NIHAO201800006_RFP_with_Attach_6.7_FINAL.pdf
PDF 1 MB Posted
- Attached to
- Professional, Scientific and Technical Support Services Federal contract opportunity
- Solicitation number
- NIHAO201800006
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No_2_201800006.pdf | ||
| Amendment_No_1_201800006.pdf | ||
| Attachment_10_-_Labor_Rates,_Unit_Prices,_and_ODC's,_Cons_Req..xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
SOLICITATION
SECTION A - SOLICITATION/CONTRACT FORM
1. Requisition or other Purchase Authority: Public Law 81-692
2. Request for Proposal (RFP) No.:
NIAID-OD-NIHAO201800006
3. Issue Date:
June 7, 2018
4. Set Aside:
[X] No [ ] Yes See Part IV Section L
5. Title : NIAID Professional, Scientific and Technical Support Services
6. ISSUED BY:
Office of Acquisitions (OA) Division of Extramural Activities (DEA) National Institute of Allergy and Infectious Diseases (NIAID) National Institutes of Health (NIH) Department of Health and Human Services (DHHS) 5601 Fishers Lane, Room 3D10, MSC 9821 Bethesda, Maryland 20892-9821 If using overnight delivery, use 20817
7. SUBMIT OFFERS TO:
See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.
8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 3:00 PM local time on July 6, 2018. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.
9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, "PACKAGING AND DELIVERY OF THE PROPOSAL." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the address provided for the OFFICE OF ACQUISITIONS.
IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (c)(3) of FAR Clause 52.215-1, Instructions to Offerors--Competitive Acquisition," LOCATED IN SECTION L.1. OF THIS SOLICITATION.
10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov
11. FOR INFORMATION CALL: Patrick Wilson, Contract Specialist
PHONE: 240-669-5121
e-MAIL: wilsonpm@nih.gov
COLLECT CALLS WILL NOT BE ACCEPTED.
Secondary Point of Contact:
Callie Prassinos Office of Acquisitions, National Institute of Allergy and Infectious Diseases, NIH, DHHS Phone: 240-669-5155 E-mail: prassinosca@mail.nih.gov
COLLECT CALLS WILL NOT BE ACCEPTED
Offerors are strongly encouraged to submit questions regarding the solicitation by no later than 3:00 PM local time on June 18, 2018, so that adequate time is given to provide responses prior to the proposal due date.
http://www.sam.gov
RFP Number : NIAID-OD-NIHAO201800006
- 2 -
RFP TABLE OF CONTENTS
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
TECHNICAL PROPOSAL ATTACHMENTS
BUSINESS PROPOSAL ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
b. NAICS CODE AND SIZE STANDARD
c. TYPE OF CONTRACT AND NUMBER OF AWARDS
d. TASK ORDERS UNDER MULTIPLE AWARD INDEFINITE DELIVERY CONTRACTS
e. COMMITMENT OF PUBLIC FUNDS
f. COMMUNICATIONS PRIOR TO CONTRACT AWARD
g. RELEASE OF INFORMATION
h. PREPARATION COSTS
i. SERVICE OF PROTEST
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Proposal Summary and Data Record (NIH-2043)
4. Separation of Technical and Business Proposals
5. Alternate Proposals
6. Evaluation of Proposals
7. Potential Award Without Discussions
8. Use of the Metric System of Measurement
9. Privacy Act - Treatment of Proposal Information
10. Selection of Offerors
11. Past Performance Information
12. Electronic Information Technology Accessibility Notice, HHSAR 352.239-73 (December 2015)
- 3 -
13. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Discussions
2. Other Considerations
3. Technical Evaluation
c. BUSINESS PROPOSAL INSTRUCTIONS
1. Basic Cost/Price Information
2. Proposal Cover Sheet
3. Information Other than Cost or Pricing Data
4. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data
5. Salary Rate Limitation
6. Small Business Subcontracting Plan
7. Mentor Protege Program, HHSAR 352.219-70
8. HUBZone Small Business Concerns
9. Total Compensation Plan
10. Other Administrative Data
11. Qualifications of the Offeror
12. Subcontractors
13. Proposer's Annual Financial Report
14. Travel Costs/Travel Policy
SECTION M - EVALUATION FACTORS FOR AWARD
1. GENERAL
2. COST/PRICE EVALUATION
3. TECHNICAL EVALUATION FACTORS
4. PAST PERFORMANCE FACTOR
- 4 -
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
The purpose of the proposed contract is to provide scientific and professional expertise to support NIAID's current and emerging research priorities. Support includes specialized scientific expertise related to basic, translational and clinical research; vaccine research and development; general laboratory research at BSL-2, -3, and -4; veterinary and scientific research in ABSL-2, -3 and -4 environments; and bioinformatics and computational biology.
ARTICLE B.2. PRICES/COSTS
a. This is a Multiple Award Indefinite Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $10,000 (minimum) nor more than a total of $268,000,000 (maximum) for successful performance of this contract.
b. The prices set forth in this ARTICLE will cover the contract period September 1, 2018 through August 31, 2023.
c. The Government will compete and award Task Orders based on the work described in SECTION C of this contract and the following schedule. Upon delivery and acceptance of the item(s) described in each Task Order, the Government shall pay to the Contractor the unit price(s) set forth below:
SCHEDULE OF CHARGES
Labor Category Fixed Hourly Rate
Year 1
Fixed Hourly Rate
Year 2
Fixed Hourly Rate
Year 3
Fixed Hourly Rate
Year 4
Fixed Hourly Rate
Year 5
d. Ordering procedures are described in The METHOD OF ORDERING Article in SECTION G of this contract.
ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS
This Article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.
ARTICLE B.4. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award. The following Advance Understandings will be included in any resultant contract.
a. Non-Personal Services and Inherently Government Functions
1. Pursuant to FAR 37.1, no personal services shall be performed under this contract. All work requirements shall flow only from the Contracting Officer's Representative (COR) to the Contractor's Project Manager. No Contractor employee will be directly supervised by the Government. All individual employee assignments, and daily work direction, shall be given by the applicable employee supervisor. If the Contractor believes any Government action or communication has been given that would create a personal services relationship
- 5 -between the Government and any Contractor employee, the Contractor shall promptly notify the Contracting Officer of this communication or action.
2. Pursuant to FAR 7.5, the Contractor shall not perform any inherently Governmental actions under this contract.
No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative.
No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work. In all communications with other Government contractors in connection with this contract, the Contractor employee shall state that they have no authority to in any way change the contract and that if the other contractor believes this communication to be a direction to change their contract, they should notify the Contracting Officer for that contract and not carry out the direction until a clarification has been issued by the Contracting Officer.
3. The Contractor shall ensure that all of its employees working on this contract are informed of the substance of this article. Nothing in this article shall limit the Government's rights in any way under the other provisions of the contract, including those related to the Government's right to inspect and accept the services to be performed under this contract. The substance of this article shall be included in all subcontracts at any tier.
b. Confidential Treatment of Sensitive Information
The Contractor shall guarantee strict confidentiality of the information/data that it is provided by the Government during the performance of the contract. The Government has determined that the information/data that the Contractor will be provided during the performance of the contract is of a sensitive nature.
Disclosure of the information/data, in whole or in part, by the Contractor can only be made after the Contractor receives prior written approval from the Contracting Officer. Whenever the Contractor is uncertain with regard to the proper handling of information/data under the contract, the Contractor shall obtain a written determination from the Contracting Officer.
- 6 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated March 8, 2018, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
b. The applicable Privacy Act System of Records Number will be specified and shall be used in any design, development, or operation work to be performed under the resultant contract. Disposition of records shall be in accordance with SECTION C of the contract, and by direction of the Contracting Officer's Representative (COR).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein shall be submitted in electronic format through the NIAID electronic Report Deliverable Submission (eRDS) Site, available at the following website: https://erds.niaid.nih.gov/. All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at http:// www.hhs.gov/web/508/index.html under "Making Files Accessible."
All paper/hardcopy documents/reports submitted under this contract shall be printed or copied, double-sided, on at least 30 percent post consumer fiber paper, whenever practicable, in accordance with FAR 4.302(b).
a. Technical Progress Reports
1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award. [Note: Beginning May 25, 2008, the Contractor shall include the applicable PubMed Central or NIH Manuscript Submission reference number when citing publications that arise from its NIH funded research.]
For proposal preparation purposes only, it is estimated that one electronic version of the following report(s) will be required as follows:
[X] Monthly [ ] Quarterly [ ] Semi-Annually [X] Annually [ ] Annually (with a requirement for a Draft Annual Report) [ ] Final - Upon final completion of the contract [ ] Final - Upon final completion of the contract (with a requirement for a Draft Final Report)
b. Other Reports/Deliverables
HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION AND IT PROCUREMENTS
https://erds.niaid.nih.gov/ http://www.hhs.gov/web/508/index.html http://www.hhs.gov/web/508/index.html
- 7 -
INFORMATION AND/OR PHYSICAL SECURITY
A. Contingency Plan and Contingency Plan Test - due 60 days after contract award. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and NIH policies. Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, shall test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed.
Thereafter, the Contractor shall update and test the Contingency Plan at least annually.
B. POSITION SENSITIVITY DESIGNATIONS
All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:
[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).
[X] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).
[ ] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).
1. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12
Roster-
a. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.
The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:
https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.
b. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
c. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
d. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.
e. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.
f. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.
https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx
- 8 -
g. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).
h. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
i. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.
j. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.
C. CONTRACT INITIATION AND EXPIRATION
1. General Security Requirements- The Contractor (and/or any subcontractor) shall comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the contractor shall follow the HHS EPLC framework and methodology or and in accordance with the HHS Contract Closeout Guide (2012).
HHS EA requirements may be located here: https://www.hhs.gov/ocio/ea/documents/proplans.html
2. Sanitization of Government Files and Information- As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) shall provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800-88, Guidelines for Media Sanitization.
3. Notification- The Contractor (and/or any subcontractor) shall notify the CO and/or COR and system ISSO within fifteen days before an employee stops working under this contract.
4. Contractor Responsibilities Upon Physical Completion of the Contract- The contractor (and/or any subcontractors) shall return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor shall provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or NIH policies.
5. The Contractor (and/or any subcontractor) shall perform and document the actions identified in the NIH Contractor Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation shall be made available to the CO and/or COR upon request.
D. Contractor Non-Disclosure Agreement (NDA)- Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.
https://www.hhs.gov/ocio/ea/documents/proplans.html
- 9 -
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
- 10 -
SECTION E - INSPECTION AND ACCEPTANCE
a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
b. For the purpose of this SECTION, the Contracting Officer's Representative (COR) is the authorized representative of the Contracting Officer.
c. Inspection and acceptance will be performed at:
Workforce Management Branch Office of Workforce Effectiveness and Resources National Institute of Allergy and Infectious Diseases National Institutes of Health, Department of Health and Human Services Rockville, Maryland 20852
Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.
d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.
FAR Clause 52.246-4, Inspection of Services - Fixed Price (August 1996).
FAR Clause 52.246-5, Inspection of Services - Cost-Reimbursement (April 1984).
FAR Clause 52.246-6, Inspection Time-and Material and Labor Hour (May 2001).
Alternate I (April 1984) is not applicable to this contract.
- 11 -
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
The period of performance of this contract shall be from September 1, 2018 through August 31, 2023.
ARTICLE F.2. DELIVERIES
Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:
a. The items specified in this contract and each Task Order and as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract and each Task Order will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified in each Task Order.
b. The items shall be addressed and delivered to:
Addressee Deliverable Item No. Quantity Contracting Officer (CO)
OA, DEA, NIAID, NIH, DHHS
5601 Fishers Lane, Room 3D10, MSC 9821
Bethesda, Maryland 20892-9821
As specified in each Task Order
One (1) electronic copy.
Contracting Officer's Representative (COR)
Workforce Management Branch, Office of Workforce Effectiveness and Resources, NIAID, NIH, DHHS
Rockville, Maryland 20852
As specified in each Task Order
One (1) electronic copy.
ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is applicable to this contract.
52.247-35, F.o.b. Destination Within Consignees Premises (April 1984).
https://www.acquisition.gov/?q=browsefar
- 12 -
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
To be specified prior to award.
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.
(End of Clause)
The following individual(s) is/are considered to be essential to the work being performed hereunder:
Name Title
To be specified prior to award.
ARTICLE G.3. TASK ORDER PROCEDURE
This contract provides for the issuance of Task Orders on a negotiated basis as follows:
a. General Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE. No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
- 13 -
b. Requesting Task Order Proposals.
The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement. Generally, the TORFP will include but is not limited to the following:
1. Statement of Work;
2. Reporting Requirements and Deliverables;
3. Proposal Due Date and Location to Deliver Proposals;
4. Period of Performance of Task Order;
5. Anticipated type of Task Order;
6. Technical Proposal Instructions;
7. Business proposal Instructions
8. Evaluation Factors for Award
All contract clauses contained in this contract shall be incorporated in the TORFP and the resultant task order. If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.
Contractors are not required to propose on all TORFPs. Those eligible Contractors that decide not to submit a proposal shall advise the Contracting Officer, in writing, of their intention not to submit a proposal on or before the closing date and time established in the TORFP. An election not to propose on a given TORFP will not negatively affect or prohibit a Contractor from competing on future TORFPs. However, it may affect the Contractor's eligibility for continuations or extensions of the resultant Task Order.
c. Competitive Ordering Process.
1. All Contractors within a technical area will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of this contract unless otherwise specified in the proposed task order.
2. Contractors will be provided an adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part 16. Each TORFP will indicate the criteria for the evaluation of proposals. The responses shall demonstrate capability for each criterion to be evaluated. Generally, the Contractor will be asked to demonstrate the following as appropriate:
• Understanding of the requirements;
• Experience and capability on similar tasks;
• Technical approach, methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies.
• Procedures for assuring quality of work, products, and deliverables;
• Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);
• Staffing plan with skill levels and level of effort for each individual proposed. Generally, resumes will be required for proposed personnel (if not previously submitted);
• References to evaluate past performance; and
• Cost/Price to perform the task order.
- 14 -
d. Evaluation and Award of Task Order Proposals The Government will evaluate the Task Order proposals against the requirements of the TORFP. Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, technical factors will be significantly more important than cost or price.
However, each TORFP will specify how the award decision will be made.
Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor whose proposal is most advantageous to the Government.
The Contracting Officer will notify the Contractor(s) of the selection decision in writing.
e. Fair Opportunity
1. In accordance with FAR 16.505(b)(1)(i), each awardee will be given a fair opportunity to be considered for each order issued over $3,500 unless the following exception(s) apply:
i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.
iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
iv. It is necessary to place an order to satisfy a minimum guarantee.
2. All awardees will be given a fair opportunity to be considered in accordance with the FAR as follows:
i. For orders exceeding $3,500 up to the simplified acquisition threshold, in accordance with FAR 16.505(b)(1)(ii);
ii. For orders exceeding the simplified acquisition threshold up to $5.5 Million, in accordance with 16.505(b)(1)(iii); and,
iii. For orders exceeding $5.5 Million, in accordance with FAR 16.505(b)(1)(iv).
ARTICLE G.4. INVOICE SUBMISSION/CONTRACT FINANCING REQUEST AND CONTRACT
FINANCIAL REPORT
a. Invoice Submission/Contract Financing Request and Contract Financial Reporting, NIH(RC)-4 for NIH Cost- Reimbursement Type Contracts are attached and made part of this contract. The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
a. The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
- 15 -
b. One copy of the invoice shall be submitted to the following approving official:
Contracting Officer Office of Acquisitions National Institute of Allergy and Infectious Diseases National Institutes of Health, DHHS 5601 Fishers Lane, Room 3D10, MSC 9821 Bethesda, Maryland 20892-9821
E-mail: TBD at time of award
The Contractor shall submit an electronic copy of the payment request to the approving official instead of a paper copy. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
2. In addition to the requirements specified in FAR 32.905 for a proper invoice, the Contractor shall include the following information on the face page of all payment requests:
a. Name of the Office of Acquisitions. The Office of Acquisitions for this contract is National Institute of Allergy and Infectious Diseases.
b. Federal Taxpayer Identification Number (TIN). If the Contractor does not have a valid TIN, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
c. DUNS or DUNS+4 Number. The DUNS number must identify the Contractor's name and address exactly as stated in the contract and as registered in the Central Contractor Registration (CCR) database. If the Contractor does not have a valid DUNS number, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
d. Invoice Matching Option. This contract requires a two-way match.
e. Unique Invoice Number. Each payment request must be identified by a unique invoice number, which can only be used one time regardless of the number of contracts or orders held by an organization.
f. The Contract Title is: National Institute of Allergy and Infectious Diseases (NIAID) Professional, Scientific, and Technical Support Services.
g. Contract Line Items as follows:
Line Item # Line Item Description
- 16 -
b. Inquiries regarding payment of invoices shall be directed to the designated billing office, (301) 496-6452.
a. The Contractor shall include the following certification on every invoice for reimbursable costs incurred with Fiscal Year funds subject to HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of this contract.
For billing purposes, certified invoices are required for the billing period during which the applicable Fiscal Year funds were initially charged through the final billing period utilizing the applicable Fiscal Year funds:
"I hereby certify that the salaries charged in this invoice are in compliance with HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of the above referenced contract."
ARTICLE G.5. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS, FAR 52.232-40 (December 2013)
a. Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
b. The acceleration of payments under this clause does not provide any new rights under the prompt Payment Act.
c. Include the substance of this clause, include this paragraph c, in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of Clause)
ARTICLE G.6. INDIRECT COST RATES
In accordance with Federal Acquisition Regulation (FAR) (48 CFR Chapter 1) Clause 52.216-7 (d)(2), Allowable Cost and Payment incorporated by reference in this contract in PART II, SECTION I, the cognizant Contracting Officer representative responsible for negotiating provisional and/or final indirect cost rates is identified as follows:
Director, Division of Financial Advisory Services Office of Acquisition Management and Policy National Institutes of Health
6011 EXECUTIVE BLVD, ROOM 549C, MSC-7663
BETHESDA MD 20892-7663
These rates are hereby incorporated without further action of the Contracting Officer.
ARTICLE G.7. GOVERNMENT PROPERTY
If this RFP will result in the acquisition or use of Government Property provided by the contracting agency or if the Contracting Officer authorizes in the preaward negotiation process, the acquisition of property (other than real property), this ARTICLE will include applicable provisions and incorporate the HHS Publication, entitled, "HHS Contracting Guide for Contract of Government Property," which can be found at: http://oamp.od.nih.gov/sites/default/ files/appendix_q_hhs_contracting_guide.pdf.
ARTICLE G.8. ON-SITE CONTRACTOR ACCESS TO GOVERNMENT PROPERTY
The Contractor shall be held responsible for Government Property, regardless of dollar value, when:
• The contract requires contractor personnel to be located on a Government site or installation;
• The property utilized by contractor personnel is incidental to the place of performance; and,
• The property used by the contractor remains accountable to the Government http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf
- 17 -
Responsibility includes physical presence, proper use and handling, normal maintenance, and reporting loss, damage or destruction.
Responsibility for government property shared by two or more contractors or located in space shared by two or more contractors, shall be determined and documented by the contractors involved. In cases where the parties cannot reach agreement on shared responsibility, the matter will be referred to the NIH Property Officer for resolution.
ARTICLE G.9. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
a. Contractor Performance Evaluations
Interim and Final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The Final performance evaluation will be prepared at the time of completion of work. In addition to the Final evaluation, Interim evaluation(s) will be prepared annually to coincide with the anniversary date of the contract.
Interim and Final evaluations will be provided to the Contractor as soon as practicable after completion of the evaluation. The Contractor will be permitted thirty days to review the document and to submit additional information or a rebutting statement. If agreement cannot be reached between the parties, the matter will be referred to an individual one level above the Contracting Officer, whose decision will be final.
Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
b. Electronic Access to Contractor Performance Evaluations
Contractors may access evaluations through a secure Web site for review and comment at the following address:
http://www.cpars.gov http://www.cpars.gov
- 18 -
SECTION H - SPECIAL CONTRACT REQUIREMENTS
ARTICLE H.1. HUMAN SUBJECTS
It is hereby understood and agreed that research involving human subjects shall not be conducted under this contract, and that no material developed, modified, or delivered by or to the Government under this contract, or any subsequent modification of such material, will be used by the Contractor or made available by the Contractor for use by anyone other than the Government, for experimental or therapeutic use involving humans without the prior written approval of the Contracting Officer.
ARTICLE H.2. ACKNOWLEDGEMENT OF FEDERAL FUNDING
The Contractor shall clearly state, when issuing statements, press releases, requests for proposals, bid solicitations and other documents describing projects or programs funded in whole or in part with Federal money: (1) the percentage of the total costs of the program or project which will be financed with Federal money; (2) the dollar amount of Federal funds for the project or program; and (3) the percentage and dollar amount of the total costs of the project or program that will be financed by nongovernmental sources.
ARTICLE H.3. DISSEMINATION OF FALSE OR DELIBERATELY MISLEADING INFORMATION
The Contractor shall not use contract funds to disseminate information that is deliberately false or misleading.
ARTICLE H.4. PRIVACY ACT, HHSAR 352.224-70 (December 2015)
This contract requires the Contractor to perform one or more of the following: (a) Design; (b) develop; or (c) operate a Federal agency system of records to accomplish an agency function in accordance with the Privacy Act of 1974 (Act) (5 U.S.C. 552a(m)(1)) and applicable agency regulations.
The term "system of records" means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual. Violations of the Act by the Contractor and/or its employees may result in the imposition of criminal penalties (5 U.S.C. 552a(i)).
The Contractor shall ensure that each of its employees knows the prescribed rules of conduct in CFR 45 part 5b and that each employee is aware that he/she is subject to criminal penalties for violation of the Act to the same extent as Department of Health and Human Services employees. These provisions also apply to all subcontracts the Contractor awards under this contract which require the design, development or operation of the designated system(s) of records [5 U.S.C. 552a(m)(1)]. The contract work statement:
(a) identifies the system(s) of records and the design, development, or operation work the Contractor is to perform;
and
(b) specifies the disposition to be made of such records upon completion of contract performance.
ARTICLE H.5. RESTRICTION ON PORNOGRAPHY ON COMPUTER NETWORKS
The Contractor shall not use contract funds to maintain or establish a computer network unless such network blocks the viewing, downloading, and exchanging of pornography.
ARTICLE H.6. GUN CONTROL
The Contractor shall not use contract funds in whole or in part, to advocate or promote gun control.
- 19 -
ARTICLE H.7. SUBCONTRACTING PROVISIONS
a. Small Business Subcontracting Plan
1. The Small Business Subcontracting Plan, dated TBD is attached hereto and made a part of this contract.
2. The failure of any Contractor or subcontractor to comply in good faith with FAR Clause 52.219-8, entitled "Utilization of Small Business Concerns" incorporated in this contract and the attached Subcontracting Plan, will be a material breach of such contract or subcontract and subject to the remedies reserved to the Government under FAR Clause 52.219-16 entitled, "Liquidated Damages-Subcontracting Plan."
b. Subcontracting Reports
The Contractor shall submit the following Subcontracting reports electronically via the "electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov.
1. Individual Subcontract Reports (ISR)
Regardless of the effective date of this contract, the Report shall be due on the following dates for the entire life of this contract:
April 30th October 30th Expiration Date of Contract
2. Summary Subcontract Report (SSR)
Regardless of the effective date of this contract, the Summary Subcontract Report shall be submitted annually on the following date for the entire life of this contract:
October 30th
For both the Individual and Summary Subcontract Reports, the Contracting Officer shall be included as a contact for notification purposes at the following e-mail address:
Email Address to be provided at time of award Contracting Officer
ARTICLE H.8. HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION AND IT
PROCUREMENTS
ARTICLE H.8.1. INFORMATION SECURITY AND/OR PHYSICAL ACCESS SECURITY
A. BASELINE SECURITY REQUIREMENTS
1. Applicability- The requirements herein apply whether the entire contract or order (hereafter "contract"), or portion thereof, includes either or both of the following:
a. Access (Physical or Logical) to Government Information: A Contractor (and/or any subcontractor) employee will have or will be given the ability to have, routine physical (entry) or logical (electronic) access to government information.
b. Access a Federal System Containing Information: A Contractor (and/or any subcontractor)will operate a federal system and information technology containing data that supports the HHS mission. In addition to the Federal Acquisition Regulation (FAR) Subpart 2.1 definition of "information technology" (IT), the term as used in this section includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central http://www.esrs.gov/
- 20 -processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.
2. Safeguarding Information and Information Systems- In accordance with the Federal Information Processing Standards Publication (FIPS)199, Standards for Security Categorization of Federal Information and Information Systems, the Contractor (and/or any subcontractor) shall:
a. Protect government information and information systems in order to ensure:
• Confidentiality, which means preserving authorized restrictions on access and disclosure, based on the security terms found in this contract, including means for protecting personal privacy and proprietary information;
• Integrity, which means guarding against improper information…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.