Questions and Answers Round One - As of August 28, 2017

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Control Indicator and Control Monitor, newest first.
File Type Posted
N68335-17-R-0068_P00001.docx DOCX document
A003_-_Installation_Control_Drawings.pdf PDF
A017_-_Product_Drawings_and_Associated_Lists.pdf PDF
CI_CM_Solicitation_KO.docx DOCX document
A007_-_Test_Notification.pdf PDF
A004_-_Software_Transition_Plan.pdf PDF
N68335-17-R-0068.docx DOCX document
A002_-_Config_ID_Baseline.pdf PDF
A013_-_Presentation_Materials.pdf PDF
A018_-_Tech_Manual.pdf PDF
A019_-_Reliability_and_Maintainability_Analysis.pdf PDF
A011_-_Minutes.pdf PDF
A006_-_Test_Procedure.pdf PDF
A008_-_Test_Report.pdf PDF
A012_-_Conference_Agenda.pdf PDF
A014_-_Configuration_Audit_Summary_Report.pdf PDF
A010_-_Report,_Production_or_Delivery_Problem.pdf PDF
A001_-_List_of_Items_Delivered.pdf PDF
Pricing_Spreadsheet.xlsx XLSX spreadsheet
A005_-_Test_Plan.pdf PDF
A015_-_Request_for_Deviation.pdf PDF
A009_-_Status_Report.pdf PDF
A016_-_LMI_Data_Product_PPL.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – Round 1 (August 28, 2017)

QUESTION 1: Based on the "Description:" in the solicitation N68335-17-R-0068; the last sentence: "This is a build to print and specifications and Drawings will be provided with the solicitation." This would imply that the government would be supplying all necessary documentation for vendors to be able to manufacture to specifications, as build to print is defined by the government. However as part of the data package received the CICM hardware specification clearly refers to a new design in the introduction section of the specification. The government has not provided any detailed mechanical drawings, assembly instructions, bill of materials, schematics, Gerber files or artwork. XXXXXX requests that the government clarify whether or not this is a build to print contract. We offer both build to print contracting and redesign services however we cannot begin to prepare a proposal/bid until the government either corrects the solicitation or provides a complete technical package to XXXXXX. Upon resolution of this issue, XXXXXX will be requesting an extension based on what the government decides is the best course of action.

ANSWER: The statement, "This is a build to print and specifications and Drawings will be provided with the solicitation" is incorrect. This is strictly a new design. The figures provided are to aid in defining the requirements for the mounting hole patterns, the grounding strap, access door clearances, and external connector locations & clearances. Part of the design challenge is to design the CICM box such that it will meet both the legacy CI requirements as well as the legacy

CM requirements.

QUESTION 2: XXXXXX has not seen any Q&A posted on this solicitation. It has been our experience with solicitations of this type there would normally be many questions asked by potential contractors. Can the government please confirm that no other contractors/vendors have submitted any questions and/or requested additional information. If the government has received questions or requests for additional information we ask that the government post this information publicly as required by the FAR.

ANSWER: The Government has not received any questions or requests for additional information to date for this solicitation. Any questions and responses would be posted on the

FBO website under this solicitation number.