Moog_FOD_Radar_Site_Specs_pgs_201-300.pdf
PDF 258 KB Posted
- Attached to
- FOD RADAR TOWER MCAS YUMA Federal contract opportunity
- Solicitation number
- N6247319R0817
About this file
Specs 2
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 78 23 Page 28
c. Location of training
d. Dates of training
e. Objectives
f. Outline of the information to be presented and subjects covered including description
g. Start and finish times and duration of training on each subject
h. Methods (e.g. classroom lecture, video, site walk-through, actual operational demonstrations, written handouts)
i. Instructor names and instructor qualifications for each subject
j. List of texts and other materials to be furnished by the Contractor that are required to support training
k. Description of proposed software to be used for video recording of training sessions.
3.1.2 Training Content
The core of this training must be based on manufacturer's recommendations and the operation and maintenance information. The QC/CxA is responsible for overseeing and approving the content and adequacy of the training.
Provide a brief summary of the FACILITY INFORMATION manual, and a more detailed presentation of the PRODUCT AND DRAWING MANUAL. Spend 95 percent of the instruction time during the presentation on the OPERATION AND MAINTENANCE DATA. Include the following for each system training presentation:
a. Start-up, normal operation, shutdown, unoccupied operation, seasonal changeover, manual operation, controls set-up and programming, troubleshooting, and alarms.
b. Relevant health and safety issues.
c. Discussion of how the feature or system is environmentally responsive.
Advise adjustments and optimizing methods for energy conservation.
d. Design intent.
e. Use of O&M Manual Files.
f. Review of control drawings and schematics.
g. Interactions with other systems.
h. Special maintenance and replacement sources.
i. Tenant interaction issues.
3.1.3 Training Outline
Provide the Operation and Maintenance Manual Files (Bookmarked PDF) and a written course outline listing the major and minor topics to be discussed
SECTION 01 78 23 Page 29 by the instructor on each day of the course to each trainee in the course.
Provide the course outline 14 calendar days prior to the training.
3.1.4 Training Video Recording
Record classroom training session(s) on video. Provide to the Contracting Officer two copies of the training session(s) in DVD video recording format. Capture within the recording, in video and audio, the instructors' training presentations including question and answer periods with the attendees. The recording camera(s) must be attended by a person during the recording sessions to assure proper size of exhibits and projections during the recording are visible and readable when viewed as training.
3.1.5 Unresolved Questions from Attendees
If, at the end of the training course, there are questions from attendees that remain unresolved, the instructor must send the answers, in writing, to the Contracting Officer for transmittal to the attendees, and the training video must be modified to include the appropriate clarifications.
3.1.6 Validation of Training Completion
Ensure that each attendee at each training session signs a class roster daily to confirm Government participation in the training. At the completion of training, submit a signed validation letter that includes a sample record of training for reporting what systems were included in the training, who provided the training, when and where the training was performed, and copies of the signed class rosters. Provide two copies of the validation to the Contracting Officer, and one copy to the Operation and Maintenance Manual Preparer for inclusion into the Manual's documentation.
3.1.7 Quality Control Coordination
Coordinate this training with the QC/CxA in accordance with Section 01 45 00.00 10 QUALITY CONTROL, Section 01 45 00.00 20 QUALITY CONTROL, Section 01 45 00.00 40 QUALITY CONTROL, Section 01 45 00.05 20 DESIGN AND
CONSTRUCTION QUALITY CONTROL FOR DESIGN-BUILD.
-- End of Section --
SECTION 01 78 24.00 20 Page 1
SECTION 01 78 24.00 20
FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) 02/15
01/09/2018
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. DEPARTMENT OF DEFENSE (DOD)
FC 1-300-09N (2014; with Change 2) Navy and Marine Corps Design Procedures
1.2 DEFINITIONS AND ABBREVIATIONS
1.2.1 eOMSI Manual
Manual (PDF file) provided by the Contractor that includes, but is not limited to, product information, a facility description with photos, and a list of primary facility systems.
1.2.2 eOMSI Facility Data Workbook (FDW)
A Microsoft Excel file containing required facility information populated by the Contractor.
1.2.3 Systems
The words "system", "systems", and "equipment", when used in this document refer to as-built systems and equipment.
1.2.4 Computer Assisted Design and Drafting (CADD)
Electronic Computer Assisted Design and Drafting graphic software program that is used to create facility design contract documents and Record Drawings.
1.2.5 KTR
An abbreviation for "Contractor."
1.3 EOMSI MEETINGS
1.3.1 Pre-Construction Meeting
Be prepared to discuss the following during this meeting:
a. eOMSI Manual and eOMSI Facility Data Workbook Development Meetings
b. Processes and methods of gathering eOMSI Manual and eOMSI Facility Data Workbook information during construction.
SECTION 01 78 24.00 20 Page 2
c. The eOMSI Submittals schedule. Include the eOMSI submittal schedule on the Baseline Construction Schedule in accordance with Section
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULE (NAS).
d. Electronic eOMSI Facility Data Workbook file for Contractor's use and completion.
1.3.2 eOMSI Manual and Facility Data Workbook Coordination Meeting
Facilitate a meeting after the Pre-Construction Meeting prior to the submission of the eOMSI Progress Submittal. Meeting attendance must include the Contractor's eOMSI Manual and Facility Data Workbook Preparer, Designer of Record (DOR), and Quality Control Manager, the Commissioning Authority (CxA), and the Government's Design Manager (DM), Contracting Officer's Representative, and NAVFAC Public Works (PW) Facilities Management Division (FMD). Include any Mechanical, Electrical, and Fire Protection Sub-Contractors.
The purpose of this meeting is to reach a mutual understanding of the scope of work concerning the contract requirements for eOMSI and coordinate the efforts necessary by both the Government and Contractor to ensure an accurate collection, preparation and timely Government review of eOMSI.
1.3.3 Facility Turnover Meeting
Include eOMSI in NAVFAC Red Zone (NRZ) facility turnover meetings as specified in Section 01 30 00, ADMINISTRATIVE REQUIREMENTS.
1.4 SUBMITTAL SCHEDULING
1.4.1 eOMSI, Progress Submittal
Submit the Progress submittal when construction is approximately 50 percent complete, to the Contracting Officer for approval. Provide eOMSI Manual Files (Bookmarked PDF) and eOMSI Facility Data Workbook (Excel). Include the elements and portions of system construction completed up to this point.
The purpose of this submittal is to verify progress is in accordance with contract requirements as discussed during the eOMSI Coordination Meeting.
Field verify a portion of the eOMSI information in accordance with paragraph FIELD VERIFICATION.
1.4.2 eOMSI, Prefinal Submittal
Submit the 100 percent submittal of the eOMSI Prefinal Submittal to the Contracting Officer for approval within 90 calendar days of the Beneficial Occupancy Date (BOD). This submittal must provide a complete, working document that can be used to operate and maintain the facility. Any portion of the submittal that is incomplete or inaccurate requires the entire submittal to be returned for correction. Any discrepancies discovered during the Government's review of eOMSI Progress submittal must be corrected prior to the Prefinal submission.
The eOMSI Prefinal Submittal must include eOMSI Manual Files (Bookmarked PDF) and eOMSI Facility Data Workbook (Excel).
1.4.3 eOMSI, Final Submittal
Submit completed eOMSI Manual Files (Bookmarked PDF) and eOMSI Facility
SECTION 01 78 24.00 20 Page 3
Data Workbook (Excel). The Final submittal is due at BOD. Any discrepancies discovered during the Government's review of the Prefinal eOMSI submittal, including the Field Verification, must be corrected prior to the Final eOMSI submission.
1.5 UNITS OF MEASURE
Provide eOMSI utilizing the units of measure used in the Government generated contract documents.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-11 Closeout Submittals eOMSI, Progress Submittal; G eOMSI, Prefinal Submittal; G eOMSI, Final Submittal; G
PART 2 PRODUCTS
2.1 eOMSI FILES FORMAT
Format eOMSI manuals and files in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Include a complete electronically linked operation and maintenance directory. Provide four electronic copies of the eOMSI Manuals to the Contracting Officer for approval.
Provide eOMSI Facility Data Workbook on compact disks (CD) or data digital versatile disk (DVD) disks in (EXCEL) format. Scan eOMSI Manual Files and eOMSI Facility Data Workbook for viruses, malware, and spyware using a commercially available scanning program that is routinely updated to identify and remove current virus threats.
2.1.1 eOMSI Manual Organization
Organize the eOMSI Manuals into two parts: 1) Product and Drawing Information, and 2) Facility Information. Bookmark the PDF files for easy access to the information.
a. Bookmark Product and Drawing Information documents in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.
b. Bookmark Facility Information to at least one level lower than the major system.
2.1.2 eOMSI Manual CD or DVD Disk Label and Disk Holder or Case
Provide disks in accordance with Section 01 78 23 OPERATION AND MAINTENANCE
DATA.
SECTION 01 78 24.00 20 Page 4
2.2 eOMSI MANUAL
2.2.1 Product and Drawing Information
Provide an organized record of the facility products, materials, equipment, and minimum information necessary to operate the facility. Provide Product and Drawing Information for the systems in the final constructed facility.
2.2.1.1 O&M Data
As a minimum, provide the approved O&M Data, submitted in the technical specification sections, in accordance with paragraph TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES in Section 01 78 23 OPERATION AND MAINTENANCE
DATA.
2.2.1.2 Record Drawings
Provide an electronic, PDF copy of the Record Drawings, prepared in accordance with FC 1-300-09N and 01 78 00 CLOSEOUT SUBMITTALS. Bookmark drawings using the sheet title and sheet number.
Include Record Drawings as part of the Red-Zone specified in Section
01 30 00 ADMINISTRATIVE REQUIREMENTS.
2.2.1.3 Utility Record Drawings
Using Record Source Drawings, show and document details of the actual installation of the utility systems; annotate and highlight the eOMSI information. Provide Utility Record Drawings in PDF format. Provide the following drawings at a large enough scale to differentiate designated isolation units from surrounding valves and switches.
a. Utility Schematic Diagrams - Provide a one-line schematic diagram for each utility system such as power, water, wastewater, and gas/fuel.
Schematic diagram must show from the point where the utility line is connected to the mainline up to the five-foot connection point to the facility. Indicate location or area designation for route of transmission or distribution lines; locations of duct banks, manholes/ handholes or poles; isolation units such as valves and switches; and utility facilities such as pump stations, lift stations, and substations.
b. Enlarged Connection and Cutoff Plans - Provide enlarged floor plans that provide information between the five-foot utility connection point and where utilities connect to facility distribution. Enlarge floor plans/ elevations of the rooms where the utility enters the building and indicate on these plans locations of the main interior and exterior connection and cutoff points for the utilities. Also enlarge floor plans / elevations of the rooms where equipment is located. Include enough information to enable someone unfamiliar with the facility to locate the connection and cutoff points. Indicate designations such as room number, panel number, circuit breaker, or valve number, of each utility and equipment connection and cutoff point, and what that connection and cutoff point controls.
2.2.2 Facility Information
Provide the following in Facility Information:
SECTION 01 78 24.00 20 Page 5
2.2.2.1 General Facility and System Description
Describe the function of the facility. Detail the overall dimensions of the facility, number of floors, foundation type, expected number of occupants, and facility Category Code. List and generally describe all the facility systems and any special building features (for example, HVAC Controls, Sprinkler Systems, Cranes, Elevators, and Generators). Include photographs marked up and labeled to show key operating components and the overall facility appearance.
2.2.2.2 Basis of Design
Include the Basis of Design that shows the basic design scope of work, assumptions and the original intentions of the Designer of Record (DOR).
Identify the site utility design goals, objectives, design load limits, assumptions, and system features that are critical to the operation and maintenance of the systems.
2.2.2.3 Floor Plans
Provide uncluttered, legible 11 by 17 inches floor plans. Include room numbers, type or function of spaces, and overall facility dimensions on the floor plans. Do not include items such as construction instructions, references, or frame numbers.
2.2.2.4 HVAC Filters
Provide a table that lists the quantity, type, size, and location of each HVAC filter, manufacturer's product name, and identifying number.
2.2.2.5 Equipment Listing
Provide a table that lists the major equipment shown on the design equipment schedules. Show the item descriptions, locations, model numbers;
and the names, addresses, and telephone numbers of the manufacturers, suppliers, contractors, and subcontractors.
2.2.2.6 System Flow Diagrams
Provide a flow diagram indicating system liquid, air or gas flow during normal operations. Integrate the system components into the diagram. A compilation of non-integrated, flow diagrams for the individual system components are not acceptable.
2.2.2.7 Valve List
Provide a list of all valves associated with the system. Show valve type, identification number, function, location and normal operating position.
2.2.2.8 Riser Diagrams
Provide riser diagrams and settings of equipment.
2.3 eOMSI FACILITY DATA WORKBOOK
An initial, pre-edited draft of the Model & Facility Data Matrix tab within the eOMSI Facility Data Workbook is attached to this section. The Government will provide this eOMSI Facility Data Workbook electronically to the Contractor upon award. Add, delete, and update Mastersystems, Systems, and Subsystems that may have changed during construction, or any items that may have been omitted or missed during design, at no additional cost to the
SECTION 01 78 24.00 20 Page 6
Government. Complete the KTR Facility Data File tab based on the selection of Mastersystems, Systems, and Subsystems installed. Download the eOMSI Facility Data Workbook at the following location:
http://www.wbdg.org/FFC/NAVGRAPH/graphtoc.pdf. Complete the KTR Facility Data File tab based on the selection of Mastersystems, Systems, and Subsystems installed. The following tabs are included in the eOMSI Facility Data File Workbook and serve the purpose stated:
a. Instructions Tab: Instructions for completing Model & Facility Data Matrix Tab and KTR Facility Data File Tab. If a discrepancy exists between what is required in this section and the Workbook, the instructions within the workbook take precedence.
b. Model & Facility Data Matrix Tab: - The Matrix lists Required Facility Asset Fields for each SYSTEM and SUBSYSTEM. The Designer of Record selects SYSTEMS and SUBSYSTEMS that are within the project scope, which the Contractor needs to include and populate in KTR Facility Data File tab. The "Required Facility Asset Field Position Numbers," one through seventeen, are pre-populated, and are not editable.
c. Required Facility Asset Fields Tab: Defines the 17 Required Facility Asset Field Position Numbers used in Model and Facility Data Matrix and KTR Facility Data File tabs.
d. KTR Sample Facility Data File Tab: Sample KTR eOMSI facility data file. This tab provides an example of the mandatory fields of equipment installed by the Contractor, and populated in the KTR eOMSI Facility Data File Tab, along with their descriptions.
e. KTR Facility Data File Tab: Required eOMSI facility data file deliverable provided to the Government. Provide a separate and unique new row for each facility component or piece of equipment installed.
PART 3 EXECUTION
3.1 FIELD VERIFICATION
Field verify eOMSI Facility Data Workbook information with Contractor and Government personnel. Include the following personnel in this meeting:
Contractor's eOMSI Manual and Facility Data Workbook Preparer and Quality Control Manager, Commissioning Authority, and the Government's Contracting Officer's Representative and NAVFAC PW FMD. Request, and provide, an eOMSI Field Verification Meeting no sooner than 14 calendar days after submission of the Progress eOMSI submittal, and another, no sooner than 14 calendar days after submission of the Prefinal eOMSI submittal. During this meeting, the Government and Contractor will verify that the eOMSI Facility Data Workbook is complete and accurate.
Field verify that at least 5 Subsystems under each of the Mastersystems are accurate, for a total of 25 Subsystems. For each of these items, verify that the required facility asset field, as defined in the "Model & Facility Data Matrix" tab, contains the specified data and it is accurate (i.e. item description, manufacturer, model no., serial no.). 100 percent accuracy of eOMSI information is required for successful field verification. If data discrepancies are discovered amongst the 25 Subsystems verified, resubmit an updated eOMSI FDW, and request a make-up field verification meeting. At the make-up field verification meeting 25 new Subsystems and their associated required facility asset fields will be field verified; the 25 new Subsystems must be 100% accurate. Any discrepancies discovered must be corrected prior to next eOMSI Facility Data Workbook Submittal.
SECTION 01 78 24.00 20 Page 7
(1) D10 - CONVEYING
(2) D20 - PLUMBING
(3) D30 - HVAC
(4) D40 - FIRE PROTECTION
(5) D50 - ELECTRICAL
3.2 eOMSI TRAINING
Provide training on eOMSI Manuals and Facility Data Workbook in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.
-- End of Section -
SECTION 03 30 00 Page 1
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
05/14
02/07/2018
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 211.2 (1998; R 2004) Standard Practice for Selecting Proportions for Structural Lightweight Concrete
ACI 213R (2014) Guide for Structural Lightweight-Aggregate Concrete
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304.2R (1996; R 2008) Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016) Building Code Requirements
SECTION 03 30 00 Page 2 for Structural Concrete and Commentary
ACI 347 (2004; Errata 2008; Errata 2012) Guide to Formwork for Concrete
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
ACI SP-66 (2004) ACI Detailing Manual
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1064/A1064M (2016b) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A996/A996M (2016) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1077 (2016) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
SECTION 03 30 00 Page 3
ASTM C1107/C1107M (2014a) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C138/C138M (2016a) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2016; E 2016) Standard Specification for Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C172/C172M (2014a) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C192/C192M (2016a) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete
ASTM C31/C31M (2015a; E 2016) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2016) Standard Specification for Concrete Aggregates
ASTM C330/C330M (2014) Standard Specification for Lightweight Aggregates for Structural Concrete
ASTM C39/C39M (2016b) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2013) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C494/C494M (2016) Standard Specification for Chemical Admixtures for Concrete
SECTION 03 30 00 Page 4
ASTM C567/C567M (2014) Determining Density of Structural Lightweight Concrete
ASTM C78/C78M (2016) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
ASTM C94/C94M (2016a) Standard Specification for Ready-Mixed Concrete
ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
ASTM D2628 (1991; R 2011) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D2835 (1989; R 2012) Lubricant for Installation of Preformed Compression Seals in Concrete Pavements
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM E1155 (2014) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E329 (2014a) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2000) Principles and Criteria for Forest Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
SECTION 03 30 00 Page 5
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 DEFINITIONS
a. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
b. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
c. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
d. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement. In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.
e. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
f. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
g. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Concrete Curing Plan Quality Control Plan; G Quality Control Personnel Certifications; G Quality Control Organizational Chart Laboratory Accreditation; G
SECTION 03 30 00 Page 6
SD-02 Shop Drawings
Reinforcing Steel; G
SD-03 Product Data
Joint Sealants Joint Filler Materials for Forms Cementitious Materials Concrete Curing Materials Reinforcement Liquid Chemical Floor Hardener Admixtures Mechanical Reinforcing Bar Connectors Local/Regional Materials; (LEED NC) Biodegradable Form Release Agent
SD-04 Samples
Slab Finish Sample Surface Finish Sample
SD-06 Test Reports
Tolerance Report Compressive Strength Tests; G Unit Weight of Structural Concrete Slump Tests Water
SD-07 Certificates
Reinforcing Bars Welder Qualifications VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers Material Safety Data Sheets Forest Stewardship Council (FSC) Certification Field Testing Technician and Testing Agency
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardener Curing Compound
1.4 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.5 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with
SECTION 03 30 00 Page 7 materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.5.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.6 QUALITY ASSURANCE
1.6.1 Shop Drawings
1.6.1.1 Reinforcing Steel
ACI SP-66. Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.
1.6.2 Control Submittals
1.6.2.1 Concrete Curing Plan
Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1.
1.6.2.2 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.
1.6.2.3 Material Safety Data Sheets
Submit Material Safety Data Sheets (MSDS) for all materials that are regulated for hazardous health effects. MSDS must be readily accessible during each work shift to employees when they are at the construction site.
1.6.3 Test Reports
1.6.3.1 Aggregates
ASTM C1260 for potential alkali-silica reactions, ASTM C295/C295M for petrographic analysis.
1.6.4 Field Samples
1.6.4.1 Slab Finish Sample
Install minimum of 10 foot by 10-foot slab. Slab finish sample must not be part of the final project. Finish as required by specification.
1.6.4.2 Surface Finish Samples
Provide a minimum of three sample concrete panels for each finish for each
SECTION 03 30 00 Page 8 mix design, 3 feet by 3 feet, 3 inches thick. Provide sample panels on-site at locations directed. Once approved, each set of panels must be representative of each of the finishes specified and of the workmanship and finish(es) required. Do not remove or destroy samples until directed by the Contracting Officer.
1.6.5 Quality Control Plan
Develop and submit for approval a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. The plan must include approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing. All quality control reports must be provided to the Contracting Officer, Quality Manager and Concrete Supplier. Maintain a copy of ACI SP-15 and CRSI 10MSP at project site.
1.6.6 Quality Control Personnel Certifications
The Contractor must submit for approval the responsibilities of the various quality control personnel, including the names and qualifications of the individuals in those positions and a quality control organizational chart defining the quality control hierarchy and the responsibility of the various positions. Quality control personnel must be employed by the Contractor.
Submit American Concrete Institute certification for the following:
a. CQC personnel responsible for inspection of concrete operations.
b. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and Curing Crews.
c. Field Testing Technicians: ACI Concrete Field Testing Technician, Grade I.
1.6.6.1 Quality Manager Qualifications
The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five (5) similar projects. Evidence of extraordinary proven experience may be considered by the Contracting Officer as sufficient to act as the Quality Manager.
1.6.6.2 Field Testing Technician and Testing Agency
Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.
a. Work on concrete under this contract must be performed by an ACI Concrete Field Testing Technician Grade 1 qualified in accordance with ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in
ACI SP-2.
b. Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.
c. Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM C1077.
SECTION 03 30 00 Page 9
1.6.7 Laboratory Qualifications for Concrete Qualification Testing
The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory (CCRL) inspected.
1.6.8 Laboratory Accreditation
Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:
a. Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a registered professional engineer in a U.S.
state or territory competent in concrete materials who is competent in concrete materials and must sign all reports and designs.
b. Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by
ASTM C31/C31M.
c. Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.
1.7 ENVIRONMENTAL REQUIREMENTS
Provide space ventilation according to manufacturer recommendations, at a minimum, during and following installation of concrete curing compound and sealer. Maintain one of the following ventilation conditions during the curing period or for 72 hours after installation:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 84 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.7.1 Submittals for Environmental Performance
a. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.
b. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.
c. Provide product data stating the location where all products were
SECTION 03 30 00 Page 10 manufactured
d. For projects using FSC certified formwork, provide chain-of-custody documentation for all certified wood products.
e. For projects using reusable formwork, provide data showing how formwork is reused.
f. Provide MSDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.
g. Provide MSDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500-mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Concrete materials may be locally available. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
1.8.2 Forest Stewardship Council (FSC) Certification
Use FSC-certified wood where specified. Provide letter of certification signed by lumber supplier. Indicate compliance with FSC STD 01 001 and identify certifying organization. Submit FSC certification numbers;
identify each certified product on a line-item basis. Submit copies of invoices bearing the FSC certification numbers.
1.9 QUALIFICATIONS FOR WELDING WORK
Welding procedures must be in accordance with AWS D1.4/D1.4M.
Verify that Welder qualifications are in accordance with AWS D1.4/D1.4M or under an equivalent qualification test approved in advance. Welders are permitted to do only the type of welding for which each is specifically qualified.
PART 2 PRODUCTS
2.1 MATERIALS FOR FORMS
Provide wood, plywood, plastic, carton, or steel. Use plywood or steel forms where a smooth form finish is required.
2.1.1 Wood Forms
Use lumber as specified in Section 06 10 00 ROUGH CARPENTRY and as follows. Provide lumber that is square edged or tongue-and-groove boards, free of raised grain, knotholes, or other surface defects. Provide plywood
SECTION 03 30 00 Page 11 that complies with NIST PS 1, B-B concrete form panels or better or AHA A135.4, hardboard for smooth form lining. Submit data verifying that composite wood products contain no urea formaldehyde resins. Virgin wood used must be FSC-certified.
2.1.1.1 Concrete Form Plywood (Standard Rough)
Provide plywood that conforms to NIST PS 1, B-B, concrete form, not less than 5/8-inch thick.
2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)
Provide plywood that conforms to NIST PS 1, B-B, high density form overlay, not less than 5/8-inch thick.
2.1.2 Plastic Forms
Plastic lumber as specified in Section 06 10 00 ROUGH CARPENTRY. Provide plastic forms that contain a minimum of 50 percent post-consumer recycled content, or a minimum of 50 percent post-industrial recycled content.
2.1.3 Carton Forms
Moisture resistant treated paper faces, biodegradable, structurally sufficient to support weight of wet concrete until initial set. Provide carton forms that contain a minimum of 5 percent post-consumer recycled content, or a minimum of 20 percent post-industrial recycled content.
2.1.4 Steel Forms
Provide steel form surfaces that do not contain irregularities, dents, or sags.
2.2 FORM TIES AND ACCESSORIES
Provide a form tie system that does not leave mild steel after break-off or removal any closer than 2 inches from the exposed surface. Do not use wire alone. Form ties and accessories must not reduce the effective cover of the reinforcement.
2.3 CONCRETE MIX DESIGN
2.3.1 Contractor-Furnished Mix Design
ACI 211.1, ACI 301, ACI 318, ACI 211.2, ACI 304.2R, and ACI 213R except as otherwise specified. Indicate the compressive strength (f'c) of the concrete for each portion of the structure(s) as specified below. Where faster set time is required, use Type III cement before using calcium chloride with approval from the contracting officer.
2.3.1.1 Footings
Proportion normal-weight concrete mixture as follows:
a. Minimum Compressive Strength: 4000 psi at 28 days.
b. Maximum Water-Cementitious Materials Ratio: 0.45.
c. Slump Limit: 8 inches for concrete with verified slump of 2 to 4
SECTION 03 30 00 Page 12 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.
2.3.1.2 Foundation Walls
Proportion normal-weight concrete mixture as follows:
a. Minimum Compressive Strength: 4000 psi at 28 days.
b. Maximum Water-Cementitious Materials Ratio: 0.45.
c. Slump Limit: 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.
2.3.1.3 Slab-on-Grade
Proportion normal-weight concrete mixture as follows:
a. Minimum Compressive Strength: 4000 psi at 28 days.
b. Maximum Water-Cementitious Materials Ratio: 0.40.
c. Slump Limit: 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.
d. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.
2.3.1.4 Suspended Slabs
Proportion structural lightweight concrete mixture as follows:
a. Minimum Compressive Strength: 4000 psi at 28 days.
b. Calculated Equilibrium Unit Weight: 115 lb/cu. ft, plus or minus 3 lb/cu. ft. as determined by ASTM C567/C567M.
c. Slump Limit: 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.
d. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.
2.3.1.5 Mix Proportions for Normal Weight Concrete
Trial design batches, mixture proportioning studies, and testing requirements for various classes and types of concrete specified are the responsibility of the Contractor. Base mixture proportions on compressive strength as determined by test specimens fabricated in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M. Samples of all materials used in mixture proportioning studies must be representative of those proposed for use in the project and must be accompanied by the manufacturer's or producer's test report indicating compliance with these specifications. Base trial mixtures having proportions, consistencies, and air content suitable for the work on methodology described in ACI 211.1.
In the trial mixture, use at least three different water-cementitious
SECTION 03 30 00 Page 13 material ratios for each type of mixture, which must produce a range of strength encompassing those required for each class and type of concrete required on the project. The maximum water-cementitious material ratio allowed must be based on equivalent water-cementitious material ratio calculations as determined by the conversion from the weight ratio of water to cement by weight equivalency method. Design laboratory trial mixture for maximum permitted slump and air content. Each combination of material proposed for use must have separate trial mixture, except for accelerator or retarder use can be provided without separate trial mixture. Report the temperature of concrete in each trial batch. For each water-cementitious material ratio, at least three test cylinders for each test age must be made and cured in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M for 7, 28 days. From these results, plot a curve showing the relationship between water-cementitious material ratio and strength for each set of trial mix studies. In addition, plot a curve showing the relationship between 7 and 28 day strengths.
2.3.1.6 Lightweight Concrete Proportion
ACI 211.2, using weight method. Provide ASTM C330/C330M aggregates for concrete.
2.3.1.7 Required Average Strength of Mix Design
The selected mixture must produce an average compressive strength exceeding the specified strength by the amount indicated in ACI 301, but may not exceed the specified strength at the same age by more than 20 percent.
When a concrete production facility has a record of at least 15 consecutive tests, the standard deviation must be calculated and the required average compressive strength must be determined in accordance with ACI 301.
2.3.2 Ready-Mix Concrete
Provide concrete that meets the requirements of ASTM C94/C94M.
Ready-mixed concrete manufacturer must provide duplicate delivery tickets with each load of concrete delivered. Provide delivery tickets with the following information in addition to that required by ASTM C94/C94M:
Type and brand cement
Cement and complementary cementitious materials content in 94-pound bags per cubic yard of concrete
Maximum size of aggregate
Amount and brand name of admixtures
Total water content expressed by water cementitious material ratio
2.3.3 Concrete Curing Materials
Provide concrete curing material in accordance with ACI 301 Section 5 and ACI 308.1 Section 2. Submit product data for concrete curing compounds.
Submit manufactures instructions for placement of curing compound.
SECTION 03 30 00 Page 14
2.4 MATERIALS
2.4.1 Cementitious Materials
2.4.1.1 Portland Cement
Provide cement that conforms to ASTM C150/C150M, Type II (2), with tri-calcium aluminates (C3A) content less than 10 percent and a maximum cement-alkali content of 0.80 percent Na2Oe (sodium oxide) equivalent.
Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.
For portland cement manufactured in a kiln fueled by hazardous waste, maintain a record of source for each batch. Supplier must certify that no hazardous waste is used in the fuel mix or raw materials.
2.4.2 Water
Water must comply with the requirements of ASTM C1602/C1602M. Minimize the amount of water in the mix. Improve workability by adjusting the grading rather than by adding water. Water must be potable; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete. Submit test report showing water complies with ASTM C1602/C1602M.
2.4.3 Aggregates
ASTM C33/C33M, except as modified herein. Furnish aggregates for exposed concrete surfaces from one source. Provide aggregates that do not contain any substance which may be deleteriously reactive with the alkalies in the cement. Submit test report showing compliance with ASTM C33/C33M.
If a combination of these materials is chosen, the minimum amount must be a linear combination of the minimum amounts above. Include these materials in sufficient proportion to show less than 0.08 percent expansion at 28 days after casting when tested in accordance with ASTM C1567.
Aggregates must not possess properties or constituents that are known to have specific unfavorable effects in concrete when tested in accordance with ASTM C295/C295M.
2.4.3.1 Aggregates/Combined Aggregate Gradation (Floor Slabs Only)
ASTM C33/C33M, uniformly graded and as follows: Nominal maximum aggregate size of 1 inch. A combined sieve analysis must indicate a well graded aggregate from coarsest to finest with not more than 18 percent and not less than 8 percent retained on an individual sieve, except that less than 8 percent may be retained on coarsest sieve and on No. 50 (0.3mm) sieve, and less than 8 percent may be retained on sieves finer than No. 50 (0.3mm). Provide sand that is at least 50 percent natural sand.
2.4.4 Nonshrink Grout
ASTM C1107/C1107M.
2.4.5 Admixtures
ASTM C494/C494M: Type A, water reducing; Type B, retarding; Type C, accelerating; Type D, water-reducing and retarding; and Type E, SECTION 03 30 00 Page 15 water-reducing and accelerating admixture. Do not use calcium chloride admixtures. Submit product data for admixtures used in concrete.
2.4.5.1 High Range Water Reducer (HRWR) (Superplasticizers)
ASTM C494/C494M, Type F and Type G (HRWR retarding admixture) and
ASTM C1017/C1017M.
2.4.6 Expansion/Contraction Joint Filler
ASTM D1751 or ASTM D1752 Type I or II. Material must be 1/2 inch thick, unless otherwise indicated.
2.4.7 Joint Sealants
Submit manufacturer's product data, indicating VOC content.
2.4.7.1 Horizontal Surfaces, 3 Percent Slope, Maximum
ASTM D6690 or ASTM C920, Type M, Class 25, Use T.
2.4.7.2 Vertical Surfaces Greater Than 3 Percent Slope
ASTM C920, Type M, Grade NS, Class 25, Use T.
2.4.7.3 Preformed Polychloroprene Elastomeric Type
ASTM D2628.
2.4.7.4 Lubricant for Preformed Compression Seals
ASTM D2835.
2.4.8 Biodegradable Form Release Agent
Provide form release agent that is colorless, biodegradable, and with a low (maximum of 55 grams/liter (g/l)) VOC content. A minimum of 85 percent of the total product must be biobased material. Provide product that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces. Provide form release agent that does not contain diesel fuel, petroleum-based lubricating oils, waxes, or kerosene. Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.
2.5 REINFORCEMENT
2.5.1 Reinforcing Bars
ACI 301 unless otherwise specified. Use deformed steel. ASTM A615/A615M with the bars marked A, Grade 60; or ASTM A996/A996M with the bars marked R, Grade 60, or marked A, Grade 40, 60. Cold drawn wire used for spiral reinforcement must conform to ASTM A1064/A1064M.
2.5.1.1 Weldable Reinforcing Bars
Provide weldable reinforcing bars that conform to ASTM A706/A706M and ASTM A615/A615M and Supplement S1, Grade 60, except that the maximum carbon content must be 0.55 percent.
SECTION 03 30 00 Page 16
2.5.2 Mechanical Reinforcing Bar Connectors
ACI 301. Provide 125 percent minimum yield strength of the reinforcement bar.
2.5.3 Wire
2.5.3.1 Welded Wire Reinforcement
ASTM A1064/A1064M.
2.5.3.2 Steel Wire
Wire must conform to ASTM A1064/A1064M.
2.5.4 Reinforcing Bar Supports
Supports include bolsters, chairs, spacers, and other devices…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.