SOW_B20_Phase_2_draft.pdf

PDF 92 KB Posted

Attached to
PHASE 2 MICROWAVE LINK RFQ Federal contract opportunity
Solicitation number
N64267-18-T-0023
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to PHASE 2 MICROWAVE LINK RFQ, newest first.
File Type Posted
RFQ_B20_PHASE_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 3/31/16

Statement of Work

Fallon B20 Phase 2 Microwave Link

1. INTRODUCTION

A no longer functioning microwave link between Building 465 at Naval Air Station (NAS) Fallon to Bombing range 20 (B20) requires replacing in order to complete a redundant communication ring supporting the critical data infrastructure.

2. BACKGROUND

NAS Fallon operates bombing ranges for training combat air crews before deployment aboard Carrier Battle Groups. B20 is one of the bombing ranges operated by the Air Station. On the Range are scoring systems, instrumentation, communications, both tactical and safety, security video feeds and much more. All of the range systems are feed back to the operations center via microwave back bone. The original link between Building 465 to B20 via Dessert Peak was backed up with one last year from New Pass Peak via White Mountain. The replacement relieved the failing link via Desert peak that is now inoperable and unrepairable. Replacing the inoperable link via Desert Peak with a new microwave link will allow the range to configure the network into a ring topology, creating not only the critical communication necessary between range operations and B20 but all the other nodes connected will have redundant paths thus increasing range safety and network reliability. Installation shall be handled by range personnel.

3. SCOPE

We are procuring the equipment with spares, Integration service, and Warranty.

4. APPLICABLE DOCUMENTS

NTIA Channel Plan Guide

5. REQUIREMENTS

5.0.1 Link requires an intermediate relay point, to be located at Desert Peak North. This site has shore power and can be accessed by road. A new 60 foot communications tower is available at B-20. An existing tower at Building 465 is available for the NAS Fallon endpoint.

5.0.2 A link with OC-3 capability is needed.

5.0.3 Reliability should result in average outage time of less than 15 minutes per year.

5.0.4 The playa surrounding B-20 is known to cause multipath fading, which should be mitigated in the design.

5.0.5 Frequencies are TBD and will be in the 7-8 GHz band.

5.0.6 Channels shall conform to the NTIA Channel Plan. 30MHz Channel bandwidth (OC- 3/155Mbps, 128QAM)

List of equipment:

Item Description Part number Units

ODU 600

ECLIPSE ODU 600, 07 GHz M-EEH-07 8

Outdoor mount: Eclipse Pole Mount, for Use with Single ODU 086-000000-101 2

Coupler Assy Eclipse, 7/8 GHz Equal 3 dB, V and H Polarization

(840ET07H1A) 086-523341-312 1

Coupler Assy Eclipse, 7/8 GHz Unequal 6 dB, V and H Polarization

(840ET07H1B) 086-523341-612 2

ECLIPSE FLEXIBLE WAVEGUIDE, 7.125 - 8.500 GHZ, 900MM,

PDR84-CPR112 (S112CHS3-A) 086-078112-900 2

INUe

ECLIPSE, INTELLIGENT NODE UNIT 2RU, INC IDCE, FAN, NCCV2,

HIGH OUTPUT EXX-000-204 4

Kit Bracket 2RU 179-530064-001 4

NODE PROTECTION CARD, HIGH OUTPUT EXS-002 4

RAC 60E, QPSK-256 QAM, High Gain, No XPIC, ACM & Sync-E EXR-660-002 8

Node SW License, 200 Mbps Total Radio Payload Capacity EZE-08004 4 Secure Management, INU, inc SNMPv3 EZF-03 4 Payload Encryption EZF-04 4 Radius Client, Centralized User Acct Mgmt EZF-06 4 ODU 600 Nodal High power option 2 x ODU EZF-52 4

STRONG SECURITY FIPS 140-2 COMPLIANT EZF-42 4

FIPS Accessory Kit 179-530153-001 4

DAC 1X1550, 1XSTM1/OC3, SM OPTICAL EXD-152-001 4

DAC 1X155O, 1XSTM1/OC3, MULTIMODE OPTICAL

EXD-157-001

AUX/ALARM Card AUX, Alarm I/O Card EXA-001 4

Cable, Alarm I/O HD15 TO wirewrap, 15M 037-579470-015 4 M66 Punch-Down Block Kit 179-530132-001 4

DAC-16

ECLIPSE, DAC 16XE1/DS1 V2, PROTECTABLE EXD-161-001 8

2x HDR-E50 TO Y JOIN TO 24AWG FREE END 15.5M (HDR-

E50MSG1-Y-15M) 037-579408-015 8

DAC GE3

DAC GE3 GIGABIT ETHERNET SWITCH CARD EXD-181-002 8

CABLE PROT / BRIDGEING GE3, DIRECT FIT, 1M 037-579461-001 4

SPLITTER MM LC-LC TO LC 10M 037-579486-010 8

GIG ETH SFP, OPT MMF 850nm LC 1000BASE-SX, <550M (LM28-

C3S-TC-N) 079-422662-001 8

ETHERNET CABLE, RJ45 CAT 5/CAT 5e, 2m (6.5') (037-579124-002V) 037-579124-002 1

ETHERNET CABLE,CAT5/CAT5E,RJ-45,5 M LONG (037-579125-

002V_REVA) 037-579125-002 2

Antenna

ECLIPSE DIRECT MOUNT ANT., 7.125-8.5 GHZ, 1.8 M, HPLP

(VHLP6-7W-SE1B) 086-073181-103 3

ANTENNA, 7.125-8.5GHZ, 2.4M/8FT, HP, SNGL POL, CPR112G, WHT

TEF RAD (HP8-71W-P3A) AND-HP8-71W-P3A 2

Additional SIDE STRUT KIT FOR 6FT MICROWAVE ANTENNAS; 10.5

FT (520570-10) AND-520570-10 3

OUTBOARD SIDE STRUT KIT FOR 8/10/12FT MICROWAVE

ANTENNAS (520570-4) AND-520570-4 2

Antenna Mount

KIT, UNIV PIPE MOUNT, 4 1/2" X 93", SUPPORTS UP TO 8" ANGLE

LEGS (PM-SC4-96) AND-PM-SC4-96 5

IF Cable

Kit, Lightning Arrestor, Universal, 50 Ohm, Female to Female (108-

1118B-B-KIT) 179-530062-001 8

Weatherproofing Kit (WK-CNT) (1 per run) 011-390001-001 8

Hoisting Grip: Valmont, Lmr400, 3/8" Flex, Rg11U Close (GRIP40-C) (1 per run) VLT-GRIP40-C (HG38-C) 8

Cable, IDU/ODU, No Conn, 50M, .4in Copper Clad Alum Type (CNT- 400-50M) (160 ft) 840-600311-050 4

Type N Male Crimp Connectors (400PNM-CS8) (2 for cable ends + 2 for lightning arrestor + 2 for spares) per run (6 per run) 840-600202-001 48

STANDARD GROUNDING KIT FOR EW240/380 AND COR COAX

CABLE 1/4" AND 3/8 (GKSUNV) (3 percoax run) AND-GK-SUNV 24

Wall Feedthrough for 1/2 up to 4 Entries (204673-4) AND-204673-4 4

RUBBER BOOT ASSEMBLY, KIT, 4 INCHES, BOOT WITH 4 HOLE 3/8

INCH HOLES INSERT (BA4000) 179-530160-004 4

MINIATURE CLICK-ON HANGER FOR 9-12 MM (BHD38) AND-BHD38 24

ADAPTER, ANGLE, SS, FOR MINI CLICK-ON HANGAERS (10/PK)

(294572) AND-294572 24

HARDWARE KIT FOR 1/2 IN OR 7/8 IN DOUBLE CLICK ON

HANGERS, INCL 3/8 IN BOLTS AND HARDWARE, 5.4 IN (243095-5) AND-243095-5 24

Services Integration Service, Field VAS-ODU000-003 8

WARRANTY, 24 MONTHS, ODU-600 SNA-BWXXA1002443 8

Spares (contract option) ECLIPSE ODU 600, 07 GHz M-EEH-07 4

ECLIPSE, NODE CONTROLLER CARD, SERIAL MGMT V2, HIGH

OUTPUT EXN-004 1

NODE PROTECTION CARD, HIGH OUTPUT EXS-002 1

RAC 60E, QPSK-256 QAM, High Gain, No XPIC, Acm & Sync-E EXR-660-002 1

SW License, DS-1, 6RAC 16X (Compact Flash Card) EZE-08001 1 INUe, 2RU Fan Card EXF-101 1

DAC 1X1550, 1XSTM1/OC3, SM OPTICAL EXD-152-001 1

ECLIPSE, DAC 16XE1/DS1 V2, PROTECTABLE EXD-161-001 1

DAC GE3 GIGABIT ETHERNET SWITCH CARD EXD-181-002 1

GIG ETH SFP, OPT MMF 850nm LC 1000BASE-SX, <550M (LM28-

C3S-TC-N) 079-422662-001 1

5.1 Production Support

N/A

5.2 Foreign Military Sales (FMS) Support

N/A

5.3 MILDEP Support

N/A

6. GOVERNMENT FURNISHED PROPERTY

The Government will make available the GFM, GFE, and GFI identified below for use by the contractor in the performance of this contract.

6.1 Government Furnished Material

N/A

6.2 Government Furnished Equipment

Existing Communications Racks shall be used

6.3 Government Furnished Information

N/A

7. DELIVERABLES

8. ACRONYM LIST

ACRONYM DENOTATION

NTIA National Telecommunication & Information Administration

NAS Naval Air Station

TBD To Be Determined

A. PERIOD OF PERFORMANCE / REQUIRED DELIVERY DATES

B. PLACE OF PERFORMANCE

N/A

C. SHIPPING ADDRESS

Fallon, NV 89406

D. INSPECTION AND ACCEPTANCE

1. INTRODUCTION
2. BACKGROUND
3. SCOPE
4. APPLICABLE DOCUMENTS
5. REQUIREMENTS
6. GOVERNMENT FURNISHED PROPERTY
7. DELIVERABLES
8. ACRONYM LIST

File details come from the government source that posted it.