CDRL's.pdf
PDF 133 KB Posted
- Attached to
- Sustainment Engineering Support (SES) Federal contract opportunity
- Solicitation number
- N6893615R0073
About this file
CDRL's
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted_J A.pdf | ||
| QASP.pdf | ||
| 15-R-0073_RFP_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C-130H FMS Engineering
Contract Support
N68936-15-R-0073 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Technical Report-Study/Services C-130H in-service sustainment analyses
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.1.1.4, 3.2.3
3.2.11
AFLCMC/WLNIG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASGEN ASGEN
b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A
SEE BLK 16 SEE BLK 16
Reg
Repro
16. Remarks
BLK 4: Contractor format is acceptable.
BLK 7: The Contractor shall invoice in Wide Area Work Flow
(WAWF) to collectively account for all data submitted by Letter of
Transmittal (LT) after the submission of final report.
BLK 9: Distribution Statement C: Distribution authorized to US
Government Agencies and their Contractors. Other request shall be referred to AFLCMC/WLNIG, Robins AFB, GA 31098-1640
Blocks 10, 12 & 13: Submit draft for Government review NLT 10 DA task is performed. Submit final NLT 10 after receipt of Government comments with comments incorporated.
BLK 14: Data shall be submitted to the AFLCMC/WLNIG e-mail addresses provided below. Deliver the data electronically in Microsoft
Office format. Alternate method is by electronic file or CD-ROM.
E-mail addresses:
David.Peth@us.a.fmil, Engineering
Monali.Patel.2@us.af.mil, Program manager
Address for alternate method of delivery:
AFMC AFLCMC/WLNIG
235 Bryon St., Suite 19A
Robins AFB, GA 31098-1640
See BLK 16 1 1 0
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Naval Air Warfare Center, Weapons Division, China Lake, CA
93555-6100
150803
DRRB Chairperson
DD Form 1423-1, 1 Jun 1990 mailto:David.Peth@us.a.fmil mailto:Monali.Patel.2@us.af.mil
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C-130H FMS Engineering
Contract Support
N68936-15-R-0073 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Technical Report-Study/Services Structural Life Analysis
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.2.7 AFLCMC/WLNIG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASGEN ASGEN
b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
A
Blocks 8 & 10, 12 & 13: Submit reports NLT 10 days after task is performed. The Government shall grant approval/disapproval within fifteen (15) business days after receipt of plan. If disapproved, the contractor shall correct and return the report within five (5) business days after receipt of comments.
235 Bryon St., Suite 19A
Naval Air Warfare Center, Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MFFP
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C-130H FMS Engineering
Contract Support
N68936-15-R-0073 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Corrosion Prevention and Control Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MFFP-81403 SOW Para. 3.2.11 (g) AFLCMC/WLNIG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT 1TIME SEE BLK 16
b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8 & 10-13: The Corrosion Prevention and Control Plan shall be submitted NLT eleven (11) months after receipt of order (ARO). The
Government shall grant approval/disapproval within fifteen (15) business days after receipt of plan. If disapproved, the contractor shall correct and return the report within five (5) business days after receipt of comments.
235 Bryon St., Suite 19A
Naval Air Warfare Center, Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C-130H FMS Engineering
Contract Support
N68936-15-R-0073 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Contractor's Progress and Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81928 SOW Para. 3.3 AFLCMC/WLNIG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MTHLY 30DAC
b. COPIES
8. APP CODE SEE BLOCK
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A
BLK 4: Contractor format is acceptable.
Use section 2 content requirements of DI-MISC-81943 to address
Section 2.5 (a.) of DI-MGMT-81928.
BLK 8 & 10-13: The contractor shall submit the Status Report within thirty (30) days after receipt of order (ARO) and no later than the 15th of each subsequent month.
235 Bryon St., Suite 19A
Robins AFB, GA 31098-1640
See BLK 16 0 1 0
NACWD Code
254200D
0 1 0
15. TOTAL 0 1 0
Naval Air Warfare Center, Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C-130H FMS Engineering
Contract Support
N68936-15-R-0073 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Technical Report-Study/Services Corrosion Prevention and Control Analyses
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 3.2.11 AFLCMC/WLNIG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASGEN ASGEN
b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blocks 8 & 10, 12 & 13: The final project technical report shall be submitted NLT eleven (11) months after receipt of order (ARO). The
Government shall grant approval/disapproval within fifteen (15) business days after receipt of plan. If disapproved, the contractor shall correct and return the report within five (5) business days after receipt of comments.
235 Bryon St., Suite 19A
Naval Air Warfare Center,