QUALITY_ASSURANCE_SURVEILLANCE_PLAN.pdf
PDF 159 KB Posted
- Attached to
- Threat Assessment Interview Training Federal contract opportunity
- Solicitation number
- N6328518T0912
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6328518T0912.pdf | ||
| PWS_TMT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of administrative and Program Management Support Services in support of the Naval Criminal Investigative
Service (NCIS) Acquisition and Logistics Department and Insider Threat Division is the timely, accurate and thorough completion of all contract requirements.
2. Performance Standards:
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) for the required content, quality, timeliness, and accuracy.
c . Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.
4. Performance Measurement: Performance will be measured in accordance with the following table:
Performance
Element
Performance
Requirement
Surveillance
Method Frequency
Acceptable
Quality Level
Contract Deliverables
Contract deliverables furnished as prescribed in the PWS, Inspection by the COR 100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s
Annual
All performance elements rated
Satisfactory (or higher) annual report on Contractor Performance annual report on Contractor Performance
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice Annual 100% accuracy
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report).
The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/order may result in the non exercise of the option period(s).
For each item that does not meet acceptable levels, the Government may issue a Contract
Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the
Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
File details come from the government source that posted it.