N68335-17-R-0068.docx
DOCX document 153 KB Posted
- Attached to
- Integrated Control Indicator and Control Monitor Federal contract opportunity
- Solicitation number
- N68335-17-R-0068
About this file
Request For Proposal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_Round_One_(August_28,_2017).pdf | ||
| N68335-17-R-0068_P00001.docx | DOCX document | |
| A003_-_Installation_Control_Drawings.pdf | ||
| A017_-_Product_Drawings_and_Associated_Lists.pdf | ||
| CI_CM_Solicitation_KO.docx | DOCX document | |
| A007_-_Test_Notification.pdf | ||
| A004_-_Software_Transition_Plan.pdf | ||
| A019_-_Reliability_and_Maintainability_Analysis.pdf | ||
| A011_-_Minutes.pdf | ||
| A006_-_Test_Procedure.pdf | ||
| A008_-_Test_Report.pdf | ||
| A012_-_Conference_Agenda.pdf | ||
| A014_-_Configuration_Audit_Summary_Report.pdf | ||
| A010_-_Report,_Production_or_Delivery_Problem.pdf | ||
| A001_-_List_of_Items_Delivered.pdf | ||
| Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| A005_-_Test_Plan.pdf | ||
| A015_-_Request_for_Deviation.pdf | ||
| A009_-_Status_Report.pdf | ||
| A016_-_LMI_Data_Product_PPL.pdf | ||
| A002_-_Config_ID_Baseline.pdf | ||
| A013_-_Presentation_Materials.pdf | ||
| A018_-_Tech_Manual.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N68335-17-R-0068
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Proposals under NAWCADLKE’s Request for Proposal (RFP) number N68335-17-R-0068 shall be submitted prior to XX July 2017 1:00pm EST Naval Air Warfare Center Aircraft Division Hwy 547 Bldg. 120 Room 180 Attn: Evanuel Hairston
JBMDL, NJ 08733
The Offeror shall provide its DD 2345 to Evanuel Hairston at evanuel.hairston@navy.mil to receive Attachments, 1, 3, and 4, Control Indicator Control Monitor (CICM) Hardware Processing Platform Requirements Specification Figure 1 and Figure 2. The Offeror shall provide its current mainlining address to receive Attachments 1,3, and 4.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Control Indicator/Control Monitor
FFP
Prototype NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PURCHASE REQUEST NUMBER: 1300579748
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| Control Indicator/Control Monitor |
FFP
Prototypes for Government Environmental Testing NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| Control Indicator/Control Monitor |
FFP
Prototypes for Contractor Environmental Testing NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Contracts Data Requirements List
FFP
Not Separately Priced
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
INTEGRATED CONTROL INDICATOR/CONTROL MONITOR (CI/CM)
SOLUTION
1.0 BACKGROUND: NAWCAD 4.11.2 provides support and expertise for the AN/UPX-29(V) Interrogator System of which the AN/UPX-24(V) Interrogator Set is a component. The AN/UPX-24(V) set includes the Control Indicator (CI) C-10064 and the Control Monitor (CM) C-10065 which provide remote access and control to the AN/UPX-24(V). The design of the current CI and CM components is not flexible and subsequently cannot be configured to support new Mode 5 and Mode S Identification Friend or Foe (IFF) capabilities.
1.1. SCOPE: NAWCAD 4.11.2 requires the integration of the two separate CI and CM components into a single box that is software configurable to operate as either the CI or CM. NAWCAD 4.11.2 requires the delivery of quantity one (1) integrated CI/CM prototypes and the Technical Data Package (TDP) of the integrated CI/CM with the option for the Contractor or the Government to perform Environmental Testing on an additional quantity two (2) integrated CI/CM prototypes. The determination of who does the Environmental Testing will be made approximately 30 days after contract award. The integrated CI/CM must be able to convert from the CI configuration (vertical) to the CM configuration (horizontal) without the addition or removal of parts.
2.0 APPLICABLE DOCUMENTS
2.1. Military Specifications and Standards
| DoD-STD-1399 | Interface Standard Interface Standard or Shipboard Systems |
| MIL-STD-461 | Electromagnetic Interference Characteristics Requirements for Equipment |
| MIL-STD-464 | Department of Defense Interface Standard: Electromagnetic Environmental Effects, Requirements for Systems |
| MIL-STD-882E | Standard Practice for System Safety |
| MIL-STD-1686C | Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment |
| MIL-D-23140D | Drawings, Installation Control, for Electronic Equipment |
| EIA-649-1 | Configuration Management Requirements for Defense Contractors |
| MIL-W-21965D | Water Cooling of Shipboard Electronic Equipment |
| MIL-S-901D | Shock Tests. H.I. (High-Impact) Shipboard Machinery, Equipment, and Systems, Requirement for |
| MIL-STD-167-1A | Mechanical Vibrations of Shipboard Equipment |
| MIL-STD-810G | Department of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests |
| MIL-STD-1399 | Interface Standard for Shipboard Systems (Section 300A) Electric Power, Alternating Current |
2.2. Handbooks and Guides
| MIL-HDBK-217F | Reliability Prediction of Electronic Equipment w/Notice 2 |
| MIL-HDBK-472 | Maintainability Prediction |
| MIL-HDBK-454B | General Guidelines for Electronic Equipment |
2.3. Performance Specification
CI/CM Hardware Processing Platform Specification
2.4. Non-Government documents
| ANSI/NCSL Z540.3-2006 | Calibration Laboratories and Measuring and Test Equipment |
| ASME Y14.5M-2009 | Dimensioning and Tolerancing |
| ISO 9001 | Model for Quality Assurance in Design, Development, Production, Installation and Servicing |
| ISO 10012-1 | Quality Assurance Requirements for Measuring Equipment |
| EIA-649 | National Consensus Standard for Configuration Management |
3.0 DESCRIPTION OF EFFORT. The work scope includes the delivery of hardware, software, technical data documentation, shipping expenses, and a warranty period after delivery and final acceptance.
3.1. Hardware Requirements
3.1.1. The contractor shall build quantity three (3) integrated CI/CM solution prototype units. The performance of the prototypes shall be functionally equivalent to performance of deliverable production units per the specifications provided and shall maintain an equivalent form factor to deliverable production units. The prototypes must include all changes incorporated for both environmental qualification testing and Factory Acceptance Testing (FAT).
3.1.1.1 A Functional Configuration Audit of the prototypes shall be conducted to validate that the development of the configuration items has been completed satisfactorily and that the configuration items have achieved the performance and functional characteristics specified in the functional or allocated configuration identification.
3.1.1.2 A Physical Configuration Audit of the prototypes shall be conducted to verify that the configuration items “as-built” configuration conforms to the technical documentation that defines the configuration items.
3.1.2. The contractor shall develop the integrated CI/CM solution in accordance with the CI/CM Hardware Processing Platform Specification.
3.1.3. Prototype Delivery
3.1.3.1 Contractor shall deliver quantity one (1) prototype no later than 6 months after contract award
3.1.3.2 Contractor shall deliver quantity two (2) prototypes used for Environmental Testing no later than 12 months after contract award should the Contractor perform Option: Environmental Testing.
3.1.3.3 Contractor shall deliver quantity (2) prototypes no later than 6 months after contract award should the Government perform Option: Environmental Testing.
3.2. Software Requirements
3.2.1. The contractor shall license and provide installable/usable media to the government consisting of the required number of license(s) and media to support Government development, installation, and operation of Government Furnished Information, (GFI) to be supported by the contracted hardware units, (e.g. if a software component is licensed as Per-Unit fees, the contractor shall supply a sufficient quantity of licenses for the contracted hardware, whereas a software component under a one-time perpetual license shall only require one license for all contracted hardware). For development software, the Government requires sufficient licenses for (2) development workstations.
3.2.2. The contractor shall provide a Summary Delivery Report, detailing a list of all hardware and software and documentation items delivered under the contract. (CDRL A001)
3.3. Technical Data Package Requirements
3.3.1. Configuration Identification: Baseline/As-Built Configuration Data List. The contractor shall maintain and deliver a Configuration Identification Baseline Report. The Configuration Identification Baseline shall consist of an Engineering Family Tree prepared in the form of a top-down breakdown of all hardware, software and firmware items with their associated technical documentation. The Configuration Identification Baseline Report shall be prepared using EIA-649 or the contractor’s configuration management process as guidance. (CDRL A002)
3.3.2. The contractor shall deliver a Technical Data Package (TDP) to support the integration CI/CM solution that includes, but is not limited to:
3.3.2.1 Installation Control Drawings, (ICD) shall consist of outline and installation drawings detailing all physical characteristics of the major equipment components including interface and installation control drawings. The report shall identify the source of physical dimension, power and cooling requirement data (i.e., calculated or measured) and the variance of physical characteristics from requirements as specified in the performance specifications. The report shall also include cable block diagrams. It shall also include cable running sheets (including connector, mating connector, recommended backshell information). The installation documentation provided in this report shall meet the data requirements specified in MIL-D-23140D. However, contractor format is acceptable. This documentation may be submitted in the form of an Installation Control Document or equivalent. Drawing symbology, dimensioning, and tolerancing provided in this documentation shall be in accordance with ASME Y14.5M-2009 or a matrix cross referencing the deliverable drawing symbology, dimensions and tolerances to this specification can be provided. (CDRL A003)
3.3.2.2. The following is a list of requirements for all Installation Control Documents and Contractor Furnished Information necessary for development of products for Ship Design and Installation. The ICD shall follow the format below and contain the following information:
General Documentation
| G1. |
| Drawing title, number and revision match drawing list |
| G2. |
| Unit description and nomenclature identified on drawing |
| G3. |
| Drawing reproducible |
| G4. |
| Drawing legible |
| G5. |
| Drawing signed off by dwg approval authority |
| G6. |
| Drawing received in original electronic format (PDFs acceptable) |
Physical Size
| PH1. |
| Equipment size completely (height, width, depth, ) |
| PH2. |
| Dimensional tolerance specified |
| PH3. |
| All moving part clearances and installation or maintenance access areas defined and labeled |
| PH4. |
| If equipment shock mounted, are excursion clearances defined |
| PH5. |
| Sway brace mounting points defined |
| PH6. |
| Cable clearance defined |
| PH7. |
| Weight stated, if liquid cooled, wet weight shall be stated |
| PH8. |
| Center of gravity dimensionally located |
| PH9. |
| Mounting bolt pattern or templates, etc., identified and dimensioned |
| PH10. |
| Mounting hole size defined |
| PH11. |
| Mounting hardware defined (fastener/washer quantity, size and type) |
| PH12. |
| Non-standard mounting hardware torque values defined (dry or lubricated) |
| PH13. |
| Mounting restrictions (such as orientation or location) based on shock qualification are stated. If restrictions do not exist, then “unrestricted mounting” must be stated. |
| PH14. |
| Coolant connections dimensionally located |
| PH15. |
| Cooling air exhaust and intake defined and dimensionally located and clearance required for air inlet/exhaust stated |
| PH16. |
| Dry/air/gas connection defined (marked with "inlet" or "purge point") and dimensionally located |
| PH17. |
| Cable connections dimensionally located |
| PH18. |
| Waveguide connections defined (flange type and marked with "port #" or "RF output") and dimensionally located |
| PH19. |
| Dimensionally locate and size unit ground studs if required |
| PH20. |
| Lifting aids dimensionally located. Eyebolt inner diameter/outer diameter defined |
Foundation
| F1. |
| Mounting surface requirements defined (flatness, orientation, etc.) |
| F2. |
| Resilient mounting indicated |
| F3. |
| Interfacing materials defined (for galvanic corrosion avoidance) |
| F4. |
| Mounting plate thickness |
| F5. |
| Critical alignment requirements |
| F6. |
| Bonding and grounding requirements clearly stated |
| F7. |
| Are special installation notes required (bonding, grounding, spacers, etc.) |
Topside
| T1. |
| Center of wind resistance located |
| T2. |
| System characteristics i.e., rotating or non-rotating antenna, forcing frequencies, feedback control system characteristics, etc. |
| T3. |
| All available rotating antenna/radome vibration test data |
| T4. |
| Antenna/Radome Finite Element Model, or the following: Antenna/Radome basic geometry, Weight and center-of-gravity, Rotary moments-of-inertia, Material properties, System stiffness matrix |
| T5. |
| Are service platforms for access and maintenance defined if required |
| T6. |
| Maximum allowable loads stated, environmental requirements defined |
| T7. |
| Topside installation notes stated |
Power
| PW1. |
| Power requirements (type, operating voltage, peak current including fully drained UPS if applicable, nominal current, frequency, phase and source) defined |
| PW2. |
| Power factor (leading or lagging) for steady state operation |
| PW3. |
| Grounding requirements (single point, wire gauge) |
| PW4. |
| External motor power and load factor stated if applicable |
| PW5. |
| Make and type of electric motor (AC induction, AC synchronous, DC shunt, DC series, etc.) |
| PW6. |
| Electrical connection diagram |
| PW7. |
| External motor efficiency (%) stated if applicable |
Heat Dissipation
| H1. |
| Cooling requirements stated (CFM, GPM, inlet temp, quality, flow pressure, max pressure drop) |
| H2. |
| Coolant connections located, identified (type, flow direction) |
| H3. |
| Flow rate cooling requirements per MIL-W-21965D |
| H4. |
| Water cooled equipment requirements: flow, inlet temperature, flow pressure, and maximum pressure drop |
| H5. |
| Heat dissipation to coolant and to room stated for steady state condition |
Electrical Interfaces
| EL1. |
| Cable connections identified (marking, jack #) |
| EL2. |
| Cable connections defined (part number identified) |
| EL3. |
| Connector pinning information |
| EL4. |
| Interface type (i.e RS-232, NTDS, etc.) and function name |
| EL5. |
| If redundant interfaces, indicate Norm and Alt |
| EL6. |
| Waveguide connections identified |
| EL7. |
| Sufficient cable clearance identified |
| EL8. |
| For non-standard interfaces, cable length constraints or max allowable loss value is given |
Environmental
| EN1. |
| Shock grade and class per MIL-S-901 |
| EN2. |
| Vibration requirements per MIL-STD-167 |
| EN3. |
| Operating and non-operating temperature ranges |
| EN4. |
| Relative Humidity MIL-STD-810G |
| EN5. |
| Power tolerances per MIL-STD-1399 |
Other
| O1. |
| Special Human factors access requirements defined (sight gage, handles, switches, etc.) |
| O2. |
| Special installation tools or special test equipment identified if required |
| O3. |
| Special stowage requirements listed if required, i.e. SWE headsets, SWE test cables, SWE hoses, etc. |
| O4. |
| Control, Monitoring & Instrumentation Requirements |
| O5. |
| Can unit be mounted in exposed weather, if so, installation guidance provided |
| O6. |
| EMI Characteristics |
| O7. |
| Dry air/gas requirements defined (pressure, quantity, quality, etc. for normal operation and initial operation/post maintenance) |
| O8. |
| Special waterproofing requirements stated |
| O9. |
| Other non-standard installation practices stated if required |
| O10. |
| Other |
3.3.3. The contractor shall deliver a Computer-Resources Integrated Support Document, (CRISD) that includes, but is not limited to (CDRL A004):
3.3.3.1 List of required software necessary for the Government to develop software and provide life-cycle maintenance of GFI software.
3.3.3.2 Source of each of the technical data or computer software included under SOW 3.2.
3.3.3.3 Whether an item is commercial or non-commercial as per DFARS Subparts 227.7100 et seq and 227.7200 et seq, and for all commercial items attach a copy of the license the Government will be offered.
3.3.3.4 Data rights to be extended to the Government.
3.3.3.5 Software licensing description for all components identified, both Commercial and Non-Commercial.
3.3.3.6 What ownership rights the contractor has to each component.
3.4. Test Documentation.
3.4.1. Environmental Test Documentation
3.4.1.1 The contractor shall prepare an environmental test plan (CDRL A005) and an environmental test procedure. (CDRL A006)
3.4.1.2 The contractor shall provide any environmental test data (analytical data or actual test data) they have for the proposed item as well as listing tests offered to be conducted as part of the proposal to be conducted by the contractor to meet the environmental requirements of the CI/CM Hardware Processing Platform Specification.
3.4.1.3 Qualification shall be by one of three methods; the first is analysis, the second is by similarity and the third is by test. The table below indicates the method of qualification that is acceptable for each requirement.
| Requirement |
| Analysis |
| Similarity |
| Test |
| Yaw, Roll & Pitch - DoD-STD-1399 Section 301A |
| X |
X
Below Decks Ambient Temperature – MIL-STD-810G
X
Vibration – MIL-STD-167-1A
X
Shock – MIL-S-901D
X
| Altitude – MIL-STD-810G |
| X |
| X |
| X |
RF EME MIL-STD-464 Revision A Paragraph 5.3 Tables 1A and 1B
X
EMI of MIL-STD-461E (CE102, CS101, CS114, CS116, RE101, RE102, RS101, RS103)
X
| Shipboard Direct Current Magnetic Field Environment – DoD-STD-1399 Section 070 |
| X |
X
| Salt Atmosphere - MIL-STD-810G |
| X |
| X |
| X |
Below Decks Humidity – MIL-STD-810G
| X |
| X |
| Drip Test – MIL-STD-810G |
| X |
| X |
| X |
| Fungus - MIL-STD-810G |
| X |
| X |
| X |
Lightning Strike - MIL-STD-464
X
| Exposure to Static Electricity and Electrostatic Discharge – MIL-STD-882E |
| X |
X
3.4.1.4 The contractor shall identify any environmental tests required to be performed by the government as well as how changes required to meet deficiencies identified during government conducted test of the environmental requirements will be identified.
3.4.1.5 The contractor shall notify the Government of the planned test event. (CDRL A007)
3.4.1.6 The contractor shall complete all identified, funded, and completed tests, analysis, or similarity qualification tests, utilizing quantity two (2) CI/CM prototypes.
3.4.1.7 The contractor shall deliver an Environmental Qualification Report, detailing the summary of all environmental requirements and test results of the CI/CM Hardware Update to the original specifications. (CDRL A008)
3.4.2. The contractor shall prepare a Factory Acceptance Test (FAT) Procedure. (CDRL A006)
3.4.2.1 The contractor shall, after completion of manufacturing and successful performance of the FAT, deliver a FAT Report for each unit (CDRL A008)
3.5. Program Management
3.5.1. The contractor shall submit a monthly Technical Status Report. (CDRL A009)
3.5.2. Problem Identification Report. The contractor shall notify NAWCAD when learning of any major event which (CDRL A010):
3.5.2.1 Could affect program planning or production schedules.
3.5.2.2 Degrades the safety of the item/system such that personnel injury or property damage may be involved.
3.5.2.3 Identifies a potential hazard requiring corrective action.
3.5.2.4 Requires assistance to resolve problems/potential problems due to communications bottlenecks or shortages of material which have the potential of contributing to program delays and adversely affect progress of the contractor's program.
3.5.3. The contractor shall participate in status meeting telecons weekly and ad hoc. The contractor shall submit meeting minutes within 5 business days of telecon completion. (CDRL A011)
3.6. Quality Assurance
3.6.1. The contractor shall maintain a certified Quality System for the duration of the contract. The Quality System shall be applied to all areas of the project.
3.6.2. Measurement and Calibration Systems. The contractor shall use a measurement and calibration system for the duration of the contract, and it shall conform with the requirements of ISO 10012-1 Quality Assurance Requirements for Measuring Equipment – Part 1: Metrological confirmation system for measuring equipment, ANSI/NCSL Z540.3-2006 or equivalent: Calibration – Calibration Laboratories and Measuring and Test Equipment, or equivalent Government Quality Assurance publications revision in effect on date of contract award.
3.6.3. Electro Static Discharge Sensitive Parts. The contractor shall use a system that conforms to the requirements of MIL-STD-1686C or equivalent to ensure that static susceptible units, assemblies and components are adequately protected from Electrostatic Discharge (ESD) damage during the manufacturing, test, inspection, packaging and shipping cycles. Packages shall be marked with an ESD cautionary note and/or symbol as required.
3.7. Configuration Management.
3.7.1. Configuration Management is to be performed using EIA-649-1 and or ANSI/EIA-649, National Consensus Standard for Configuration Management, or existing contractor configuration management processes.
3.7.2. Hardware/Software/Firmware Configuration Management. The contractor shall maintain and implement a configuration management system. The configuration management system shall have as a minimum:
3.7.2.1 Configuration Identification – Identification and documentation of the functional and physical characteristics of configuration items.
3.7.2.2 Configuration Change Control – Control of changes to those configuration items and their related documentation.
3.8. Review and Audits
3.8.1. Formal Technical Reviews. The contractor shall plan and conduct the following formal reviews using the NAVAIR Systems Engineering Technical Review (SETR) process as guidance.
· System Requirements Review
· Preliminary Design Review
· Critical Design Review
· Test Readiness Review
3.8.2. The contractor, with government authorization, may combine reviews where the design maturity permits. Virtual Meeting Reviews, (e.g. WEBEX™), with government authorization, may be utilized. An agenda for a review must be provided at least ten (10) business days prior to the review (CDRL A012). Minutes and actions (CDRL A011) from a review shall be provided five (5) business days after the review. Final copies of presentations and/or other technical documentation for government acceptance from the review shall be provided (10)-days after the review (CDRL A013).
3.8.3. Configuration audit reports shall be prepared, as required, by the contractor and submitted to NAWCAD for approval. (CDRL A014) NOTE: For guidance on both the Functional and Physical Configuration Audits use EIA-649.
3.9. Deviations and Waivers. The contractor shall use the standard DD Form 1694 in compliance with EIA-649 when submitting deviations and waivers or contractor Configuration Management Process defined Deviation or Waiver procedures and forms. (CDRL A015)
3.10. Life Cycle Documentation
3.10.1. Contractor shall provide all Life-Cycle Support documentation including Provisioning Technical Documentation and Reliability, Maintainability, and Availability Reports.
3.10.2. Provisioning Technical Documentation (PTD). The contractor shall provide PTD for all supplied equipment. All PTD deliveries shall be in electronic format.
3.10.2.1 Provisioning Parts List (PPL). The PPL portrays the top down breakdown of the physical composition of each Free Standing Unit (FSU) or configuration item. This list contains all items subject to wear or failure and other items required for maintenance throughout the expected life cycle of the end item. All PPL deliveries shall be in electronic format and in a media compatible with the Interactive Computer Aided Provisioning System (ICAPS), as specified in the NAVSEA Provisioning, Allowance, Fitting Out Support (PAFOS) Manual, Chapter 4, Appendix K (MS EXCEL is acceptable) available at https://navsea.dod.afpims.mil/Home/Warfare-Centers/NUWC-Keyport/NSLC/PAFOS/. ICAPS was developed by the government for the purpose of developing and transmitting provisioning related data. If PPLs have previously been delivered and accepted, the FSU reference number has not changed and less than 10% of the existing document has changed, the contractor can submit a Certificate of Identicality in lieu of a PPL. (CDRL A016)
3.10.2.2 Engineering Drawings. The contractor shall provide engineering drawings that show a complete parts breakdown of the end item and/or piece part items that have replaceable or repairable components to the Line Replaceable Unit (LRU) level. The drawings should also include the quantity, supplier part number, original manufacturer CAGE code and the original manufacturer's part number. Supplied drawings shall be in Standard English. The legibility and contrast of these drawings shall be such that every line, number, letter, and character is clearly readable and capable of being used to reproduce legible prints. Drawings and associated lists shall be submitted in AutoCAD™ 2000 or equivalent contractor format. Proprietary Drawings shall be marked per FAR 52.227-14. Engineering drawings are an essential element relative to the Provisioning and PTD deliverable requirements. (CDRL A017)
3.10.2.3 Technical Maintenance Documentation. The contractor shall provide Commercial Technical Manuals, Equipment and General purpose and Supplemental Data in sufficient depth to support operation and maintenance of equipment by the intended operator/user without the services of a manufacturer’s representative. The contractor shall identify the complete set of technical manuals, handbooks, fault isolation/repair procedures (at the organizational level), system/console operator guides, preventive/planned maintenance procedures and supporting reference documentation to be provided in support of the contract. (CDRL A018)
3.10.3. Reliability, Maintainability, and Availability (RM&A). The contractor shall submit a R&MA prediction report for all equipment (including hardware, firmware and software). For equipment that is already designed, any accepted industry Reliability and Maintainability (R&M) Report is acceptable. MIL-HDBK-217F, Telcordia, PRISM, or experience data will be accepted for existing hardware equipment predictions. If another method is used, a detailed explanation providing the prediction methodology shall be provided (CDRL A019).
3.10.3.1 Reliability: The Reliability section of the R&M Report shall include, but not be limited to, reliability modeling parameters, calculated Mean Time Between Failure (MTBF), calculated Mean Time Between Mission Critical Failures (MTBMCF).
3.10.3.2 Maintainability: The Maintainability section of the R&M Report shall include, but not be limited to, the calculated Mean Time To Repair (MTTR) tables, with maintainability predictions at the organizational level, including Fault Detection/Fault Isolation (FD/FI), access, interchange, egress, adjustment, retest/check out times, and any time required to download firmware. Scheduled maintenance, such as cleaning filters and making adjustments, as well as the number of persons required to perform a specific task, shall be identified. MIL-HDBK-472 may be used as a guide.
3.10.3.3 Availability: The Availability section shall detail proposed sparing option and Mean-Logistics-Delay time for each sparing option.
3.10.3.4 Obsolescence Reporting. The contractor shall provide their methodology used to proactively monitor, assess impacts, and resolve obsolescence issues.
3.10.4. The contractor shall provide timely notice of obsolescence status and any risks/impacts to the system within 10 days of awareness the LRU level for hardware and loss of support for any software component for the duration of the contract. Any obsolescence status change impacting the delivery schedule or requiring re-submission of a CDRL or software delivery under 3.2 shall be reported as a Problem Report.(A010)
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
| 5252.223-9502 | HAZARDOUS MATERIAL (NAVAIR) (APR 2009) |
| (a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD-129 and Title 49 Code of Federal Regulations (CFR), Part 100-199 as applicable. In the event of any contradictions between the documents, 49 CFR shall govern or the applicable modal transport regulation. | |
| (b) In the event of a conflict between specific requirements in the contract or order and existing applicable modal transport regulations, the regulations shall take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures that are not in accordance with laws and regulations applicable to the mode of transportation employed. | |
| (c) To ascertain which Department of Defense, or local installation regulations, concerning hazardous materials may have impact on this contract, the contractor should contact: Environmental Director To be determined at time of award. . |
| 5252.247-9508 | PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998) |
| The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use. |
| 5252.247-9509 | PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998) |
| (a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract. | |
| (b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows: |
Best commercial practices
M/F: To be determined per individual Delivery Order
| (c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth. |
| (d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor. |
| 5252.247-9514 | TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999) |
| Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M. |
| 5252.247-9520 | PRESERVATION, PACKAGING, AND PACKING (NAVAIR)(OCT 2005) |
| (a) The contractor shall preserve, pack and package items procured for system stock, overseas destinations or ships at sea, in accordance with the MIL-STD-2073-1 Level A requirements delineated in the schedule or elsewhere in the contract or order. If specific requirements are not included in the contract or order, the contractor shall preserve and package in accordance with previously approved level A requirements, within the technical parameters contained in MIL-STD-2073-1. Preservation and packing materials shall be fire retardant/non-combustible as prescribed in the specific packaging requirements in the contract or order, and to the maximum extent practicable. | |
| (b) If the packaging materials specified in the contract or order are not fire retardant, and fire retardant varieties are included in commodity specifications for these materials, the contractor shall use fire retardant varieties. Fire retardant packaging materials are not required for items not used aboard ship. The use of plastic packaging materials is prohibited unless prescribed in specific packaging requirements in the contract or order, or unless required to adequately protect the item from damage. | |
| (c) For items procured for installation/immediate use, the contractor shall preserve and package in accordance with the Level C requirements of MIL-STD-2073-1. Packing for shipment (i.e., shipping container) shall be in accordance with MIL-STD-2073-1, Level A, for overseas surface shipments that are not containerized and all deliveries to ships at sea; Level B for all remaining overseas shipments; Level C or domestic shipments of items consumed at first destination. Fire retardant materials are not required in packing (i.e., shipping container) operations. All units, intermediate and shipping containers, shall be marked in accordance with MIL-STD-129. The use of shredded paper, excelsior, polystyrene and other loose-fill materials as a cushion is prohibited in all packaging and packing operation. | |
| (d) In accordance with 29 CFR, the contractor shall ensure that the following caution label is placed on all units, intermediate and shipping containers for all items containing asbestos in a form that can be inhaled: |
CAUTION
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
BREATHING ASBESTOS DUST MAY CAUSE SERIOUS BODILY HARM
(e) All items containing asbestos in a form that can be inhaled shall be packaged in sealed, impermeable bags or other impermeable containers, as required by 29 CFR.
NOTE TO SUPPLIERS: If the supplies to be furnished on this document require the asbestos caution label described above, the contractor shall notify the contract administrator indicated in the schedule prior to shipment.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| N/A |
| N/A |
| N/A |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 5252.246-9512 | INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005) |
| (a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by |
Code: N00421
NAWCAD
17598 Webster Field Road Bldg 8115 St. Inigoes, MD 20684-0010 M/F: Mike Fisher, 4.11.2.1
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
| 5252.246-9514 | INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) |
| Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled CDRLs A001 – A019 attached form will not be used for high cost data such as drawings, specifications, and technical manuals. |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| 6 mths. ADC |
| 1 |
| NAWCAD |
MIKE FISHER
17598 WEBSTER FIELD ROAD, BLDG 8115
ST. INIGOES MD 20684-0010
(301) 995-6662
N00421
| 0002 |
| 6 mths. ADC |
| 2 |
| (SAME AS PREVIOUS LOCATION) |
N00421
| 0003 |
| 12 mths. ADC |
| 2 |
| (SAME AS PREVIOUS LOCATION) |
N00421
| 0004 |
| N/A |
| N/A |
| N/A |
| N/A |
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 5252.227-9509 | SUMMARY RELIABILITY ASSURANCE/BURN-IN TESTS REPORTS (NAVAIR) (OCT 2005) |
| (a) If reliability assurance/burn-in tests are required for supplies procured hereunder, the contractor shall maintain and submit summary reliability assurance/burn-in test reports in accordance with DI-R-7040. | |
| (b) The contractor shall provide and maintain procedures to enable his full participation in the failure experience data interchange of the Government Industry Data Exchange Program (GIDEP), in accordance with the latest revision of MIL-STD-1556. Compliance with this clause shall not relieve the contractor from complying with any other provision of the contract. The contractor shall maintain status of GIDEP failure experience reports and shall provide GIDEP Annual Progress Report in accordance with DI-QCIC-80121, paragraph 10.2. | |
| (c) The contractor shall prepare GIDEP ALERTS in accordance with DI-QCIC-80126, paragraph 10.1, for material discrepancies which have adversely impacted or have the potential to adversely impact spare/repair parts reliability. | |
| (d) Appropriate action, as deemed necessary by the contractor, shall be taken in response to GIDEP ALERTS received which may impact materials procured hereunder. | |
| (e) The contractor agrees to insert paragraphs (b), (c) and (d) of this clause in any subcontract hereunder exceeding $500,000. When so inserted, the word "contractor" shall be changed to "subcontractor." |
| 5252.247-9505 | TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) | |
| Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit CDRLs A001 – A019, attached hereto, and the following: | ||
| (a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423. | ||
| (1) PCO, Code To be completed at time of award. | ||
| (2) ACO, Code To be completed at time of award. | ||
| (b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO. | ||
| (c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6. | ||
| (d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above. | ||
| (e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government. | ||
| (f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection. | ||
| (g) DD Form 1423, Block 14 Mailing Addresses: To be completed at time of award. |
Section G - Contract Administration Data
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-0001 |
| Line Item Specific: Single Funding |
| SEP 2009 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic (Aug 2016) |
| AUG 2016 |
| 252.225-7021 |
| Trade Agreements--Basic |
| SEP 2016 |
| 252.225-7035 |
| Buy American--Free Trade Agreement--Balance Of Payments Program Certificate--Basic (Nov 2014) |
| NOV 2014 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7006 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013) | |
| (a) Definitions, as used in this clause-- | ||
| "Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization. | ||
| "Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). | ||
| "Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system. | ||
| (b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. | ||
| (c) WAWF access. To access WAWF, the Contractor shall-- | ||
| (1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and | ||
| (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site. | ||
| (d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/. | ||
| (e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol. | ||
| (f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order: | ||
| (1) Document type. The Contractor shall use the following document type(s). |
Combo
| (Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an "Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.) | |
| (2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer. | |
| Destination/Destination | |
| (Contracting Officer: Insert inspection and acceptance locations or "Not applicable.") | |
| (3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system. |
| Routing Data Table* | ||||
| Field Name in WAWF | Data to be entered in WAWF | |||
| Pay Official DoDAAC: | TBD | |||
| Issue By DoDAAC: | N68335 | |||
| Admin DoDAAC: | TBD | |||
| Inspect By DoDAAC: | TBD | |||
| Ship To Code: | TBD | |||
| Ship From Code: | TBD | |||
| Mark For Code: | TBD | |||
| Service Approver (DoDAAC): | _________________________ | |||
| Service Acceptor (DoDAAC): | _________________________ | |||
| Accept at Other DoDAAC: | _________________________ | |||
| LPO DoDAAC: | _________________________ | |||
| DCAA Auditor DoDAAC: | _________________________ | |||
| Other DoDAAC(s): | _________________________ | |||
| (*Contracting Officer: Insert applicable DoDAAC information or "See schedule" if multiple ship to/acceptance locations apply, or "Not applicable.") | ||||
| (4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request. | ||||
| (5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system. |
michael.fisher4@navy.mil
(Contracting Officer: Insert applicable email addresses or "Not applicable.")
| (g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. For Navy WAWF questions call DFAS Customer Care 1-800-756-4571 option 6 | |
| (2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988. |
| 5252.201-9500 | TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012) |
| (a) The Technical Point of Contact (TPOC) for this contract is: |
TBD
| (b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO). |
| (c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires. |
| (d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract. |
| 5252.204-9503 | EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007) |
| (a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law. | |
| (b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered. |
| 5252.242-9511 | CONTRACT ADMINISTRATION DATA (NAVAIR)(SEP 2012) | |
| (a) Contract Administration Office. | ||
| (1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order. | ||
| (b) Special Instructions (see FAR 42.202(b) and (c)): | ||
| (1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)): | ||
| Functions Retained | ||
| Retained for Performance By: |
| N/A |
| N/A |
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
| Additional Functions |
| Retained for Performance By: |
| N/A |
| N/A |
(c) Inquiries regarding payment should be referred to: MyInvoice at https://myinvoice.csd.disa.mil//index.html.
Section H - Special Contract Requirements
| 5252.211- 9510 | CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011) | |
| (a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall: | ||
| (1) Not by word or deed give the impression or appearance of being a Government employee; | ||
| (2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order; | ||
| (3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work; | ||
| (4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and | ||
| (5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative. | ||
| (b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer. | ||
| (c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees. |
| 5252.216-9512 | PAPERLESS CONTRACTING (NAVAIR)(JUN 2009) |
| (a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern. | |
| (b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods. |
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .