19-02302_Statement_of_Work_UV_Frequency_Doublers.pdf
PDF 114 KB Posted
- Attached to
- UV Frequency Doublers Federal contract opportunity
- Solicitation number
- NB688000-19-02302
About this file
Statement of Work (SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19-02302_UV_Frequency_Doubler_Specifications.docx | DOCX document | |
| Combined_Synopsis-Solicitation_Jan2019.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
Statement of Work: Acousto-optic Modulators 1 Last Saved: 7/24/2019 5:09 PM Double-click on for further assistance.
Use this Statement of Work document to purchase an item and/or item-related services.
TITLE: UV Frequency Doublers Requesting Lab/Division/Group: PML, Div. 688, Ion Storage Group Requisition Number: NB688000-19-02302
Statement of Need The Ion storage group requires two UV optical frequency doublers to support development of optical frequency standards, ultrastable lasers and precision measurements with trapped ions.
Items and/or item-related services Section Requirements Related Information Items/Service (required)
1. Qty 1 of 560 nm – 280 nm frequency doubler including all necessary electronics, cables and other accessories for coupling into the system and locking the cavity.
2. Qty 1 of 534 nm – 267 nm frequency doubler including all necessary electronics, cables and other accessories for coupling into the system and locking the cavity.
☒ See attached document UV_Frequency_Doubler_Specifications.docx for detailed specifications
Enter related information here
Delivery ☐ N/A
12 weeks ARO ☒ Phased delivery is acceptable ☐ Software on USB / disk required ☐ Software electronic delivery acceptable Email address for software delivery
Enter related information here
Installation ☐ N/A
Will be installed in a temperature controlled (dT<+/- 0.5 C) laboratory environment ☒ Site visit recommended
Inspection and Acceptance ☐ N/A
Inspection and acceptance is expected to take 7 days.
☐ Government acceptance expected to take longer than 7 days
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable If you require an Extended Manufacturer Warranty, describe the warranty requirements.
Period Length:Ex. month, 6 month, year etc.
☐ Option Period 1 ☐ Option Period 2
S
Statement of Work: Acousto-optic Modulators 2 Last Saved: 7/24/2019 5:09 PM Double-click on for further assistance.
☐ Option Period 3 ☐ Option Period 4 Training ☒ N/A
Training requirements Enter related information here
Maintenance
☒ N/A
Describe your maintenance requirements.
Period Length: Ex. month, 6 month, year etc.
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Repair ☒ N/A
Choose an item.
Describe your repair requirements.
Period Length: Ex. month, 6 month, year etc.
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A
List any government furnished material/equipment here
Enter related information here
Travel ☒ N/A
Describe any travel requirements Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.).
Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
| Use this Statement of Work document to purchase an item and/or item-related services. |
| Use this Statement of Work document to purchase an item and/or item-related services. |
| TITLE: UV Frequency Doublers |
| TITLE: UV Frequency Doublers |
| Requesting Lab/Division/Group: PML, Div. 688, Ion Storage Group |
| Requesting Lab/Division/Group: PML, Div. 688, Ion Storage Group |
| Requisition Number: NB688000-19-02302 |
| Requisition Number: NB688000-19-02302 |
| Statement of Need |
| Statement of Need |
| Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation. |
File details come from the government source that posted it.