E003_PA44_PETRA_PRE_PRODUCTION_UNIT_AND_TEST.pdf
PDF 280 KB Posted
- Attached to
- PRE-EXIT TELEMETRY AMPLIFIER Federal contract opportunity
- Solicitation number
- N64267-16-T-0036
About this file
E003/DI-MNTY-80173
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| T001_PETRA_PRE_PRODUCTION_PRODUCTION_TECHNICAL_MANUAL.pdf | ||
| E001_PA44_PETRA_Design_Review.pdf | ||
| E002_PA44_PETRA_PROGRESS_STATUS_REPORT.pdf | ||
| N64267-16-T-0036.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/4/201412
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER MNTY
D. SYSTEM / ITEM
PETRA
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
E003
2. TITLE OF DATA ITEM
PRODUCTION TEST PLAN
3. SUBTITLE
PRE-PRODUCTION UNIT AND TEST
4. AUTHORITY (Data Acquisition Document No.)
DI-MNTY-80173
5. CONTRACT REFERENCE
SOW Section 3.0
6. REQUIRING OFFICER
NSWC Corona, PA44
7. DD 250 REQ.
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT ONE/R SEE BLK 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A N/A SEE BLK 16 Reg Repr o
16. REMARKS
Blk 9 - Use the following: "DISTRIBUTION STATEMENT C.
Distribution authorized to U.S. Government agencies and their contractors only.
(Reason: Administrative Use). (Date: 6/15/2015). Other requests for this document shall be referred to Marine Corps Systems Command."
Blk 10, 12, 13 – THE DRAFT PRE-PRODUCTION UNIT AND TEST PLAN
SHALL BE SUBMITTED NO LATER THAN 120 DAYS AFTER EFFECTIVE
DATE OF ORDER. THE GOVERNMENT HAS 30 DAYS TO REVIEW AND
APPROVE/DISAPPROVE THE PLAN AND RETURN TO THE CONTRACTOR
FOR REVISION. THE CONTRACTOR HAS 30 DAYS TO RESUBMIT WITH
REQUIRED CHANGES.
Blk 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT
PA44 Tech
POC
1 1
15. TOTAL 1 1
G. PREPARED BY
//S//William Debbanah
H. DATE
I. APPROVED BY
Kimberly Brayton, PA02
J. DATE
01/11/2016
DD Form 1423–1, FEB 2001 Previous editions are obsolete Page __1__ of __1__ Pages
Source: https://assist.dla.mil -- Downloaded: 2015-12-21T17:23Z Check the source to verify that this is the current version before use.
Source: https://assist.dla.mil -- Downloaded: 2015-12-21T17:23Z Check the source to verify that this is the current version before use.
File details come from the government source that posted it. Updated .