Questions_and_Answers_2.pdf

PDF 155 KB Posted

Attached to
Video Display System Federal contract opportunity
Solicitation number
N64267-16-T-0246
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Video Display System, newest first.
File Type Posted
N64267-16-T-0246_Amendment.pdf PDF
Questions_and_Answers.pdf PDF
Additional__Drawings.pdf PDF
N64267-16-T-0246.pdf PDF
Exhibit_1_-_Overview_Diagram.pdf PDF
Exhibit_2_-_Display_LED_Tiles_Layout.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N64267-16-T-0246 Questions and Answers # 2

Question # 1 - Is there a pixel pitch requirement for the LED tiles?

Answer # 1 – 3.9mm minimum

Question # 2 - Is TAA (Trade Agreement Act) compliance required for the LED tiles?

Answer # 2 – Please see solicitation.

Questions # 3 - Please confirm that CLIN 0002- (Hanging Brackets) is the necessary mount required for the entire LED Video Display Wall System.

Answer # 3 – Due to the existing infrastructure configuration, the tiles shall be mounted from a government provided beam that will be attached to existing infrastructure. The tiles shall hang from one another starting from this beam.

Questions # 4 – Please confirm that there is no labor required for CLIN 0001, 0002, and 0003 and that this solicitation if for hardware only.

Answer # 4 – Section C, 4.0 Additional Information states “This requirement is only for the LED

Display(s), there is no installation service attributed to this.

Questions # 5 - Please confirm that there is no on-site support required by the awarded vendor?

Answer # 5 – See Question # 4

Question # 6 - Delivery date as outlined on the RFP documents is 30 days ADC. Depending on the LED tile that is chosen a longer delivery date may be required. Please confirm if this is acceptable.

Answer # 6 – Solicitation has been updated to incorporate 70 Days after award.

Question # 7 - Regarding the above listed RFQ at the Naval Surface Warfare Center, I noted that there is no installation included. Due to the technical nature of this project, a certified, qualified installation should be part of this package to ensure proper installation and to verify eligibility for warranty protection. Do you have in house certified installers for this project?

Answer # 7 - No on-site support required. No warranty beyond manufacturer-provided warranty is required on this solicitation.