19-023A01_Replace_UPS_System.pdf

PDF 456 KB Posted

Attached to
Install UPS NUWCDIVNPT Federal contract opportunity
Solicitation number
N66604-19-Q-2891
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Drawing (3 sheets)

View the file

Other files for this federal contract opportunity

Other files attached to Install UPS NUWCDIVNPT, newest first.
File Type Posted
N66604-19-Q-2891-0002.pdf PDF
Amendment_0001_N6660419Q2891.pdf PDF
FY19_Base_Access_Request_(1).pdf PDF
N66604-19-Q-2891.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK REQ. NO.

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

N E

W P

O R

T, R

H O

D E

IS

LA

N D

FA

C

IL

IT

IE

S

B R

A N

C H

N A

V A

L U

N D

E R

S E

A W

A R

FA

R

E C

E N

TE

R

D

IV

IS

IO

N

SHEET OF

CONTRACT NO.

NAVFAC DRAWING NO.

NUWC DRAWING NO.

SCALE:

SIZE: ANSI D

A P

P R

O V

E D

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

D A

TE

S A

TI

S

FA

C

TO

R

Y T

O D

A

TE

D A

TE

D A

TE

D A

TE

SEAL

R E

V

IS

IO

N

S S

Y M

D E

S C

R

IP

TI

O

N D

A

TE

A P

P R

AS NOTED

W2019-145-01

19-023A

R E

P

LA

C E

M E

N T

O F

U .P

.S . S

Y S

TE

M

B U

IL

D

IN

G

A N

D T

E L.

H U

TS

TI

TL

E S

H E

E T

R . N

E

LS

O N

5/

/1

R . N

E

LS

O N

5/

/1

1 3

T-1

UPS REPLACEMENT

BUILDING 111 AND TEL. HUTS

NAVAL UNDERSEA WARFARE CENTER

NEWPORT, RI FACILITIES BRANCH

GENERAL NOTES

1. ALL WORK INCLUDED IN THIS CONTRACT SHALL CONFORM TO ALL STATE, NATIONAL AND OTHER CODES AND

ORDINANCES WHICH APPLY TO THIS PROJECT.

2. THE CONTRACTOR SHALL IDENTIFY AND FIELD VERIFY POINTS OF CONNECTION WHERE EXISTING AND NEW CONSTRUCTION MEET AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL PROCEED WITH THE WORK ONLY AFTER THE DISCREPANCIES HAVE BEEN RESOLVED BY THE GOVERNMENT.

3. ALL COMPONENTS AND WORK ARE NEW AND SHALL BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE

NOTED.

4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS.

5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

6. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE LEFT IN A NEAT AND CLEAN MANNER.

TOOLS SHALL NOT BE LEFT IN ANY MEANS OF EGRESS PATHS.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS WHICH ARE REQUIRED FOR THE

SATISFACTORY COMPLETION OF THE WORK.

8. SUBMIT TO THE GOVERNMENT FOR APPROVAL ALL SAFETY DATA SHEETS (SDS's) FOR ALL HAZARDOUS MATERIALS TO BE USED ON THE PROJECT PRIOR TO BRINGING ON SITE. IN ADDITION, SUBMIT FOR GOVERNMENT APPROVAL, ALL

OF THE PROPOSED MATERIALS TO BE USED ON THIS PROJECT.

9. UNLESS NOTED OTHERWISE HEREIN, THE CONTRACTOR SHALL DISPOSE OF AND/OR RECYCLE ANY CONSTRUCTION DEBRIS FROM THE PROJECT SITE AS REQUIRED BY THE STATE OF RHODE ISLAND. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY DISPOSAL PERMITS WHICH ARE REQUIRED. CONSTRUCTION DEBRIS FROM THE

PROJECT SITE SHALL BE DISPOSED OF IN A STATE APPROVED MANNER.

10. ALL ELECTRICAL WORK SHALL BE ACCOMPLISHED ON EQUIPMENT WHICH IS DE-ENERGIZED. THE CONTRACTOR SHALL NOT WORK ON ANY "LIVE" CIRCUITS. ALL OUTAGES SHALL OCCUR AFTER NORMAL WORKING HOURS OR ON

WEEKENDS.

N

FRESHWATER POND

CREEK

BREAKWATER

STONE

http://www.snopes.com/politics/taxes/realestate.asphttp://www.snopes.com/politics/taxes/realestate.asphttp://www.snopes.com/politics/taxes/realestate.asp http://www.snopes.com/politics/taxes/realestate.asp http://www.snopes.com/politics/taxes/realestate.asp

75A

GATE 26

116 117149

TANK

PNTS180

185 1192

438 179

ENCLO

SURES

CHEM

IC

AL S

TO

RAGE

102T

113 101

ATF

A1261

GATE 28

GATE 29

GATE 25

PROPANE

TANKS

CUNNINGHAM

B U

S H

N E

LL

DEFENSE HIGHWAY

C U

N N

IN

G

H

AM

LAY STR

EET

STREET

PORTER STREET

HUNT STREET

LEAVITT STREET

ERICSO

N

CUNNIN

GHAM

PORTER STREET

STR

EET

LAY STREET

STREET

FULTON

STREET

ST

R

EE

T

STREET

DEFENSE HIGHWAY

FL

E

E T

A C

C E

S S

R O

A

BUSHNELL STREET

BUSHNELL STREET

B O

O M

S

TR

E

E T

NORTH HOWELL STREET

HEADQUARTER STREET

FULTON

STREET

STREET

RAILROAD R

IGHT O

F W

AY

W A

N U

M E

T O

N O

M Y

G O L

F

C O

U N

T R

Y C

L U

B

C H

ILLER

C H

ILLER

CUNNINGHAM S

TREET

GATE 32

GATE 23

HUNT STREET

FULTON

STREET

FULTO

N

CUNNINGHAM STREET

HOWELL

STREET

NUWC SITE MAP

SCALE: 1" = 250'-0"

WORK AREA

11'-7"

20'-10"

11'-7"

20'-10"

11'-7"

20'-10"

WORK REQ. NO.

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

N E

W P

O R

T, R

H O

D E

IS

LA

N D

FA

C

IL

IT

IE

S

B R

A N

C H

N A

V A

L U

N D

E R

S E

A W

A R

FA

R

E C

E N

TE

R

D

IV

IS

IO

N

SHEET OF

CONTRACT NO.

NAVFAC DRAWING NO.

NUWC DRAWING NO.

SCALE:

SIZE: ANSI D

A P

P R

O V

E D

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

D A

TE

S A

TI

S

FA

C

TO

R

Y T

O D

A

TE

D A

TE

D A

TE

D A

TE

SEAL

R E

V

IS

IO

N

S S

Y M

D E

S C

R

IP

TI

O

N D

A

TE

A P

P R

AS NOTED

W2019-145-01

19-023A

R E

P

LA

C E

M E

N T

O F

U .P

.S . S

Y S

TE

M

B U

IL

D

IN

G

A N

D T

E L.

H U

TS

FL

O

O R

P

LA

N S

R . N

E

LS

O N

5/

/1

R . N

E

LS

O N

5/

/1

2 3

A-1

BUILDING 111

SCALE: 1/8" = 1'-0"

N

EXISTING UPS AND BATTERY SYSTEM TO BE

REPLACED (SEE ENLARGED PLAN ON SHEET A-2)

TEL. HUT BLDG 1341

SCALE: 3/16" = 1'-0"

TEL. HUT BLDG 1349

SCALE: 3/16" = 1'-0"

TEL. HUT BLDG 1350

SCALE: 3/16" = 1'-0"

SCOPE OF WORK:

BUILDING 111: SEE SHEET A-2 FOR BUILDING 111 REQUIREMENTS.

TELEPHONE HUTS: EACH OF THE THREE HUTS WILL REQUIRE THE FOLLOWING WORK:

A. PROVIDE TWO EACH 5kVA SMART UPS (RACK MOUNTING) WITH INTEGRAL 208V TO

120V STEP DOWN TRANSFORMER WITH THE FOLLOWING FEATURES:

TOPOLOGY: DOUBLE CONVERSION ONLINE

INPUT VOLTAGE OF 208 VOLTS SINGLE PHASE

INPUT FREQUENCY BETWEEN 40 TO 70 HZ

MINIMUM OF .85 POWER FACTOR

MINIMUM 97% EFFICIENT (ENERGY STAR COMPLIANT)

GRAPHICAL LCD DISPLAY

INTELLIGENT BATTERY MANAGEMENT SYSTEM

MEASURES ENERGY USAGE

ABILITY TO IMMEDIATELY PROTECT EQPT WHEN POWER RETURNS EVEN AFTER A

COMPLETE DISCHARGE OF THE BATTERY

LESS THAN 2% OUTPUT VOLTAGE DISTORTION

PROVIDE COMPLETE WITH DOCUMENTATION CD, RACK MOUNTING BRACKETS,

RACK MOUNTING HARDWARE, RACK MOUNTING SUPPORT RAILS, USB CABLE, USER MANUAL,

WARRANTY CARD, WEB/SNMP MANAGEMENT CARD

B. PROVIDE THE ASSOCIATED SERVER/TOWER RACK TO HOUSE THE TWO UPS UNITS

ABOVE

C. PROVIDE MANUFACTURERS 6 YEAR WARRANTY ON PARTS AND ON THE BATTERIES.

THE DESIGN IS BASED ON THE FOLLOWING MANUFACTURER AND PART NUMBERS. IT IS THE

INTENTION TO UTILIZE THESE SPECIFIC MANUFACTURER(S) AND PART NUMBERS IN THE NEW

CONSTRUCTION.

ITEM A: AMERICAN POWER CONVERSION (APC) PRODUCT SRT5KRMXLT-5KTF

ITEM B: APC PRODUCT AR3100

ITEM C: APC PRODUCT WBEXTWAR3YR-SP-05

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP 3

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP 4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(RAISED FLOOR

AutoCAD SHX Text

SYSTEM)

AutoCAD SHX Text

(RAISED FLOOR

AutoCAD SHX Text

SYSTEM)

AutoCAD SHX Text

(RAISED FLOOR

AutoCAD SHX Text

SYSTEM)

AutoCAD SHX Text

AutoCAD SHX Text

MENS

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

AutoCAD SHX Text 108A

AutoCAD SHX Text

RAMP 5

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

AutoCAD SHX Text

WORK REQ. NO.

E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

N E

W P

O R

T, R

H O

D E

IS

LA

N D

FA

C

IL

IT

IE

S

B R

A N

C H

N A

V A

L U

N D

E R

S E

A W

A R

FA

R

E C

E N

TE

R

D

IV

IS

IO

N

SHEET OF

CONTRACT NO.

NAVFAC DRAWING NO.

NUWC DRAWING NO.

SCALE:

SIZE: ANSI D

A P

P R

O V

E D

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

D A

TE

S A

TI

S

FA

C

TO

R

Y T

O D

A

TE

D A

TE

D A

TE

D A

TE

SEAL

R E

V

IS

IO

N

S S

Y M

D E

S C

R

IP

TI

O

N D

A

TE

A P

P R

AS NOTED

W2019-145-01

19-023A

R E

P

LA

C E

M E

N T

O F

U .P

.S . S

Y S

TE

M

B U

IL

D

IN

G

A N

D T

E L.

H U

TS

E N

LA

R

G E

D P

LA

N

O F

B

LD

G

R . N

E

LS

O N

5/

/1

R . N

E

LS

O N

5/

/1

3 3

A-2

SCOPE OF WORK

THE INTENT OF THIS PROJECT IS TO REMOVE AND REPLACE THE EXISTING 80 KW UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM

INCLUDING THE ASSOCIATED BATTERIES, BATTERY CABINET, AND MAINTENANCE/BYPASS SWITCH. THE WORK INCLUDES THE

FOLLOWING:

1. REMOVE THE EXISTING UPS SYSTEM INCLUDING ITS 3 PHASE, 480 VOLT, 125 AMP POWER SOURCE BACK TO PANELBOARD DP2. THE EXISTING FEED CONSISTS OF 3 # 2'S AND 1 # 8 GND IN 1-1/2" EMT BETWEEN DP2 AND THE MAINTENANCE - BYPASS SWITCH.

2. REMOVE THE EXISTING 125 AMP, 3 POLE BREAKER FROM SPACES 13-15-17 WITHIN PANELBOARD DP2 WHICH PROVIDES POWER TO

THE U.P.S.

3. REMOVE THE UPS BATTERY CABINET. PLACE BATTERIES ONTO A PALLET OUTSIDE OF THE BUILDING FOR PICKUP AND DISPOSAL BY

THE GOVERNMENT.

4. REMOVE THE MAINTENANCE/BYPASS SWITCH INCLUDING THE FEED BACK TO DP2, AS WELL AS, THE MISCELLANEOUS SHORT LENGTHS OF CONDUIT AND WIRING BETWEEN THE U.P.S. AND THE SWITCH FOR POWER AND COMMUNICATIONS.

5. INSTALL A NEW COMPLETE 80 KW UNINTERRUPTIBLE POWER SUPPLY SYSTEM, INCLUDING LITHIUM ION BATTERIES AND RACK, MAINTENANCE/BYPASS SWITCH AND ALL INTERCONNECTING COMMUNICATIONS AND POWER CIRCUITS REQUIRED BETWEEN THE MISCELLANEOUS COMPONENTS FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM. SYSTEM SHALL PROVIDE FOR 23 MINUTES OF

RUN TIME WITH 100 PERCENT LOAD AFTER POWER IS LOST.

6. PROVIDE A NEW 3 POLE, 480 VOLT, 175 AMP CIRCUIT BREAKER FOR SPACE 13-15-17 WITHIN PANELBOARD DP2 TO FEED THE NEW U.P.S. SYSTEM. RUN 3 # 2 0 AND 1 # 6 GND IN 2" EMT FROM THIS NEW BREAKER TO THE NEW U.P.S. SYSTEM VIA THE MAINTENANCE -

BYPASS SWITCH

7. THE LOAD SERVED BY THE UPS SYSTEM IS THE EXISTING 112.5 KVA TRANSFORMER. CONTRACTOR SHALL MODIFY CONDUIT AND WIRING AS NECESSARY TO CONNECT THIS EXISTING LOAD INTO THE NEW MAINTENANCE/BYPASS CABINET. THE EXISTING FEED TO

THE TRANSFORMER CONSISTS OF 3#1

0 AND 1#6 GROUND IN 2 INCH ELECTRICAL METALLIC TUBING.

8. AS INDICATED IN NOTE 5 ABOVE, REMOVE THE EXISTING AND PROVIDE ALL NEW INTERCONNECTING WIRING AND CONDUIT BETWEEN

THE MAINTENANCE BYPASS SWITCH AND THE BATTERY AND/OR UPS SYSTEM FOR POWER, COMMUNICATIONS, ...ETC. ALTHOUGH NOT SHOWN ON THE PLAN, CONTRACTOR SHALL PROVIDE A HINGED COVER ENCLOSURE, COMPLETE WITH TERMINAL STRIPS AND FUSES, (SIZED BY MFR), TO SERVE THE CONTROL POWER CIRCUITS BETWEEN THE UPS AND BATTERY RACKS AS DICTATED BY THE

MANUFACTURER. PROVIDE ALL REQUIRED INPUT AND OUTPUT CONDUIT AND WIRING.

9. PROVIDE ALL REQUIRED CLEARANCES TO EXISTING WALLS AND CEILINGS AS RECOMMENDED BY THE MANUFACTURER AND/OR

REQUIRED BY THE NATIONAL ELECTRICAL CODE.

10. PROVIDE A TOTAL OF 5 YEARS OF ONSITE PARTS AND LABOR (EXCLUDING BATTERIES). THIS SHALL BE INCLUDED WITHIN THE

OVERALL BID. PRICING SHALL BE BASED ON PREVAILING WAGES.

11. THE INTENT IS TO PERFORM AS MUCH WORK AS POSSIBLE WITH RESPECT TO THE NEW CONDUIT FEED TO THE UPS SYSTEM PRIOR

TO TAKING THE EXISTING OUT OF SERVICE TO LIMIT THE AMOUNT OF DOWN TIME.

THE DESIGN IS BASED ON THE FOLLOWING MANUFACTURER AND PART NUMBERS. IT IS THE INTENTION TO UTILIZE THESE SPECIFIC

MANUFACTURER(S) AND PART NUMBERS IN THE NEW CONSTRUCTION.

UPS: PART NO. GVSUPS80KGS - GALAXY VS UPS 80KW 480V

MAINTENANCE/BYPASS CABINET - PART NO. GVSBPSU80G - GALAXY VS MAINTENANCE/BYPASS CABINET BATTERY RACK - PART NO. LIBATTSMGEUL - LITHIUM ION BATTERY RACK TYPE E (BATTERY EQUIPPED)

BUILDING 111 ENLARGED PARTIAL PLAN

SCALE: 14"=1'-0"

DP2

PP1

DP1

XFRM

UPS

BAT

CAB

GENERAL ELECTRICAL NOTES

1. CONTRACTOR SHALL PROVIDE A GREEN INSULATED EQUIPMENT GROUND CONDUCTOR IN ALL CIRCUITS AND TO ALL

NON-CURRENT CARRYING METALLIC ITEMS.

2. ALL WORK SHALL CONFORM TO THE CURRENT VERSIONS OF THE NATIONAL ELECTRICAL CODE AND THE NATIONAL ELECTRICAL

SAFETY CODE.

3. ALL NEW PENETRATIONS SHALL BE SEALED AND ALL HOLES LEFT BY REMOVALS SHALL BE REPAIRED AND PAINTED TO MATCH

EXISTING ADJACENT SURFACES.

4. ALL HOLES LEFT IN ELECTRICAL PANELS, BOXES, ...ETC. SHALL BE PROVIDED WITH KNOCKOUT CLOSURE PIECES.

5. NEW CONDUIT SHALL BE ELECTRICAL METALLIC TUBING. FITTINGS SHALL BE STEEL COMPRESSION TYPE; SET SCREW FITTINGS

AND DIE-CAST FITTINGS ARE NOT ALLOWED.

6. ALL NEW CONDUCTORS SHALL BE INSULATED COPPER CONDUCTORS

7. NO ELECTRICAL WORK SHALL BE PERFORMED ON "LIVE" EQUIPMENT. ALL EQUIPMENT MUST BE DE-ENERGIZED PRIOR TO ANY

WORK TAKING PLACE ON THEM. ALL OUTAGES SHALL OCCUR AFTER NORMAL WORKING HOURS OR ON WEEKENDS.

8. EXISTING EQUIPMENT SHALL NOT BE REMOVED UNTIL ALL OF THE NEW MATERIALS ARE ON SITE. AS MUCH OF THE NEW CONDUIT AS POSSIBLE SHALL BE INSTALLED PRIOR TO TAKING THE EXISTING OUT OF SERVICE TO LIMIT THE DOWNTIME. THIS SYSTEM IS CRITICAL TO NUWC OPERATIONS. ONCE THE DEMOLITION HAS BEGUN, WHICH IS EXPECTED TO BEGIN ON A FRIDAY LATE AFTERNOON, THE CONTRACTOR MUST COMPLETE THE NEW WORK AND HAVE THE NEW SYSTEM OPERATING BY MONDAY

MORNING AT 0600.

GRAPHIC SCALE

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text 5'

AutoCAD SHX Text 0'

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 15'

AutoCAD SHX Text 20'

Sheets and Views
TITLE
19-023A03 Replace UPS System - ENLARGED PLAN OF BLDG 111.pdf
Sheets and Views
ENLARGED PLAN
19-023A02 Replace UPS System - FLOOR PLANS.pdf
Sheets and Views
PLAN

File details come from the government source that posted it.