RFI 0002
On Drawing A-4, Existing/New Flooring Plan, there is an almost square room with no floor called out.
Additionally, there is not a transition specified here. Please clarify.
1. This is the Mech Room. No new flooring in that area. A Schluter straight edge trim could be used to transition from existing flooring to new.