CDRLs_N66604-19-R-0784.pdf
PDF 163 KB Posted
- Attached to
- ENGINEERING SERVICES FOR THE VIRGINIA CLASS WEAPONS HANDLING EQUIPMENT Federal contract opportunity
- Solicitation number
- N66604-19-R-0784
About this file
Contract Data Requirements List with Addendum
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660419R0784_DD254_final.pdf | ||
| N66604-19-R-0784_Amendment_0003.pdf | ||
| N66604-19-R-0784_Amendment_0002.pdf | ||
| N66604-19-R-0784_Amendment_0001.pdf | ||
| N66604-19-R-0784_Solicitation.pdf | ||
| DD_Form_254_Draft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP TM OTHER X Blk 16
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CIP-3 - Handling Services 1300757704 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Interface Specification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81632 SOW Para 4.1.2 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A (See Block 16) N/A N/A Reg Repr
16. REMARKS
Block C Category: (Other) SESS
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Governement estimates that one report will be required during the PoP.
Block 14: Reg copy to be submitted via electronic submission.
Code 40 0 1 0
Code 40 COR 0 1 0
15. TOTAL 0 2 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Technical Report - Study/Services Tech Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para 4.1.3 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Block C Category: (Other) MISC
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Government estimates that one report for proposed fixtures and integration parts will be required during the PoP.
Block 14: Reg copy to be submitted via electronic submission.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Maureen E. Sharpe 12/13/2018
DD Form 1423-2, AUG 96 (EG) PREVIOUS EDITION MAY BE USED Page of Pages
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CIP-3 - Handling Services 1300757704 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Technical Data Package Design Drawings and Models
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80776 SOW Para 4.2.1, 4.2.2 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
A (See Block 16) N/A ASREQ Reg Repr
Block C Category: (Other) SESS
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Contractor shall provide TDPs as required during the PoP. The Government will review and comment within 15 days. The Contractor shall submit final calculation packages within 15 days after recipt of Government comments.
Block 14: Reg copy to be submitted via electronic submission.
Code 40 1 1 0
Code 40 COR 1 1 0
15. TOTAL 2 2 0
A004 Design Data and Calculations Calculation Package
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-GDRQ-80650 SOW Para 4.2.2 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED N/A N/A b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Block C Category: (Other) GDRQ
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Contractor shall provide calculation packages as required during the PoP. The Government will review and comment within 15 days. The Contractor shall submit final calculation packages within 15 days after recipt of Government comments.
Block 14: Reg copy to be submitted via electronic submission.
Code 40 1 1 0
Code 40 COR 1 1 0
15. TOTAL 2 2 0
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CIP-3 - Handling Services 1300757704 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Cost Data Summary Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FNCL-81565C SOW Para 4.3.1 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Block C Category: (Other) FNCL
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Governement estimates that one report will be required during the PoP.
Block 14: Reg copy to be submitted via electronic submission.
A006 Contract Status Report Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81991 SOW Para 5.0 NUWCDIVNPT Code 40 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ ASREQ b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Block C Category: (Other) MGMT
Block 9: See Distribution Statement Addendum
Blocks 10 & 12: The Contractor shall submit status reports as required during the PoP.
Block 14: Reg copy to be submitted via electronic submission.
DD FORM 1423
BLOCK 16 DISTRIBUTION STATEMENT ADDENDUM
Block 9: the following information is amplification of the Block 9 Distribution Statement Selected:
Distribution Statement paragraph is in addition to CLASSIFICATION markings of the data.
Distribution Statement D: Applies to CDRL item Nos. A001-A006. Distribution authorized to the DoD and U.S. DoD contractors only; CRITICAL TECHNOLOGY (date data generated). Other requests for this document shall be referred to NUWC Division, Newport (Code 40).
The following “EXPORT CONTROL WARNING NOTICE” must be used in conjunction with DISTRIBUTION STATEMENT identified in the above CDRL items.
Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 27521 et seq.) or the Export Administration Act of 1979, as amended, title 50, U.S.C., App 2401 et seq. Violation of these exports laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Refer to the security classification guide applicable to the order.
Block 9: the following information is amplification of the Block 9 Distribution Statement Selected:
| 2019-04-29T09:54:26-0400 | |
| SCHWILLINSKI.BURKHARD.K.1249345985 |
| Text2: | |
| 2019-04-29T09:54:56-0400 | |
| SCHWILLINSKI.BURKHARD.K.1249345985 |
| Text4: | |
| 2019-04-29T09:55:30-0400 | |
| SCHWILLINSKI.BURKHARD.K.1249345985 |
Text6:
File details come from the government source that posted it.