STATEMENT OF WORK (INLCUDING ADDENDUMS)

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision 7.0 1 July 2015

Submarine Bridge Trainers

Engineering Development Model

Projector System

STATEMENT OF WORK

Procurement Sensitive Information See FAR 3.104 1

1.0 BACKGROUND

The Submarine Bridge Trainer (SBT) allows a full bridge party to complete exercises to navigate, pilot, and moor the boat to and from a pier while interacting with a complex visual and auditory environment with all of the relevant ship sensors and systems. The crew members being trained are those who man the sail and the control room during surfaced events. The trainer is a near life-size mock-up of the front-end of a generic submarine sail, surrounded by a 360-degree horizontal and a 70-degree vertical dynamic visual simulation of imagery and 16 channels of 3D sound with own-ship dynamics provided by Navy-certified hydrodynamic models. Realistic control rooms for the 688-class and Virginia-class submarines have been constructed and provide the ship systems (including commercial and military radar simulations) and the dual periscopes needed for surfaced events.

2.0 SCOPE

Code 253 is tasked to integrate a Projection System into the existing NUWCDIVNPT Submarine

Bridge Trainer (SBT) Engineering Development Model (EDM), located in building 1171/CSTL.

The contractor shall deliver, install, configure and perform all necessary diagnostic testing to ensure optimum performance of the projection system for the SBT EDM at NUWCDIVNPT.

4.0 REQUIREMENTS

The contractor shall perform all installation work in the Naval Undersea Warfare Center, Newport RI 02840, Code 25, Submarine Bridge Team Trainer area located in building 1171

Combat System Technology Laboratory.

4.1 Projection System

The contractor shall deliver and install a projector system capable of projecting a virtual marine environment with a 360 degree horizontal field of view and a 70 degree vertical field of view (20 degree above and 50 degree below the horizon); upon the existing projection display screen; a constructed 14 foot radius spherical dome with its equator on the same plane as the reference eye-point of the projection system. Each unit of the overall projection system shall meet the minimum requirements specified in Appendix A: "Required Technical Characteristics".

4.1.1 Projector System Synchronization, Alignments, Color Matching and Image Warping

The contractor shall perform projector system alignments, adjustments, color matching and image warping necessary to achieve visual characteristics described in Appendix A: "Required

Technical Characteristics". The contractor shall synchronize all projectors to match color, brightness (maximum white) and darkness (minimum black) between channels.

Engineering Development Model

Projector System

STATEMENT OF WORK

Procurement Sensitive Information See FAR 3.104 2

4.1.2 Software Maintenance Tools

The contractor shall provide software maintenance tools required for projector system synchronization described in 4.1.1. The contractor shall provide software maintenance tool users guide. 4.1.3 Hardware Maintenance Tools

The contractor shall provide hardware maintenance tools required for projector system synchronization described in 4.1.1.4.2 Installation

The contractor shall install in building 1171, NUWC Division Newport, RI a system comprising dual projector system assemblies (upper and lower) capable of displaying a 360 degree horizontal field of view and a 70 degree vertical field of view (20 degree above and 50 degree below the horizon). An exception to the requirement for the full vertical FOV coverage exists for the lower projector bank for the zone directly to the rear of the trainer where the access ladder will shadow the projected image. (Appendix B Bridge Team Trainer Design Schematic –

A)

The contractor shall install the upper projector system assembly concurrent with the start of the hardware installation schedule. The contractor shall install the lower projector system assembly one week after installation of the upper projector system assembly.

Each projector system assembly shall comprise a sufficient number of projectors to meet or exceed the technical specifications detailed in Appendix A: "Required Technical Characteristics" section. The projection system shall also include all hardware, software and processing equipment associated with image warping, edge blending, black level enhancement, and other features specified herein, exclusive of government furnished image generators (IG). The projector system shall also have capacity to support night scenes and weather effects, such as fog and rain.

Each projector system assembly shall be powered via a government furnished 120 VAC outlet.

The contractor shall ensure applicable safety regulations are met or exceeded.

Projector Installation Drawings:

The contractor shall develop and provide drawings and documentation showing engineering details and specifications for projector system layout, lens types, warping techniques and projector system integration techniques, including required software interfaces.

The contractor shall deliver the preliminary drawings 31 DAYS AFTER CONTRACT AWARD.

As part of the contractor installation, contractor led instruction in set-up and maintenance of the projector system shall be provided to on-site NUWC personnel. The contractor led instruction shall be consistent with section 4.3.

4.3 Contractor Provided Training

Engineering Development Model

Projector System

STATEMENT OF WORK

Procurement Sensitive Information See FAR 3.104 3

The contractor shall provide the following training sessions to government personnel:

• One (1) full day of Digital Projection projector training to NUWC staff in Newport.

• One full day of Scalable Display training to NUWC staff in Newport for both blending/warping and also color matching via their software packages. Additionally, test shall be conducted wherein projectors shall be misaligned and user will need to conduct scalable mesh procedure to bring projectors back into alignment.

• Half day training done on Operational System includes turning all on/off, knowing locations of components in system and preliminary troubleshooting issues in unlikely event of failure mode.

The contractor shall provide contractor furnished training documentation. The training documentation shall include technology fundamentals as they apply to the SBT, including signals - analog and digital, video displays - aspect ratio and formats, and power conditioning.

The training documentation shall include control options and calibration of the projectors operating standalone and as a system of projectors. In addition, the training documentation shall include testing and troubleshooting methodologies relevant to the SBT projection system.

4.4 Warranty

The contractor shall provide for the following service warranty:

One (1) Additional year to the Factory Warranty of all parts

Projection System Maintenance covering the following o 2 visits at mutually agreed to times; includes one (1) emergency 24 hr. response o Cleaning intakes, o Checking internals, o Diagnostics (i.e. troubleshooting), o Adjusting geometry/focus, and o Color matching.

4.5 Integration, Validation & Verification

At the completion of the integration, validation & verification phase, the contractor shall support a fully operational demonstration of the SBT/EDM under normal operational training conditions under the acceptance criteria described in Appendix-C “Projection System Acceptance Tests”.

As part of the Government acceptance, contractor shall provide instruction in set-up and maintenance of the projector system to on-site NUWC personnel.

Engineering Development Model

Projector System

STATEMENT OF WORK

Procurement Sensitive Information See FAR 3.104 4

5.0 GOVERNMENT FURNISHED INFORMATION & EQUIPMENT

For reference, the contractor will be provided all existing software/documentation required to complete the projection system installation. 3-D AutoCAD files upon request. An engineering drawing is provided as Appendix-B Bridge Team Trainer Design (Schematic A & B). In addition, the government will make available, upon request, the following GFI & GFE:

Program Master Schedules

Submarine Bridge Trainer Schematics and Drawings

Submarine Bridge Trainer/Integrated Submarine Piloting And Navigation -

Interactive Electronic Technical Manuals (IETMs)

Product Item Descriptions(PIDs) for SBT/ISPAN

Submarine Bridge Trainer Engineering Development Model (SBT-EDM) (on-site) i.e. Image Generator System

Integrated Submarine Piloting and Navigation Trainer (ISPAN) (on-site)

Appendix-A Required Technical Characteristics

Appendix A

All projection system technical characteristics correspond to operation within a 14 foot radius spherical dome with its equator on the same plane as the reference eye-point of the projection system displaying a 360 degree horizontal field of view and a 70 degree vertical field of view (20 degree above and 50 degree below the horizon).

Each unit of the overall projection system shall meet the following minimum requirements:

Luminous LED illuminated (Light Emitting-Diode), with a 60,000 hour or longer run time; (Luminous LEDs provide a wider color space), 1920 x 1200 native resolution WUXGA (Widescreen Ultra Extended Graphics

Arraywith support for upgrading to 2560X1600.

High Definition Multimedia Interface (HDMI) (minimal 2 ports)

Contrast ratio shall be 10,000:1 or higher

Color triangle that plots on the International Commission on Illumination (CIE) chart as large or larger than the following color space coordinates:

Red: x=.690, y= .300

Green: x=.190, y= .700

Blue: x=.140, y= .026 o 900 lumens of brightness or more at the above color triangle specification.

LED dimming

Smear reduction

Provide 6 Arc min/OLP (Optical Line Pair) or better (less than 6)

(This is not an average and is established to ensure 6 Arc min or less is met throughout)

Projector / warp box connections shall support max resolution using DVI (Digital

Visual Interface) Fiber Extenders

Operate at 120VAC, 60 Hz

Uninterrupted scene for 360 degrees around and +20 degrees/ -50 degrees vertical.

Exception for the area surrounding the door to be specified.

Component Video (Standard and High Definition) via YPrPb, RGB or RGBS

S-Video (PAL, NTSC & SECAM)

Composite Video (PAL, NTSC & SECAM)

Local Area Network (LAN) interface

NUWCDIVNPT SBT Trainer

Projection System Acceptance Test Criteria

I. Projection System Hardware Installation Acceptance Criteria

A. All previous display hardware, including mounts & projector stands, 4 wire fiber signal extenders, converters and ancillary cabling are removed.

B. New Fiber Optic cables are in place, along with Extenders and DVI cables (2 short lengths: one at each for transmitter and receiver).

C. New UTP and USB cables are in place – for cameras and projectors

D. All imaging system mounts and power supplies are in place and functioning.

E. Networks switches are in place and functioning.

F. 16 new Digital Projection M-Vision LED projectors are in place and functioning.

G. EPDS Truss mount systems, including clamps and individual projector mount brackets are in place both on-floor and off-ceiling locations

H. New Digital Projection lenses are installed.

I. New Electric Picture Mantis motorized masking system installed and operational.

II. Projection Systems Test/Performance

A. The new projection system shall replicate the same horizontal and vertical fields of view (FoV) as prior system. Image height shall be 210.5” and Horizontal FoV shall be 360 degrees created by two rows of projectors in circular config., spaced at approximately 45 degree intervals. Vertical

FoV should yield approx. +30/-56 degrees from designated eye point.

B. NUWC imagery will be tested to confirm Bearing points correctly line up at 0 degrees/dead ahead, and +/- 30, 60, 90, 120, 150, and 180 degree markings on-screen as indicated from designated center to confirm accuracy of virtual scene.

C. There shall be minimum luminance of 3fL (Foot-Lamberts) with luminance uniformity across all channels and eye points greater than or equal to 90%.

D. The luminance and brightness levels shall be within 10% of the average across the entire displayed image.

E. There shall be surface resolution of at worst 4 Arc-min/OLP

F. There shall be geometric correction for given eye point to within 0.1 degree.

G. Visual Scene on all projectors optically & mechanically blended for night training.

H. The displayed image shall be integrated and aligned with the NUWC image generation software

(content) to provide correct geometric perspective and accurate color representation.

NUWCDIVNPT SBT Trainer

Projection System Acceptance Test Criteria

I. Blend areas between channels shall be imperceptible.

J. Visual objects traversing between channels shall remain clearly visible with no noticeable misalignment.

K. All visual artifacts shall appear smooth with no distinguishable aliasing.

III. Training and Administrative:

A. One full day of DP projector training to NUWC staff in Newport

B. One full day of Scalable Display training to NUWC staff in Newport for both blending/warping and also color matching via their software packages. Test will be conducted wherein projectors will be mis-aligned and user will need to conduct scalable mesh procedure to bring projectors back into alignment.

C. Half day training done on Operational system, includes turning all on/off, knowing locations of components in system and preliminary troubleshooting issues in unlikely event of failure mode.

D. One set of As-Built Drawings, in accordance with CDRL A001, in Hard-Copy and CDROM, includes:

1. Top-Down Mechanical Layout

2. Side View Mechanical Layout

3. Projection Path Layout

4. Angle Layout

5. Control Schematic

6. Wiring Diagram, including Power, Signal, and Network.

7. Sim Mount Schematic

8. Image Alignment & Blending System Schematic

SBT SOW FINAL
A (3)
B
C
Schematic - A: SCHEMATIC - A
Schematic - B: SCHEMATIC - B
Text1: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Administrative or Operational (31 MAR 2015). Other requests shall be referred to Naval Undersea Warfare Center, Division Newport, 1176 Howell Street, Newport, Rhode Island 02840