NIFC_Access_Control_115-NWS_Prologue.pdf
PDF 140 KB Posted
- Attached to
- NIFC 115 FWS ACCESS CONTROL Federal contract opportunity
- Solicitation number
- 140L3722R0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Roster_0001.pdf | ||
| Sol_140L3722R0015_Amd_0001.pdf | ||
| NIFC_115_NWS_Access_Control_Questions_0001.pdf | ||
| SF1442_Example_Completion-Instructions.pdf | ||
| B03_WD_ID20220025_02-25-2022.pdf | ||
| NIFC_Access_Control_115-NWS_11X17_Plans.pdf | ||
| CertificationVaccination.pdf | ||
| NIFC_Access_Control_115-NWS_Bid_Schedule.pdf | ||
| NIFC_Access_Control_115-NWS_Specifications.pdf | ||
| Sol_140L3722R0015.pdf | ||
| NIFC_Access_Control_115-NWS__Notes_29Mar2022.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
April 15, 2022
PROLOGUE
NIFC ACCESS CONTROL PROJECTS 115-NWS
This project includes the expansion of the access control system at 115 National Weather Service (NWS).
Project includes architectural and electrical work for a complete and operational access control system.
General information about 115-NWS and the project is provided below. See the Solicitation Documents for specific information on the project.
1. Installation Requirements: The access control system shall be installed by an AMAG factory trained/certified technician and be a factory authorized integrator.
2. Construction Period: The construction period for this work is beginning of August 2022 to December 2022, period of performance is 120 days.
3. Building Occupancy: The building will be fully occupied during this construction project.
Building occupancy is 24 hrs/day 7 days/wk. Contractor shall coordinate any power disruptions with the COR prior to disruption. Contractor shall provide all safety barriers required for overhead work.
4. Existing Building Construction: 115-NWS is a block building with metal stud and gypsum board finished interior walls. It is single level office building with a partial basement. The original building construction occurred in 1993.
5. Security: NIFC is a secure site with a controlled security entrance.
a. Prior to commencing work, the contractor shall provide a list to the Contracting
Officer containing names for all contractor personnel who will work on NIFC.
b. All contractors’ personnel shall present an official US Government or State
Government issued photo identification at the security gate. ID’s will be compared to the contractor’s personnel list.
c. All the contractors’ personnel shall wear NIFC furnished visitor badges in a visible location at all times while on the campus and return the badge at the end of each day, or at the completion of the project. Badge turn in is at the discretion of the NIFC Security Manager.
d. Contractor personnel shall not enter the site more than 30 minutes prior to the start of the scheduled workday and must leave the campus within 30 minutes of the scheduled workday completion.
6. Work Hours: Construction work shall be conducted during regular office hours which are
7:00 am to 4:30 pm, Monday through Friday. Work during holidays, evenings, nights, and weekends may be allowed as approved by the Contracting Officer.
7. COVID-19: Contractor personnel shall comply with government COVID-19 restrictions.
Contractors shall always keep a signed attestation form on individuals that indicates their vaccination status. Those who are not fully vaccinated shall provide proof of a negative COVID-19 test result from the past 72 hours.
8. --end---