19-023A01_Replace_UPS_System.pdf
PDF 456 KB Posted
- Attached to
- Install UPS NUWCDIVNPT Federal contract opportunity
- Solicitation number
- N66604-19-Q-2891
About this file
Drawing (3 sheets)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604-19-Q-2891-0002.pdf | ||
| Amendment_0001_N6660419Q2891.pdf | ||
| FY19_Base_Access_Request_(1).pdf | ||
| N66604-19-Q-2891.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK REQ. NO.
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
N E
W P
O R
T, R
H O
D E
IS
LA
N D
FA
C
IL
IT
IE
S
B R
A N
C H
N A
V A
L U
N D
E R
S E
A W
A R
FA
R
E C
E N
TE
R
D
IV
IS
IO
N
SHEET OF
CONTRACT NO.
NAVFAC DRAWING NO.
NUWC DRAWING NO.
SCALE:
SIZE: ANSI D
A P
P R
O V
E D
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
D A
TE
S A
TI
S
FA
C
TO
R
Y T
O D
A
TE
D A
TE
D A
TE
D A
TE
SEAL
R E
V
IS
IO
N
S S
Y M
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
AS NOTED
W2019-145-01
19-023A
R E
P
LA
C E
M E
N T
O F
U .P
.S . S
Y S
TE
M
B U
IL
D
IN
G
A N
D T
E L.
H U
TS
TI
TL
E S
H E
E T
R . N
E
LS
O N
5/
/1
R . N
E
LS
O N
5/
/1
1 3
T-1
UPS REPLACEMENT
BUILDING 111 AND TEL. HUTS
NAVAL UNDERSEA WARFARE CENTER
NEWPORT, RI FACILITIES BRANCH
GENERAL NOTES
1. ALL WORK INCLUDED IN THIS CONTRACT SHALL CONFORM TO ALL STATE, NATIONAL AND OTHER CODES AND
ORDINANCES WHICH APPLY TO THIS PROJECT.
2. THE CONTRACTOR SHALL IDENTIFY AND FIELD VERIFY POINTS OF CONNECTION WHERE EXISTING AND NEW CONSTRUCTION MEET AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL PROCEED WITH THE WORK ONLY AFTER THE DISCREPANCIES HAVE BEEN RESOLVED BY THE GOVERNMENT.
3. ALL COMPONENTS AND WORK ARE NEW AND SHALL BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE
NOTED.
4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS.
5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL
COST TO THE GOVERNMENT.
6. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE LEFT IN A NEAT AND CLEAN MANNER.
TOOLS SHALL NOT BE LEFT IN ANY MEANS OF EGRESS PATHS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS WHICH ARE REQUIRED FOR THE
SATISFACTORY COMPLETION OF THE WORK.
8. SUBMIT TO THE GOVERNMENT FOR APPROVAL ALL SAFETY DATA SHEETS (SDS's) FOR ALL HAZARDOUS MATERIALS TO BE USED ON THE PROJECT PRIOR TO BRINGING ON SITE. IN ADDITION, SUBMIT FOR GOVERNMENT APPROVAL, ALL
OF THE PROPOSED MATERIALS TO BE USED ON THIS PROJECT.
9. UNLESS NOTED OTHERWISE HEREIN, THE CONTRACTOR SHALL DISPOSE OF AND/OR RECYCLE ANY CONSTRUCTION DEBRIS FROM THE PROJECT SITE AS REQUIRED BY THE STATE OF RHODE ISLAND. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY DISPOSAL PERMITS WHICH ARE REQUIRED. CONSTRUCTION DEBRIS FROM THE
PROJECT SITE SHALL BE DISPOSED OF IN A STATE APPROVED MANNER.
10. ALL ELECTRICAL WORK SHALL BE ACCOMPLISHED ON EQUIPMENT WHICH IS DE-ENERGIZED. THE CONTRACTOR SHALL NOT WORK ON ANY "LIVE" CIRCUITS. ALL OUTAGES SHALL OCCUR AFTER NORMAL WORKING HOURS OR ON
WEEKENDS.
N
FRESHWATER POND
CREEK
BREAKWATER
STONE
http://www.snopes.com/politics/taxes/realestate.asphttp://www.snopes.com/politics/taxes/realestate.asphttp://www.snopes.com/politics/taxes/realestate.asp http://www.snopes.com/politics/taxes/realestate.asp http://www.snopes.com/politics/taxes/realestate.asp
75A
GATE 26
116 117149
TANK
PNTS180
185 1192
438 179
ENCLO
SURES
CHEM
IC
AL S
TO
RAGE
102T
113 101
ATF
A1261
GATE 28
GATE 29
GATE 25
PROPANE
TANKS
CUNNINGHAM
B U
S H
N E
LL
DEFENSE HIGHWAY
C U
N N
IN
G
H
AM
LAY STR
EET
STREET
PORTER STREET
HUNT STREET
LEAVITT STREET
ERICSO
N
CUNNIN
GHAM
PORTER STREET
STR
EET
LAY STREET
STREET
FULTON
STREET
ST
R
EE
T
STREET
DEFENSE HIGHWAY
FL
E
E T
A C
C E
S S
R O
A
BUSHNELL STREET
BUSHNELL STREET
B O
O M
S
TR
E
E T
NORTH HOWELL STREET
HEADQUARTER STREET
FULTON
STREET
STREET
RAILROAD R
IGHT O
F W
AY
W A
N U
M E
T O
N O
M Y
G O L
F
C O
U N
T R
Y C
L U
B
C H
ILLER
C H
ILLER
CUNNINGHAM S
TREET
GATE 32
GATE 23
HUNT STREET
FULTON
STREET
FULTO
N
CUNNINGHAM STREET
HOWELL
STREET
NUWC SITE MAP
SCALE: 1" = 250'-0"
WORK AREA
11'-7"
20'-10"
11'-7"
20'-10"
11'-7"
20'-10"
WORK REQ. NO.
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
N E
W P
O R
T, R
H O
D E
IS
LA
N D
FA
C
IL
IT
IE
S
B R
A N
C H
N A
V A
L U
N D
E R
S E
A W
A R
FA
R
E C
E N
TE
R
D
IV
IS
IO
N
SHEET OF
CONTRACT NO.
NAVFAC DRAWING NO.
NUWC DRAWING NO.
SCALE:
SIZE: ANSI D
A P
P R
O V
E D
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
D A
TE
S A
TI
S
FA
C
TO
R
Y T
O D
A
TE
D A
TE
D A
TE
D A
TE
SEAL
R E
V
IS
IO
N
S S
Y M
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
AS NOTED
W2019-145-01
19-023A
R E
P
LA
C E
M E
N T
O F
U .P
.S . S
Y S
TE
M
B U
IL
D
IN
G
A N
D T
E L.
H U
TS
FL
O
O R
P
LA
N S
R . N
E
LS
O N
5/
/1
R . N
E
LS
O N
5/
/1
2 3
A-1
BUILDING 111
SCALE: 1/8" = 1'-0"
N
EXISTING UPS AND BATTERY SYSTEM TO BE
REPLACED (SEE ENLARGED PLAN ON SHEET A-2)
TEL. HUT BLDG 1341
SCALE: 3/16" = 1'-0"
TEL. HUT BLDG 1349
SCALE: 3/16" = 1'-0"
TEL. HUT BLDG 1350
SCALE: 3/16" = 1'-0"
SCOPE OF WORK:
BUILDING 111: SEE SHEET A-2 FOR BUILDING 111 REQUIREMENTS.
TELEPHONE HUTS: EACH OF THE THREE HUTS WILL REQUIRE THE FOLLOWING WORK:
A. PROVIDE TWO EACH 5kVA SMART UPS (RACK MOUNTING) WITH INTEGRAL 208V TO
120V STEP DOWN TRANSFORMER WITH THE FOLLOWING FEATURES:
TOPOLOGY: DOUBLE CONVERSION ONLINE
INPUT VOLTAGE OF 208 VOLTS SINGLE PHASE
INPUT FREQUENCY BETWEEN 40 TO 70 HZ
MINIMUM OF .85 POWER FACTOR
MINIMUM 97% EFFICIENT (ENERGY STAR COMPLIANT)
GRAPHICAL LCD DISPLAY
INTELLIGENT BATTERY MANAGEMENT SYSTEM
MEASURES ENERGY USAGE
ABILITY TO IMMEDIATELY PROTECT EQPT WHEN POWER RETURNS EVEN AFTER A
COMPLETE DISCHARGE OF THE BATTERY
LESS THAN 2% OUTPUT VOLTAGE DISTORTION
PROVIDE COMPLETE WITH DOCUMENTATION CD, RACK MOUNTING BRACKETS,
RACK MOUNTING HARDWARE, RACK MOUNTING SUPPORT RAILS, USB CABLE, USER MANUAL,
WARRANTY CARD, WEB/SNMP MANAGEMENT CARD
B. PROVIDE THE ASSOCIATED SERVER/TOWER RACK TO HOUSE THE TWO UPS UNITS
ABOVE
C. PROVIDE MANUFACTURERS 6 YEAR WARRANTY ON PARTS AND ON THE BATTERIES.
THE DESIGN IS BASED ON THE FOLLOWING MANUFACTURER AND PART NUMBERS. IT IS THE
INTENTION TO UTILIZE THESE SPECIFIC MANUFACTURER(S) AND PART NUMBERS IN THE NEW
CONSTRUCTION.
ITEM A: AMERICAN POWER CONVERSION (APC) PRODUCT SRT5KRMXLT-5KTF
ITEM B: APC PRODUCT AR3100
ITEM C: APC PRODUCT WBEXTWAR3YR-SP-05
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP 3
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP 4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(RAISED FLOOR
AutoCAD SHX Text
SYSTEM)
AutoCAD SHX Text
(RAISED FLOOR
AutoCAD SHX Text
SYSTEM)
AutoCAD SHX Text
(RAISED FLOOR
AutoCAD SHX Text
SYSTEM)
AutoCAD SHX Text
AutoCAD SHX Text
MENS
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
AutoCAD SHX Text 108A
AutoCAD SHX Text
RAMP 5
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
AutoCAD SHX Text
WORK REQ. NO.
E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
N E
W P
O R
T, R
H O
D E
IS
LA
N D
FA
C
IL
IT
IE
S
B R
A N
C H
N A
V A
L U
N D
E R
S E
A W
A R
FA
R
E C
E N
TE
R
D
IV
IS
IO
N
SHEET OF
CONTRACT NO.
NAVFAC DRAWING NO.
NUWC DRAWING NO.
SCALE:
SIZE: ANSI D
A P
P R
O V
E D
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
D A
TE
S A
TI
S
FA
C
TO
R
Y T
O D
A
TE
D A
TE
D A
TE
D A
TE
SEAL
R E
V
IS
IO
N
S S
Y M
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
AS NOTED
W2019-145-01
19-023A
R E
P
LA
C E
M E
N T
O F
U .P
.S . S
Y S
TE
M
B U
IL
D
IN
G
A N
D T
E L.
H U
TS
E N
LA
R
G E
D P
LA
N
O F
B
LD
G
R . N
E
LS
O N
5/
/1
R . N
E
LS
O N
5/
/1
3 3
A-2
SCOPE OF WORK
THE INTENT OF THIS PROJECT IS TO REMOVE AND REPLACE THE EXISTING 80 KW UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM
INCLUDING THE ASSOCIATED BATTERIES, BATTERY CABINET, AND MAINTENANCE/BYPASS SWITCH. THE WORK INCLUDES THE
FOLLOWING:
1. REMOVE THE EXISTING UPS SYSTEM INCLUDING ITS 3 PHASE, 480 VOLT, 125 AMP POWER SOURCE BACK TO PANELBOARD DP2. THE EXISTING FEED CONSISTS OF 3 # 2'S AND 1 # 8 GND IN 1-1/2" EMT BETWEEN DP2 AND THE MAINTENANCE - BYPASS SWITCH.
2. REMOVE THE EXISTING 125 AMP, 3 POLE BREAKER FROM SPACES 13-15-17 WITHIN PANELBOARD DP2 WHICH PROVIDES POWER TO
THE U.P.S.
3. REMOVE THE UPS BATTERY CABINET. PLACE BATTERIES ONTO A PALLET OUTSIDE OF THE BUILDING FOR PICKUP AND DISPOSAL BY
THE GOVERNMENT.
4. REMOVE THE MAINTENANCE/BYPASS SWITCH INCLUDING THE FEED BACK TO DP2, AS WELL AS, THE MISCELLANEOUS SHORT LENGTHS OF CONDUIT AND WIRING BETWEEN THE U.P.S. AND THE SWITCH FOR POWER AND COMMUNICATIONS.
5. INSTALL A NEW COMPLETE 80 KW UNINTERRUPTIBLE POWER SUPPLY SYSTEM, INCLUDING LITHIUM ION BATTERIES AND RACK, MAINTENANCE/BYPASS SWITCH AND ALL INTERCONNECTING COMMUNICATIONS AND POWER CIRCUITS REQUIRED BETWEEN THE MISCELLANEOUS COMPONENTS FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM. SYSTEM SHALL PROVIDE FOR 23 MINUTES OF
RUN TIME WITH 100 PERCENT LOAD AFTER POWER IS LOST.
6. PROVIDE A NEW 3 POLE, 480 VOLT, 175 AMP CIRCUIT BREAKER FOR SPACE 13-15-17 WITHIN PANELBOARD DP2 TO FEED THE NEW U.P.S. SYSTEM. RUN 3 # 2 0 AND 1 # 6 GND IN 2" EMT FROM THIS NEW BREAKER TO THE NEW U.P.S. SYSTEM VIA THE MAINTENANCE -
BYPASS SWITCH
7. THE LOAD SERVED BY THE UPS SYSTEM IS THE EXISTING 112.5 KVA TRANSFORMER. CONTRACTOR SHALL MODIFY CONDUIT AND WIRING AS NECESSARY TO CONNECT THIS EXISTING LOAD INTO THE NEW MAINTENANCE/BYPASS CABINET. THE EXISTING FEED TO
THE TRANSFORMER CONSISTS OF 3#1
0 AND 1#6 GROUND IN 2 INCH ELECTRICAL METALLIC TUBING.
8. AS INDICATED IN NOTE 5 ABOVE, REMOVE THE EXISTING AND PROVIDE ALL NEW INTERCONNECTING WIRING AND CONDUIT BETWEEN
THE MAINTENANCE BYPASS SWITCH AND THE BATTERY AND/OR UPS SYSTEM FOR POWER, COMMUNICATIONS, ...ETC. ALTHOUGH NOT SHOWN ON THE PLAN, CONTRACTOR SHALL PROVIDE A HINGED COVER ENCLOSURE, COMPLETE WITH TERMINAL STRIPS AND FUSES, (SIZED BY MFR), TO SERVE THE CONTROL POWER CIRCUITS BETWEEN THE UPS AND BATTERY RACKS AS DICTATED BY THE
MANUFACTURER. PROVIDE ALL REQUIRED INPUT AND OUTPUT CONDUIT AND WIRING.
9. PROVIDE ALL REQUIRED CLEARANCES TO EXISTING WALLS AND CEILINGS AS RECOMMENDED BY THE MANUFACTURER AND/OR
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
10. PROVIDE A TOTAL OF 5 YEARS OF ONSITE PARTS AND LABOR (EXCLUDING BATTERIES). THIS SHALL BE INCLUDED WITHIN THE
OVERALL BID. PRICING SHALL BE BASED ON PREVAILING WAGES.
11. THE INTENT IS TO PERFORM AS MUCH WORK AS POSSIBLE WITH RESPECT TO THE NEW CONDUIT FEED TO THE UPS SYSTEM PRIOR
TO TAKING THE EXISTING OUT OF SERVICE TO LIMIT THE AMOUNT OF DOWN TIME.
THE DESIGN IS BASED ON THE FOLLOWING MANUFACTURER AND PART NUMBERS. IT IS THE INTENTION TO UTILIZE THESE SPECIFIC
MANUFACTURER(S) AND PART NUMBERS IN THE NEW CONSTRUCTION.
UPS: PART NO. GVSUPS80KGS - GALAXY VS UPS 80KW 480V
MAINTENANCE/BYPASS CABINET - PART NO. GVSBPSU80G - GALAXY VS MAINTENANCE/BYPASS CABINET BATTERY RACK - PART NO. LIBATTSMGEUL - LITHIUM ION BATTERY RACK TYPE E (BATTERY EQUIPPED)
BUILDING 111 ENLARGED PARTIAL PLAN
SCALE: 14"=1'-0"
DP2
PP1
DP1
XFRM
UPS
BAT
CAB
GENERAL ELECTRICAL NOTES
1. CONTRACTOR SHALL PROVIDE A GREEN INSULATED EQUIPMENT GROUND CONDUCTOR IN ALL CIRCUITS AND TO ALL
NON-CURRENT CARRYING METALLIC ITEMS.
2. ALL WORK SHALL CONFORM TO THE CURRENT VERSIONS OF THE NATIONAL ELECTRICAL CODE AND THE NATIONAL ELECTRICAL
SAFETY CODE.
3. ALL NEW PENETRATIONS SHALL BE SEALED AND ALL HOLES LEFT BY REMOVALS SHALL BE REPAIRED AND PAINTED TO MATCH
EXISTING ADJACENT SURFACES.
4. ALL HOLES LEFT IN ELECTRICAL PANELS, BOXES, ...ETC. SHALL BE PROVIDED WITH KNOCKOUT CLOSURE PIECES.
5. NEW CONDUIT SHALL BE ELECTRICAL METALLIC TUBING. FITTINGS SHALL BE STEEL COMPRESSION TYPE; SET SCREW FITTINGS
AND DIE-CAST FITTINGS ARE NOT ALLOWED.
6. ALL NEW CONDUCTORS SHALL BE INSULATED COPPER CONDUCTORS
7. NO ELECTRICAL WORK SHALL BE PERFORMED ON "LIVE" EQUIPMENT. ALL EQUIPMENT MUST BE DE-ENERGIZED PRIOR TO ANY
WORK TAKING PLACE ON THEM. ALL OUTAGES SHALL OCCUR AFTER NORMAL WORKING HOURS OR ON WEEKENDS.
8. EXISTING EQUIPMENT SHALL NOT BE REMOVED UNTIL ALL OF THE NEW MATERIALS ARE ON SITE. AS MUCH OF THE NEW CONDUIT AS POSSIBLE SHALL BE INSTALLED PRIOR TO TAKING THE EXISTING OUT OF SERVICE TO LIMIT THE DOWNTIME. THIS SYSTEM IS CRITICAL TO NUWC OPERATIONS. ONCE THE DEMOLITION HAS BEGUN, WHICH IS EXPECTED TO BEGIN ON A FRIDAY LATE AFTERNOON, THE CONTRACTOR MUST COMPLETE THE NEW WORK AND HAVE THE NEW SYSTEM OPERATING BY MONDAY
MORNING AT 0600.
GRAPHIC SCALE
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 5'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text 15'
AutoCAD SHX Text 20'
| Sheets and Views |
| TITLE |
| 19-023A03 Replace UPS System - ENLARGED PLAN OF BLDG 111.pdf |
| Sheets and Views |
| ENLARGED PLAN |
| 19-023A02 Replace UPS System - FLOOR PLANS.pdf |
| Sheets and Views |
| PLAN |
File details come from the government source that posted it.