View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Launcher Interface Computer (ALIC) Chassis and Associated Mechanical Assemblies., newest first.
File Type Posted
20R0123 Amendment 3.docx DOCX document
Drawings 20R0123.pdf PDF
20R0123 Solicitation Amendment.docx DOCX document
20R0123 Solicitation.docx DOCX document
20R0123 Attachments.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6893620R0123

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

ANSWERS TO SOLICIT. QUESTION

Q1. The SOW section 1.0 states NAWCWD “intends to procure the Aircraft Launcher Interface Computer (ALIC) Chassis and the associated mechanical assemblies,” and “Listed in Section 2.1 are the applicable drawings for the ALIC Chassis and the associated mechanical assemblies.” Is the intent to deliver just the chassis or the chassis and associated mechanical assemblies?

A1: Deliver the ALIC Chassis and the associated mechanical assemblies.

Q2. In the SOW section 2.1 drawings, states “ALIC Chassis and the associated Mechanical Subassemblies consist of the following drawings (available on CD); however, there are circuit card assemblies (non-mechanical assemblies) listed on the list. Are the CCA’s to be manufactured by the contractor and delivered as part of a kit?

A2: Circuit Card Assemblies (Blank PCB and electronic parts) will not be manufactured by the Contractor and will not be delivered to the Government as part of a kit. The Government will provide the CCAs (without the hardware: Vertical Stiffeners, Horizontal Stiffeners, Flat Springs, Ejectors, Wedge Lock Card Retainers) to the Contractor. The Contractor is responsible to manufacture the CCA hardware and mount them on the provided CCAs for the Government.

Q3. Does Texas Instruments possess the mold and fixturing to support the legacy casting, p/n 295905-1 rev M? Or is it the intention of the USG to have the contractor qualify another supplier?

A3: Texas Instruments does not provide the mold and fixtures to support this contract. The Contractor will be responsible to manufacture the ALICs and associated mechanical assemblies per drawing requirements. The Contractor is responsible to do their own mold that meets the drawing requirements.

Q4. Can the USG extend the response time by 30-days?

A4: No, the proposal submission date will remain the same.

(End of Summary of Changes) image1.wmf