Video_Wall_RFQ_N66604-17-Q-3049_Amendment_01.pdf

PDF 10 KB Posted

Attached to
Planar Video Wall System Federal contract opportunity
Solicitation number
N66604-17-Q-3049
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 01 Document: Industry Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Planar Video Wall System, newest first.
File Type Posted
N66604-17-Q-3049_Amendment_02.pdf PDF
Video_Wall_N66604-17-Q-3049_RFQ_Rev_4.pdf PDF
Planar_Video_Wall_Parts_List_Rev_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # N66604-17-Q-3049

Amendment 01: Industry Question and Answers

Question:

1. Size dimensions or drawing of spaces?

Answer:

Location 1(L1), has one 16’ x 9’ front projection system that will be replaced with the 55” Clarity Matrix video wall(VW)(horizontal).

Location 2 (L2), has two 123” diagonal 16:10 aspect projection systems that will be replaced with the 46” Clarity Matrix VW (vertical)

Question:

2. Ceiling and floor type? (drop ceiling grid? Raised deck?)

Answer:

L1, drop ceiling and raised deck. L2, Drop ceiling and raised deck.

Question:

3. Wall type? (cinder block/drywall?) (insulation in walls?)

Answer:

L1, gypsum, aluminum studs and insulation. L2m gypsum, aluminum and wood studs and probably no insulation.

4. Offeror or Government responsible for additional power where required?

Answer:

Government is responsible for additional power.

5. Offeror or Government responsible for additional network drops where required?

Answer:

Offeror is responsible for VW network connections.

Question:

6. I am reading this solicitation as the selected contractor will build the video walls so that the command can make their own connections, is that accurate?

Answer:

Yes, the contractor to provide interconnects as specified in the parts list.

Question:

7. Does NUWC Newport currently have the same size video walls, 1st wall comprised of (Qty 16) 55” monitors and the 2nd wall comprised of (Qty 15) 46” monitors? Is this simply an upgrade of Gen1 to Gen2 for 4K quality?

Answer:

No. See answer 1.

Question:

8. The attachment Video Wall N66604-17-Q-3049 states that the wall will “interconnect all three locations involved in this requirement”, is there any amplifying information to this requirement? Does the selected contractor have any involvement in ensuring this is operable and correct?

The government is responsible for interconnecting the locations.

9. The next to last line item appears to be a Planar commissioning line item. We are staffed by Planar certified technicians and are authorized to commission systems on our own, it this line item necessary?

Yes