CDRLs_-_MEC.pdf
PDF 614 KB Posted
- Attached to
- Moveable Environmental Chambers Federal contract opportunity
- Solicitation number
- N68335-19-R-0029
About this file
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_-_MEC.pdf | ||
| Solicitation_N68335-19-R-0029.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0002 A
TDP
TM OTHER
X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A001 Operator Control Interface Command Set
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-DRPR-80651 SOW Para 3.2.12 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
A N/A N/A Reg Repro
16. REMARKS
PM 0 2 0
Block 4: Shall be provided in National Instruments LabVIEW™ compatible format as applicable. Electronic CD-ROM media submittal is acceptable.
Block 9: Distribution authorized to the Department of Defense and US DoD components only (administrative or operational use). Other requests shall be referred to AIR-4.4.6.
Block 14b: Two (2) CD-ROMs at EOC.
15. Total 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 1 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A002 Software Licensing
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-PSSS-82046 SOW Para 3.2.13 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 1 0
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable.
Block 9: Distribution authorized to the Department of Defense and US DoD components only (administrative or operational use). Other requests shall be referred to AIR-4.4.6.
Licenses to include:
Any necessary software licensing dictated by vendor design.
15. Total 0 1 0
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page of
Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TM
OTHER
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A003 Operation Instructions for Research and Development (R&D) Equipment Operation Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-MISC-81414 SOW Para 4.1 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 2 2
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable. Content to include equipment, operation, maintenance, and calibration.
Block 9: Distribution authorized to the Department of Defense and US DoD components only (administrative or operational use). Other requests shall be
Block 14b: Provide 2 CDs and 2 hardcopies.
15. Total 0 2 2
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A004 Maintenance Instructions for Research and Development (R&D) Equipment Maintenance Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-MISC-81414 SOW Para 4.2 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 2 2
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable. Content to include equipment, operation, maintenance, and calibration.
Block 9: Distribution authorized to the Department of Defense and US DoD components only (administrative or operational use). Other requests shall be
Block 14b: Provide 2 CDs and 2 hardcopies.
0 2 2
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A005 Proposed Spare Parts List Spare Parts List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-ILSS-80134 SOW Para 4.3 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 1 0
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable.
Block 9: Distribution authorized to the Department of Defense and US DoD
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A006 Illustrated Parts Breakdown
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-QCIC-80202 SOW Para 4.4 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 1 0
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable.
Block 9: Distribution authorized to the Department of Defense and US DoD
0 1 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A007 Engineering Drawings Mechanical and Electrical Engineering Drawings
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-DRPR-80651 SOW Para 4.5 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME See Block 16 b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
A N/A See Block 16 Reg Repro
16. REMARKS
PM 0 1 1
Block 4: Reference provided for guidance only; electronic media submittal required, and electronic mail submittal acceptable.
Mechanical drawings in the following file types:
Parts .sldprt
Assembly .sldasm
Drawing .slddrw Electrical drawings in contractor format acceptable.
referred to AIR-4.4.6.
Blocks 12 and 13:
Final as-built drawings at EOC
Block 14b:
1 CD and 1 hard copy of FINAL as-built of all drawings at EOC.
15. Total 0 1 1
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A008 Installation Control Drawings Installation Drawings
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-DRPR-81242 SOW Para 4.6 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 2 2
Block 4: Reference provided for guidance only; contractor format acceptable.
Block 14b: Provide two (2) CD-ROMs and two (2) hardcopies.
15. Total 0 2 2
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 8 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A009 Calibration Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-QCIC-80278B SOW Para 4.7 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 9 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A010 Warranty
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-SESS-81639 SOW Para 4.8 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
PM 0 1 0
Block 4: Reference provided for guidance only; contractor format acceptable and electronic mail submittal acceptable.
Block 9: Distribution authorized to the Department of Defense and US DoD
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
MECs
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
A011 System Specification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-IPSC-81431A SOW Para 4.9 AIR-4.4.6.2
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
No E
See Block 16
1TIME EOC b. COPIES
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 11 of 11 Pages
File details come from the government source that posted it.