About this file

This statement of work outlines requirements for the production of missile electronics box and hazard electronics box driver and interface circuit card assemblies. The Naval Surface Warfare Center seeks qualified contractors to manufacture 455 MEB interface circuit card assemblies, 455 MEB driver circuit card assemblies, 62 HEB interface circuit card assemblies, and 62 HEB driver circuit card assemblies in accordance with the technical data packages. Contractors must follow quality assurance and configuration management standards and be able to provide certificates of conformance. The government will perform acceptance testing and have the option to conduct physical configuration audits of the first production lots. Interested parties are requested to respond to the related sources sought notice by 12 November 2020 with capability statements including company and small business information, estimated unit pricing, and commentary on the statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to MEB and HEB Driver and Interface Circuit Card Assemblies, newest first.
File Type Posted
3. SOW_HEB_MEB_Driver_Interface_CCA_v2 (draft).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MK 41 VERTICAL LAUNCH SYSTEM

MISSILE ELECTRONIC BOX AND HAZARD ELECTRONIC BOX INTERFACE AND DRIVER CIRCUIT CARD ASSEMBLIES

1. INTRODUCTION

The Naval Surface Warfare Center (NSWC), Corona Division, Measurement Science & Engineering Department, Interface Engineering & Assessment Division (MS20) builds and maintains Navy Interface Gages for ship-launched missiles, surface and underwater munitions; air-launched missiles and strategic weapons including fleet ballistic missile systems and subsystems.

2. BACKGROUND

Naval Sea System Command (NAVSEA) Integrated Weapons System (IWS) Code 3L has a requirement to procure Missile Electronic Box (MEB) and Hazard Electronic Box (HEB) Driver and Interface Circuit Card Assemblies (CCA). These CCAs make up part of the MEB and HEB, which in turn, is part of the Launch Sequencer (LSEQ) for the MK 41Vertical Launching System (VLS). These CCAs are a critical and required part of the MK 41 VLS.

3. SCOPE

The Contractor shall be responsible for the satisfactory and timely performance of all tasks defined in the Statement of Work (SOW). This SOW, with its supporting attachments and referenced documentation, describes the total requirement for the manufacture, assembly, test and delivery of MK 41 VLS MEB and HEB Driver and Interface CCAs.

4. APPLICABLE DOCUMENTS

The Technical Data Package (TDP) consists of drawings 8660408-9, 8660412-9, 8660458-9 and 8660462-9, and all subcomponent drawings. The included drawings package provides detailed information, including all specifications, for the manufacturing of the CCAs. In addition to these drawings, the following documents form a part of this SOW to the extent specified herein, including all applicable terms, conditions, clauses, attachments and exhibits. The Contractor shall apply the latest version of the documents in effect at the time of award of the contract.

4.1 Government Documents

Document Number
Document Title
MIL-STD-109C
Quality Assurance Terms and Definitions
MIL-STD-1686C
Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, I Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
WS 20130
Production Environmental Test Requirements for VLS

TL130-AD-PLN-010-VLS

Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management

MK 41 VLS Standing Instruction 94-1F, Attachment 6
Marking for technical data
TL130-AD-PLN-030-VLS
Firmware Configuration Management
MIL-STD-130
Identification Marking
MIL-HDBK-263
Electrostatic Discharge Control Handbook
NAVSEA Drawings 8660408-9
MEB Interface CCA Technical Data Package
NAVSEA Drawings 8660412-9
MEB Driver CCA Technical Data Package
NAVSEA Drawings 8660458-9
HEB Interface CCA Technical Data Package
NAVSEA Drawings 8660462-9
HEB Driver CCA Technical Data Package

In addition, the attached TDP drawings 8660408-9, 8660412-9, 8660458-9 and 8660462-9 contain several subcomponent level drawings, including Parts List (PL), Notice of Revisions (NOR), Gerber files and release notes. These files are listed below for each CCA. The Contractor shall thoroughly review all files to identify the latest drawing revision and parts.

MEB Interface CCA TDP (P/N: 8660408-9)

Drawing No.
Related Files (.pdf)
Description
8660408
8660408B_appr_04102019
CCA, Interface, MEB Revision B
8660408B_PL_appr_04102019
Parts List
8660409
8660409_NOR001
Notice of Revision 001
8660409rev-
PCB, Interface, MEB
8660409revA
Revision A
8660409B_appr_04102019
Revision B
8660410
8660410_NOR001
Notice of Revision 001
8660410rev-
Schematic, MEB Interface
8660410 RevA
Revision A
8660411
8660411_MEB FW_NOR 1_181108
Notice of Revision 001
8660411rev-
Firmware, Interface CCA, MEB
8660411A_appr_04152019
Revision A
8660516
8660516 NOR001 MEB IF
Notice of Revision 001
8660516rev-
ATR, CCA, MEB Interface
8660516_ MEB_ATR_REV_A_appr_04102019
Revision A

Additional Files

Gerber
8693403 Driver ITA PC rev A
Gerber zip files
8693403 Driver ITA PC rev C
Gerber zip file
8693405 Driver J1 Fanout rev A
Gerber zip file
8693407 Driver J2 Fanout rev A1
Gerber zip file
Release 2020-04-14
8660408-9 (MEB Interface CCA) QA Passed 2020-04-14

8660408-9 (MEB Interface CCA).AUDIT 8660408-9 (MEB Interface CCA).IPL 8660408-9 Proprietary Readme QA/Audit Report files

MEB Driver CCA TDP (P/N: 8660412-9)

Drawing No.
Related Files (.pdf)
Description
8660412
8660412_NOR004_appr_08082019
Notice of Revision 004
8660412_NOR002
Notice of Revision 002
8660412_NOR001_appr_05312018
Notice of Revision 001
8660412B_PL_appr_04102019
Parts List Revision B
8660412PL_RevA
Parts List Revision A
8660412Prev- PL
Parts List
8660412B_appr_04102019
Revision B
8660412_RevA
Revision A
8660412rev-
CCA, Driver, MEB
8660413
8660413_NOR001
Notice of Revision 001
8660413B_appr_04102019
Revision B
8660413_RevA
Revision A
8660413rev-
PCB, Driver, MEB
8660414
8660414_NOR002_appr_08082019
Notice of Revision 002
8660414_NOR001
Notice of Revision 001
8660414_RevA
Revision A
8660414rev-
Schematic, MEB Driver
8660517
8660517 NOR001 MEB Driver
Notice of Revision 001
8660517_MEB_Driver_ATR_REV_A_appr_04152019
Revision A
8660517rev-
ATR, CCA, MEB Driver

Additional Files

Gerber
8693403 Driver ITA PC rev A
Gerber zip files
8693403 Driver ITA PC rev C
Gerber zip file
8693405 Driver J1 Fanout rev A
Gerber zip file
8693407 Driver J2 Fanout rev A1
Gerber zip file
Release 2020-04-14
8660412-9 (MEB Driver CCA) QA Passed 2020-04-14

8660412-9 (MEB Driver CCA).AUDIT 8660412-9 (MEB Driver CCA).IPL 8660412-9 Proprietary Readme QA/Audit Report files

HEB Interface CCA TDP (P/N: 8660458-9)

Drawing No.
Related Files (.pdf)
Description
8660458
8660458_NOR002
Notice of Revision 002
8660458B_PL_appr_04102019
Parts List Revision B
8660458PL_RevA
Parts List Revision A
8660458rev- PL
Parts List
8660458B_appr_04102019
Revision B
8660458_RevA
Revision A
8660458rev-
CCA, Interface HEB
8660459
8660459_NOR001
Notice of Revision 001
8660459B_appr_04102019
Revision B
8660459_RevA
Revision A
8660459rev-
PCB, Interface, HEB
8660460
8660460_NOR001
Notice of Revision 001
8660460_RevA
Revision A
8660460rev-
Schematic, Interface, HEB
8660461
8660461_HEB FW_NOR 1_181108
Notice of Revision 001
8660461A_appr_04102019
Revision A
8660461rev-
Firmware, Interface CCA, HEB
8660519
8660519 NOR001 HEB IF
Notice of Revision 001
8660519_HEB_ATR_REV_A_appr_04102019
Revision A
8660519 HEB IF ATR_appr_05312018
ATR, CCA, HEB Interface

Additional Files

Gerber
8693403 Driver ITA PC rev A
Gerber zip files
8693403 Driver ITA PC rev C
Gerber zip file
8693405 Driver J1 Fanout rev A
Gerber zip file
8693407 Driver J2 Fanout rev A1
Gerber zip file
Release 2020-04-14
8660458-9 (HEB Interface CCA) QA Passed 2020-04-14

8660458-9 (HEB Interface CCA).AUDIT 8660458-9 (HEB Interface CCA).IPL 8660458-9 Proprietary Readme QA/Audit Report files

HEB Driver CCA TDP (P/N: 8660462-9)

Drawing No.
Related Files (.pdf)
Description
8660462
8660462_NOR002
Notice of Revision 002
8660462_NOR001_appr_05312018
Notice of Revision 001
8660462B_PL_appr_04152019
Parts List Revision B
8660462PL_RevA
Parts List Revision A
8660462rev- PL
Parts List
8660462B_appr_04152019
Revision B
8660462_RevA
Revision A
8660462rev-
CCA, Driver, HEB
8660463
8660463_NOR001
Notice of Revision 001
8660463B_appr_04102019
Revision B
8660463_RevA
Revision A
8660463rev-
PCB, Driver, HEB
8660464
8660464_NOR001
Notice of Revision 001
8660464B_appr_04102019
Revision B
8660464_RevA
Revision A
8660464rev-
Schematic, Driver, HEB
8660520
8660520 NOR001 HEB Driver
Notice of Revision 001
8660520_HEB_Driver_ATR_REV_A_appr_04102019
Revision A
8660520 HEB Driver ATR_appr_05312018
ATR, CCA, HEB Driver

Additional Files

Gerber
8693403 Driver ITA PC rev A
Gerber zip files
8693403 Driver ITA PC rev C
Gerber zip file
8693405 Driver J1 Fanout rev A
Gerber zip file
8693407 Driver J2 Fanout rev A1
Gerber zip file
Release 2020-04-14
8660462-9 (HEB Driver CCA) QA Passed 2020-04-14

8660462-9 (HEB Driver CCA).AUDIT 8660462-9 (HEB Driver CCA).IPL 8660462-9 Proprietary Readme QA/Audit Report files

4.2 Industry Documents

Document Number
Document Title
ANSI/ISO/ASQC Q9001
Quality Systems – Model for Quality Assurance in Design, Development, Production, Installation and Servicing
ANSI/EIA-649 2011
National Consensus Standard for Configuration Management
ISO 9001
Quality Program Requirements
SAE Aerospace Standard AS9102 Rev A
Aerospace First Article Inspection
ISO 14000
Environmental Management Systems Standards
ANSI/ESD S20.20
Protection of Electronic Assembly
IPC-J-STD-001
Requirements for Soldered Electrical and Electronic Assemblies
IPC-CC-830
Quality Electrical Insulating Compounds
IPC-A-610
Acceptability of Electronic Assemblies
PCI Local Bus-2.2
PCI Local Bus Specifications Revision 2.2

5.0 REQUIREMENTS

The Government requires manufacturing of MK 41 VLS MEB and HEB Driver and Interface CCAs in accordance with the TDP drawings 8660408-9, 8660412-9, 8660458-9 and 8660462-9. All the MEB and HEB Driver and Interface CCAs shall meet all form, fit, and function requirements in accordance with the TDP drawings and associated specifications.

Part Number
Description
Brand Name
QTY
8660408-9
MEB Interface CCA
N/A
455
8660412-9
MEB Driver CCA
N/A
455
8660458-9
HEB Interface CCA
N/A
62
8660462-9
HEB Driver CCA
N/A
62

Optional Requirement:

The Government has the option for Physical Configuration Audit of MEB Interface CCA, MEB Driver CCA, HEB Interface CCA and HEB Driver CCA.

5.1 Physical Configuration Audit (Option Item, If Exercised)

The Government will perform a Physical Configuration Audit (PCA) of an assembly built in the first production lot of the following items:

1. MEB Driver CCA

1. MEB Interface CCA

1. HEB Driver CCA

1. HEB Interface CCA

The PCA purpose is to verify the as-built configuration matches its technical documentation and validate supporting processes. The PCAs shall be conducted in accordance with Section 7 of TL130-AD-PLN-010-VLS, Configuration Management Program Plan for the MK 41 Vertical Launching System, Volume 1, Equipment (Hardware) Configuration Management.

The Contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for these Government audits. Technical personnel shall be required to have necessary tools, measuring devices and other equipment necessary for equipment disassembly, dimensional & tolerance verification and performance verification. The contractor shall provide an area for audit conduct that is well illuminated, temperate and low noise level. The audit work area shall contain worktables, print copies of all pertinent drawings, telephone and easy access to a copy machine.

The contractor shall provide during the PCA, at a minimum, individual parts that make up the configuration item, completed assembly(s), an as-built list delineating all Engineering Change Proposal (ECPs) (either requested or approved). Hardcopies of production specifications and technical drawings, complete shortage list, manufacturing instructions, acceptance test procedures and data, purchase order documents and associated certificates of conformance from suppliers or appropriate documents indicating compliance with material or drawing requirements in accordance with CDRL A005.

The audits will be conducted at the Contractor or subcontractor facility by NSWC Dahlgren Division or other Government designated representatives.

Each audit will be performed after assembly completion (including acceptance testing) and prior to DD 250 Acceptance. For planning purposes, each complete PCA will require approximately two weeks for pre-audit preparations, three weeks for audit conduct and three weeks for post audit close-out efforts.

Following the conduct of the PCA, the contractor shall generate the necessary documentation to resolve all audit findings and provide these to the Navy audit team within the time frame specified by the Navy PCA lead in accordance with CDRL A006. This documentation shall be evaluated by the PCA team to assess the corrective action taken to close the audit finding. This necessary documentation may include but not be limited to, revised manufacturing processes, engineering change proposals, Notice of Revisions, Specification Change Notice and revised TDP drawings.

Government and Contractor pre and post PCA activities are described in sections 7.4 through 7.7 of the VLS Configuration Management Plan TL130-AD-PLN-010-VLS.

All deficiencies discovered during the PCA’s that affect form, fit, function or performance shall be corrected at Contractor’s expense prior to unit delivery to the Government.

5.2 Government Technical Data Reviews, Quality Audits

During the performance of the contract, the Government shall have the right to perform technical data reviews and quality audits consisting of evaluation of records, processes and products to verify the Contractor's compliance with the respective quality programs. The Government audits may include evaluation of effectiveness in implementing the Contractor's and Subcontractors' or suppliers' audit programs to promote prevention of defects, which includes schedule of audits, evaluation of operations, notification of required corrective action with follow-up and means of notification to top management concerning audit results.

6.0 CONFIGURATION MANAGEMENT

The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to assure configuration identity with the MEB and HEB Driver and Interface CCAs produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

6.1 Configuration Identification

The Contractor shall maintain identification of the product baselines throughout fabrication, testing, and delivery. The Contractor shall ensure that equipment is assigned identifying numbers, designators, and serial numbers in accordance with the TDP.

6.2 Manufacturing Certification and Traceability

The Contractor shall submit a Certificate of Conformance certifying that the VLS MEB and HEB Driver and Interface CCAs meets the requirements of this contract. The Contractor shall retain and provide upon request inspection and test results associated with certifying the units in accordance with CDRL A007.

6.3 Substitution of Sources of Supply

The TDP contains source control or vendor item drawings that specify approved or suggested sources of supply. The Contractor shall submit all proposed changes to approve or suggested sources of supply as indicated in the source control or vendor item drawings to the Government for approval.

6.4 Configuration Status Accounting

The Contractor’s configuration status accounting shall be in accordance with ANSI/EIA-649, the Configuration Management Plan for the VLS, Volume 1, Equipment (Hardware) Configuration Management, TL130-AD-PLN-010-VLS, and the Configuration Management Plan for the VLS, Volume 3, Firmware Configuration Management, and TL130-AD-PLN-030-VLS.

7.0 GOVERNMENT TESTING, INSPECTION AND ACCEPTANCE

The Government shall perform all test requirements set forth in the Acceptance Test Requirements (ATR’s). The ATR drawings below establish the test requirements for acceptance of the MEB and HEB Driver and Interface CCAs.

I. Drawing No. 8660516 ATR for the MEB Interface CCA, P/N: 8660408 (for schematic see 8660410)

II. Drawing No. 8660517 ATR for the MEB Driver CCA, P/N: 8660412 (for schematic see 8660414)

III. Drawing No. 8660519 ATR for the HEB Interface CCA, P/N: 8660458 (for schematic see 8660460)

IV. Drawing No. 8660520 ATR for the HEB Driver CCA, P/N: 8660462 (for schematic see 8660464)

ATR Testing and inspection of the VLS MEB and HEB Driver and Interface CCAs shall be performed at a Government and/or Government contractor facility in accordance with the applicable drawings, standards and specifications and factory test and inspection plans. The Government shall prepare specific written inspection and test procedures for each inspection and test operation to be performed by the Government. These inspection and test procedures shall be reviewed by the quality assurance organization and maintained current in accordance with the change control system requirements. The inspection and test procedures shall clearly identify the item through part number with revision and nomenclature, and include detail instructions and/or operations to be performed.

The Government shall maintain records of inspection results and quantitative test data for each deliverable end item.

7.1 CCA Rework and Repairs

After delivery of the CCA, the Government shall conduct a series of PET and ATR tests and determine if the CCA’s require rework and/or repair. If at any point during testing the Government finds it necessary for CCA rework/repair, the Government shall notify and coordinate the delivery of the failed CCA’s to the Contractor for rework and/or repair.

All deficiencies discovered during ATR and PET testing shall be corrected at Contractor’s expense prior to unit delivery to the Government. Once the CCA rework and repair is completed, the Contractor shall deliver the CCAs to the Government for re-testing.

7.2 Conformal Coating

Prior to the final series of ATR and PET testing, the Government shall perform conformal coating of the MEB and HEB Driver and Interface CCA’s in accordance with the Quality Electrical Insulation Compounds, IPC-CC-830. After conformal coating of the CCA’s, the Government will conduct the final series of ATR and PET testing. If the CCA fails after conformal coating, CCA rework/repair will take place as specified in Section 7.1. If required, the Government will re-coat the CCA’s prior to final testing and acceptance.

7.3 Production Environmental Tests

The Government shall perform all required testing in accordance with the Production Environmental Test (PET) requirements for VLS, WS 20130. The purpose of PET is to provide a catalyst in surfacing manufacturing and assembly defects and weak or marginal parts/components within the units under test (UUT’s) prior to system integration.

8.0 GENERAL REQUIREMENTS

8.1 Risk Assessment and Management

The Contractor shall perform risk assessment and management. The Contractor shall use its own established Risk Management Program; however, the Risk Management Program shall at a minimum contain the following:

Risk management shall be a continuous process, analyzing program risks and individual mitigation plans on a sufficiently frequent basis to be proactive in preventing major Program problems. Major problems include, but are not limited to, not meeting delivery dates and nonconformance to specifications and drawings. The analysis shall identify the risks associated with each area, assess the probability of occurrence, identify the impact of each risk on the overall program, and develop and implement risk mitigation plans for identified risks. The risk analysis shall use metrics from the Contractor’s Risk Management Program.

8.2 Right of Access

The Government shall have right of access to all facilities in which storage of raw materials, purchased parts, either finished or unfinished, and finished equipment may be established. Right of access shall include all areas in which VLS MEB and HEB Driver and Interface CCAs are stored, manufactured, processed, aligned, assembled, and tested. Right of Access shall be interpreted to include access to records and documentation concerning the VLS MEB and HEB Driver and Interface CCAs. Access includes specifications, purchase orders and subcontract documentation, receiving, inspection and test records for such purchase parts. Right of access shall include access at all tiers to vendors, Subcontractors and suppliers in accordance with FAR 46.405 and FAR clauses 52.245-1(g) and FAR 52.246-1.

The Government may perform any necessary inspections, verifications and evaluations to ascertain conformance to requirements, and the adequacy of the implementing procedures.

9.0 QUALITY ASSURANCE

The Contractor's quality assurance program shall conform to the Contractor's Quality Assurance Program Plan and shall be in conformity with either ANSI/ASQC Q9001, or ISO 9001 for production. This applies to items manufactured or performed by the Contractor at the Contractor’s plant or all outsourced facilities. The Contractor shall flow down to the Subcontractors and vendors the quality requirements through subcontracts, purchase orders, or other contractual purchasing documentation by using ANSI/ASQC Q9001 as a guide. The quality requirements include ANSI/ASQC Q9001 or ISO 9001, and relevant SOW and TDP requirements. The Subcontractors and vendors shall provide Certificates of Conformance that the flowed down requirements are fulfilled.

10.0 MARKING FOR TECHNICAL DATA

The Contractor shall mark all technical data in accordance with MK 41 VLS Standing Instruction 94-1F, Attachment 6. This instruction is applicable to new documents, revised documents or documents from file in response to a request for copy.

11.0 ENVIRONMENTAL COMPLIANCE AND REGULATIONS

The Contractor shall comply, and ensure that all Subcontractors comply, with all applicable environmental federal, state, and local laws and regulations and Navy policies, instructions and ISO 14000 Environmental Management Systems Standards.

12.0 GOVERNMENT FURNISHED PROPERTY

12.1 Government Furnished Material

N/A

12.2 Government Furnished Equipment

N/A

12.3 Government Furnished Information

MEB and HEB Driver and Interface CCA:

TDP#: 8660408-9,

TDP#: 8660412-9,

TDP#: 8660458-9,

TDP#: 8660462-9.

13.0 DELIVERABLES

NUMBER
NAME
A001
QTY 455 MEB Interface CCAs
A002
QTY 455 MEB Driver CCAs
A003
QTY 62 HEB Interface CCAs
A004
QTY 62 HEB Driver CCAs
A005
Configuration Status Accounting Information
A006
As Built Configuration List
A007
Technical Report Study/Services

14.0 ACRONYM LIST

ACRONYM
DENOTATION
VLS
Vertical Launch System
MEB
Missile Electronics Box
HEB
Hazard Electronics Box
ATR
Acceptance Test Requirements
CCA
Circuit Card Assemblies
TDP
Technical Data Package

ADDITIONAL INFORMATION

A. PERIOD OF PERFORMANCE / REQUIRED DELIVERY DATES

24 weeks after date of award (DOA)

B. PLACE OF PERFORMANCE

TBD

C. SHIPPING ADDRESS

Naval Surface Warfare Center Build 519 1999 Fourth St Norco, CA 92860

D. INSPECTION AND ACCEPTANCE

E. TECHNICAL POINT OF CONTACT

NAVAL SURFACE WARFARE CENTER, CORONA DIVISION

CONTRACTS DEPARTMENT

1 | 11

12 | 11

14 | 11