About this file

Amendment 0002 Please acknowledge solicitation N62645-15-R-1008 and all amendments along with your response.

View the file

Other files for this federal contract opportunity

Other files attached to Optical Fabrication Assembly Line, newest first.
File Type Posted
Amendment_0001.pdf PDF
N62645-15-R-1008.pdf PDF
Attachment_I_-_New_System_Layout.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264515RCP3501

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to update the Statement of Requirements, specif ically w ithin System Requirements 2nd bullet and Other

System Requirements 7th bullet and to correct grammar mistakes w ithin the questions and answ ers.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62645-15-R-1008

X 9B. DATED (SEE ITEM 11)

05-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2015

CODE

NAVAL MEDICAL LOGISTICS COMMAND

693 NEIMAN STREET

FORT DETRICK MD 21702-9239

N62645 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N62645-15-R-1008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

QUESTIONS & ANSWERS

Questions Answers

Can you confirm the term "turn-key solution" pertains to all equipment supplied under the solicitation?

Turn-key solution including facility modification no longer required Updated in Statement of

Requirements under System Requirements, 2 nd

Bullet.

A) If this is a "turn-key solution" when will the facility be available to contractors to determine work required in order to provide a comprehensive offer?

B) Also is it a requirement that subcontractors selected by the vendor be registered on an approved list for this facility or other government entities?

A) Updated in Statement of Requirements under

System Requirements, 2 nd

Bullet. Turn-key solution including facility modification no longer required.

B) Subcontractor personnel working for the prime contract holder will individually have to pass required clearance procedures to be granted access to the base and work site facility.

Who determines facility modifications and are any specific modifications anticipated?

Turn-key solution including facility modification no longer required. Updated in Statement of

Requirements under System Requirements, 2 nd

Bullet

Is the vendor responsible for all equipment removal, repositioning and locating?

Yes. Updated in Statement of Requirements under

System Requirements, 2nd Bullet

Solicitation notes "acceptance of offers" is 120 days after closing. Would this be possibly sooner since "delivery required" notes September 30, 2015?

This acceptance of offers for a period of 120 days is the time period for your proposal to be considered valid.

What is the nominal height of the blocking station tables?

Needed to ensure proper conveyor height.

Conveyor height shall be 3’7” from floor to top of belt. 3’9” height with framework. Updated in

Other System Requirements.

Can you confirm the conveyor height at the tool washer on your layout for Nostra?

Tool washer height is 3’ 2” from floor to conveyor belt on the unit. A height adjustment shall be required to reach the height of the conveyor system.

Proposed layout shows airline running perpendicular on one generator as opposed to remaining 4 generators. What's the purpose of this air line?

Disregard perpendicular airline. This airline previously supplied the lens taping machines.

Access to tool tower control panel will be blocked by proposed conveyor for blockers. Is lift gate acceptable at this point to access control panel?

Access to tool tower control panel available through tower door clearance area. Lift gates are not a requirement.

Proposed layout shows shaded gray area (29' x 3') left of tool towers. Is this area used to access tool towers for maintenance or some other purpose?

Yes, this area reflects the required space for the tower doors to open fully. Also, allows access to control panel.

Proposed layout shows "stack" at the end of the conveyor line to Toro-X-2S polishers. Are "Stackers" (automated stacking of up to 50 job trays) requested here to reduce/eliminate the

Yes, stackers or some type of “queue” required to allow a parking area for trays prior to polishing. A larger que shall be required for the output that need of operators constantly monitoring or moving job trays for work being delivered to polishers?

feeds two polish lines.

Can arrows be provided for the workflow of the conveyer belts?

Yes, see attachment.

How does the equipment get from the stage to the blockers per the proposed layout?

Small carts. Normally 3 stations active at on time.

STATEMENT OF REQUIREMENTS

SYSTEM REQUIREMENTS

The Naval Ophthalmic Support and Training Activity (NOSTRA) has a requirement for an automated optical lens fabrication system. The system shall include the following subsystems: Surface Layout Blocking System, Lens

Generating Sytem, and Microseparator Coolant System. The system shall include an automated conveyor system that connects all of the specified subsystems.

The system shall be capable of providing a throughput of at least 175 trays (350 lenses) per hour for a 7 hour shift. The system throughput shall represent 175 trays initiated and completed per hour. The system shall allow for a workflow queue of at least 263 trays to prevent bottlenecking.

Installation shall include removal and repositioning of currently installed equipment.

The system shall fit in a 53’ x 40’ floor space and allow for tray flow and parts return functions. Room diagram for the “New System Layout” is provided in Attachment I.

System shall include all manufacturer warranties (up to one (1) year) and operator manuals. On-site operator and maintenance training shall be provided on all equipment. In addition, manufacturer shall guarantee spare parts availability.

SURFACE LAYOUT BLOCKING SYSTEM

The system shall include at least six (6) lens blocking units, to be located at the beginning of the assembly line.

The units shall be capable of utilizing alloy components to adhere a lens to a block.

The units shall be capable of processing two lenses concurrently for left and right lenses.

The units shall be capable of blocking all plastic and mineral lens materials, including but not limited to polycarbonate and high index materials.

The units shall be able to accommodate lens diameters up to at least 85mm. The units shall utilize multiple blocking rings to accommodate for variation in lens thickness; the units shall be able to automatically recognize the size of the blocking ring and notify the operator of any errors.

The units shall be capable of automatically adjusting prism angle, prism basis, and blocking chuck axis.

The units shall be capable of automatically verifying lens position.

The units shall be able to perform prismatic blocking.

The units shall be able to utilize high melting point lead and cadmium free alloys.

The units shall include software with an Optical Manufacturing Association (OMA) compliant interface.

The units shall include a barcode scanner to import lens data.

LENS GENERATING SYSTEM

The system shall include five (5) fully automated CNC (Computer Numerical Controlled) lens generator units. The system shall be able to automatically load lenses from trays from the conveyor system and return completed lenses to tray on conveyor system.

The units shall include software with an Optical Manufacturing Association (OMA) compliant interface.

The units shall be able to process all lens formats and materials, including but not limited to, CR-39, Hi-index, and polycarbonate.

The units shall be able to process lens blanks up to 85 mm diameter.

The units shall be able to generate concave curvatures up to 14.5 diopters and convex curvatures up to -

30.0 diopters.

The units shall be able to auto-calibrate.

The units shall be able to perform high speed cribbing and milling required for specification accuracy and smooth surface after cut.

The units shall produce generated lenses that are immediately ready for polishing.

The units shall allow user access to clean and maintain the equipment.

The units shall be able to automatically remove and dispose of any swarf material from the generator.

The units shall include a temperature monitor.

The units shall include a user interface that will allow the user to manually enter, monitor, or modify information.

MICROSEPARATOR COOLANT SYSTEM

This requirement shall include a microseparator coolant system. The system shall be able to manage fluid and debris waste from the lens generators.

The system shall be able to accommodate digital, conventional or mixed production fabrication and all organic material processing.

The system shall include chip compacting and bulk chip separation capabilities. The chip compactor assembly must separate, compact and dewater bulk chips and reduce waste volume.

The system shall be able to process materials remotely from the generators, if necessary due to layout of the entire production system.

The system shall include an automatic water makeup subsystem and an automatic coolant metering subsystem.

The system shall allow for easy recovery of de-blocked lens without interfering with production.

The system shall include debris containers for handling chip and debris waste.

OTHER SYSTEM REQUIREMENTS

The conveyor system shall allow for clear walkways around the configuration without gates. The walkways shall provide access to all pieces of equipment.

The system shall be designed to withstand exposure to water and polish residue.

The conveyor system shall allow for a lag time of 10 minutes between the blocking units and the lens generating units to allow for alloy curing.

Conveyor height shall be 3’7” from floor to top of belt. 3’9” height with framework.

The layout of the system shall account for the installed base on equipment that will be remaining at the site.

All of the following equipment, except for the automated Dynamic Tower System, may be relocated, if necessary. This equipment includes:

o 2 Semi-automatic lens tapers (Practical Systems Inc.)

o 1 Alloy reclaim tank (Satisloh) o 1 Ultrasonic cleaning and drying unit (Branson Omni 2000) o 1 SGX tabletop foam tool generator (Gerber-Coburn) o 5 Automated Dynamic Tower System (P@P Picking Systems) o 15 Toro X-2S Polishers (Satisloh)

The conveyor system shall integrate with the installed base of automated Dynamic Tower System (Model

USA-003A) by P@P Picking Systems. The Dynamic Tower System shall be included in the production line process after the blocking units and the generating units. The conveyor system shall receive optical tool(s) from the tool towers based on the specifications assigned to the job and place the tool(s) on the tray with the assigned lens(es). The conveyor system shall include a return track that will return the tool(s) to the tool towers after completion of the job. The Dynamic Tower Systems are fixed and shall not be relocated.

The conveyor system shall output the trays at the location of the lens polishers. The end of the conveyor system shall allow for appropriate storage and manual distribution of trays to the polishers. A larger output of trays shall be distributed to the area assigned to multiple rows of polishers.

The return track shall integrate with the installed Satisloh ALO 2.0 tool washing unit. The tool washing unit has an independent automatic conveyor loader belt. The return track shall include a tool drying capability that will air dry the washed tools prior to return to the tool tower.

The conveyor system shall include an additional output lane to deliver trays that require an additional/alternative process (i.e. foam-tool generator). This capability shall be initiated via sensor detection and gates.

The conveyor system shall have Emergency stop system in accordance with OSHA standards.

ENHANCING FACTORS

Installation of the complete system should be completed within a fourteen (14) day time period.

The blocking and generating units should be able to utilize or be adapted to utilize 43 mm V-style chuck blocks.

(End of Summary of Changes)