws.com/4470/8055f7cf-db86-4996-86f6-dcce46ede64f_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BDK5DWS5%2F20250807%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250807T023310Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEkaCXVzLXdlc3QtMiJHMEUCIQDOTzsi3ui6W8Aqz6NRoJd4wcuAgZIep19rUtdvLXEr9wIgPyAvztJ%2BIchxzy6IqXuXWkmuyxCD%2F%2Bn719267Hpm6UUqjAUIgv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDKbwZ94YgXGo7BUd8irgBCk3VXsXuiYGrwcEGsZ96PcaxABfRdVeaTFW810sOi0w8em2nR6a5B2HiIFwm0B0%2FvKx%2BzzkhDs7TOPjdvNSXCTLeJxUXlc23jfSEg4jNof%2B9vjhjodMbKwHxBQwGhJYGBqKuMJQjtaeb4%2FECOtNAERZVXWzr0nNoQqJS%2Fv9ybK1CxKhuDF4Zv%2FUMo7QHie7gXE4Xh4CbQJj97KqkdcP23ZEgKqkKO1ebncwMSwnPIu7HDqVf7BJdbUEZ82gwEvh5QLbSAusMrfBBna%2BriybPBlXtXCLmWIJfyxNlFMhBs5BR89%2FdHONKG2jHl2IKkO5NzKzrI2hfO2tmY4VojiyOapY4tKCHtT%2FO0SlBHMwlaEJtRLmkiDt9SQlzbO89W3UWihbuGUw1qhLKQaPavkBCJiO1zVJWyxo75B1Om%2Bgxx7JDkPFhAvmxUfcAewuwXtP6cWRuIVjMKTv2IY7D8uomgyXqXQ%2FOLV%2F1HC1qddodKytpn4yGsx3ib9mBOD2nUoVcjBBeH1xmySShgXBUe6pWJOXNCw%2Flw4veLlBR%2BxBy7Bhk7WBM5V4cUFWUCRLlLgAelww0CXLa0i4f3Rz8Q6aY9xQRzJe6HuVQNKM0DzoEgUT1RNLJpNzbTn0p50oO1kia0JwKkVgT0DRtn%2BxKZr1UMaROJvxwphZt6rSE6%2BKGAlAQJRFKhnMcSqREhIHFpZz%2FWRnTMIIKSgRjXR%2Fcs5vis4Aa44OBQUiFnjudm6lfJ9NZu5zwD7I3KDZxKNn0Sz%2FpU%2B%2FKHDvEFFEyIt7vOk0UrRO5u5wsPwDTYJr0%2BLnpunBMOX6z8QGOpsBAv1pzw5MKZSR5d%2B6nS5iIsKt1P7krgzEQ274jJD8KyR7L%2B5VpqkiPitv7hHSbtwWoYFgFONPZU7RDyR9S16MNhdcMhDNT0ZBU7OJ6ZG7p3ZswL66n5EcawsNDzLZ00pH6%2F6YtmyDphURmjVBCZaeYxa5BQjQGwvF%2B6diOn%2FBUF4%2BtFnXTwnCOnTPbrgfXEBQiWyJNotDSfJKxAU%3D&X-Amz-Signature=545ee6d5489b0383106807f2a819e80fa73c914380e629a551acb200d7b49e3f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject
9.12. Authorized Contract Signer*
Please provide the name, title and email address of the authorized contract signer.
10. Cost Proposal
Please generate pricing table based on your project requirements. By task, rates, or units.
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 REGULAR HOURLY LABOR RATE:
Water leak repairs both above ground and underground pipe leak repairs
1 Flat Hourly
Rate
2 AFTER HOURS HOURLY LABOR RATE:
Water leak repairs both above ground and underground pipe leak repairs
3 WEEKEND/HOLIDAY HOURLY LABOR
RATE: Water leak repairs…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .