NODC FY25 Air Handler 601.docx

DOCX document 36 KB Posted

Attached to
FY25 NODC Air Handler, Building 601 State and local contract opportunity
Solicitation number
SRC0000029535
Issued by
Lucas County, Ohio

About this file

I apologize, but the file you referenced (Name: NODC FY25 Air Handler 601.docx) has not actually been provided for me to review. Without the contents of the document, I cannot generate a summary. To properly summarize the document, I would need to see the full text of the file. Could you upload or paste the contents of the file so I can analyze it thoroughly?

View the file

Other files for this state and local contract opportunity

Other files attached to FY25 NODC Air Handler, Building 601, newest first.
File Type Posted
Contractor_Information_Form__rev._5.24_.pdf PDF
STANDARD AFFIRMATION AND DISCLOSURE FORM (EO 2019-12D 2022-02D).pdf PDF
NODC_FY25_Air_Handler_601__Round_2.pdf PDF
Contractor_Information_Form__rev._5.24_.pdf PDF
Electronic Disclosures and Signatures Consent.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northwest Ohio Developmental Center (NODC) – NAME OF PROJECT

Solicitation: SRC0000029535

Purpose: This solicitation is for removal of the existing air handler and installation of a new air handler in building 601.

RFQ Schedule:

· RFQ Issued: April 4, 2025

· Inquiry Period Begins: April 6, 2025

· Site Visit: April 10, 2025

· Inquiry Period Ends: April 16, 2025

· Quotes Due: April 18, 2025

Site Information:

Northwest Ohio Developmental Center (NODC) consists of 14 buildings on the main campus

Northwest Ohio Developmental Center 1101 S. Detroit Avenue Toledo, OH 43614

Primary Contact:

Craig Horvath, Maintenance Superintendent Email: craig.horvath@dodd.ohio.gov Phone: 419/902-0845

Site Visit:

A site visit is required to assess the exact scope of work, at which time potential bidders may review specific details of the current project area.

The site visit will be conducted at Northwest Ohio Developmental Center Site Visit Date: Thursday, April 10, 2025 Site Visit Time: 12:30pm - 2:30pm Potential Bidders for the site visit shall check in at the Administration Building upon arrival and ask for Craig Horvath.

Specifications:

Contractor must hold all applicable licenses and certifications required to perform duties that are needed to complete this project.

This request is for the removal and replacement of the air handler in building 601.

Requirements:

No work on the equipment covered herein shall be done by subcontractors unless prior approval is obtained from Northwest Ohio Developmental Center. Contractor must use trained and qualified personnel directly employed and supervised by him/her, preferably the same technician for each time of service.

The contractor shall maintain all necessary licenses, certifications, and registrations throughout the term of the awarded contract. Contractor shall perform all services with reasonable care, skill and diligence as would normally be provided by an experienced consultant and in accordance with industry standards.

Northwest Ohio Developmental Center is a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID), operated by the Ohio Department of Developmental Disabilities (DODD), serving individuals with developmental and other disabilities. All individuals to be providing services on the grounds of any DODD Developmental Center shall have not been found guilty of, or pleaded guilty to, any offense set forth in Section 5123.08(1), (2), or (3) of the Ohio Revised Code; nor employ any person to provide services under this RFP who has been found guilty of, or pleaded guilty to any offense set forth in Section 5123.081(1), (2), or (3) of the Ohio Revised Code. The person(s) providing services under this contract will be subject to a criminal background check prior to performing any services at any DODD Developmental Center.

Awarded Contractor shall certify that all its employees, while working at any DODD Developmental Center, will not purchase, transfer, use, be under the influence of, or possess illegal drugs or alcohol, or abuse prescription drugs in any way. Contractor shall comply with all applicable provisions of the Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA), both in the provision of specified services and in its employment practices.

Contractor shall not be subject to an “unresolved” finding for recovery under Section 9.24 of the Ohio Revised Code. If there is a finding for recover, the Contractor’s proposal will be rejected.

All contract work must be completed during the hours of 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made with the Developmental Center contact person. Contractor shall complete work for each specific job/task on consecutive days, this includes installation work.

The contractor must always keep the work area safe and must provide and use OSHA-approved barricades for any work that is exposed to the public. Contractor must always secure his tools and materials. Contractor must clean his work area of all refuse and scrap materials at the end of each workday.

The contractor must provide all parts, labor and fees associated with acquiring any necessary permits and associated engineering services as required to complete this project.

Inquiries:

From the issuance date of this solicitation, until a contract is awarded to an offeror, there may not be communications concerning the RFQ between any supplier who expects to submit a quote, and any employee of DODD involved in the issuing of the RFQ. The only exception is provided through the submission of written requests for clarification/interpretation via the RFQ through the OhioBuys website during the inquiry period.

Prospective offerors may make inquiries or seek clarifications regarding this RFQ any time during the inquiry period listed in the solicitation Calendar of Events. To make an inquiry, prospective offerors must use the Inquiry tab on the solicitation in OhioBuys to submit all inquiries or seek clarification.

Prospective offerors submitting inquiries will receive an immediate acknowledgement by e-mail that their inquiry has been received. The prospective offeror who submitted the inquiry will not receive an e-mail response to the question but will need to view the response on the OhioBuys website where it will be posted for viewing by all prospective offerors.

Attachments to an inquiry are not visible to DODD, so please include all questions in the inquiry description field.

DODD will try to respond to all properly posed inquiries within 48 hours, excluding weekends and state holidays. DODD will not respond to any inquiries received after the date and time indicated on the RFQ. Prospective offerors who attempt to seek information or clarifications verbally will be directed to reduce their questions to writing in accordance with the terms of this RFQ and state purchasing policy. No other form of communication is acceptable, and use of any other form of communication or any attempt to communicate with DODD staff or any other agency of the State to discuss this RFQ may result in the offeror being deemed ineligible.

Proposal Submittal: Bidders must complete the “Item Grid” and attach an electronic copy of their proposal within the solicitation in Ohio Buys. The cost proposal must include all parts, labor and fees associated with acquiring any necessary permits and associated engineering services as required to complete this project.

Time of Performance:

The initial awarded contract is estimated to become effective on April 18, 2025, and remain effective through June 30, 2025, or until terminated as provided in the contract.

Evaluation / Award: Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.

Attachments:

The following attachments must be completed and submitted as part of the supplier’s quote in OhioBuys in order to be considered for the award.

· Standard Affirmation and Disclosure Form The Standard Affirmation and Disclosure Form attached to the RFQ must be completed, signed by an authorized official of the offeror’s organization, and submitted with any proposal to be considered.

· Contractor Information Form The Contractor Information Form attached to the RFQ must be completed and submitted with any proposal to be considered.

Solicitation Process:

· A site visit is required to view the exact scope of work, at which time potential bidders may review the current condition of the requested project and develop their scope of work.

· Bidder is required to complete the solicitation Item Grid and attach an electronic copy of their quote in Ohio Buys, quotes must be valid for a minimum of 90 days.

· Bids will be evaluated, and the contract for services will be awarded to the lowest responsive and responsible bidder as determined by the agency.

Solicitation Summary:

This solicitation is for the removal and replacement of the air handler in building 601. The contractor is required to provide their own dumpster, if applicable. The air handler must communicate with the current HVAC software system, Metasys. This is a proprietary system, and the contactor is responsible for all communications and charges associated with contacting the owner of the proprietary software.