ITP_2015_SOW_single_purchase_07-12-15_update.docx
DOCX document 31 KB Posted
- Attached to
- ICE TETHERED PROFILERS Federal contract opportunity
- Solicitation number
- N62306-16--R-A003
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PD2_SOLICITATION_-_FINAL.doc | DOC document | |
| PD2_SOLICITATION_-_FINAL.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITP SOW 07 December 2015
Ice Tethered Profile (ITP) Statement of Work (SOW) Background Ice Tethered Profilers are required in order to maintain a persistent in situ sensing footprint in the Arctic Ocean. These observations will play a very integral role in the real-time Ocean modeling system and will be assimilated into ocean model nowcasts and are also used to validate and to assess the skill of ocean forecasts acoustic models. The Ice Tethered Profiler will be placed at the ICEX 2016 ice camp in order to assess the oceanographic variability as required to reduce model uncertainty and increase predictability by providing high quality temperature/salinity data at depth. Anti-Submarine Warfare (ASW) and other model products are impacted by conductivity, temperature, and depth (CTD) data products and would be less accurate without this data.
Objectives The goals of this contract effort are to purchase an ITP w/CTD, training/gear for deployment, and near-real time data management. The end product is near real-time salinity and temperature profile data from the ice camp provided as input to the operational oceanographic models.
Scope NAVOCEANO expects to acquire an ITP w/CTD and the training and materials needed to deploy it at the ICEX ice camp, and real-time data management of the CTD profiles provided by the ITP.
Tasks
| Task Number |
| Work |
Milestones Projected Completion Date
| 1 |
| Build ITP with CTD |
| 15 Feb 2016 |
| 2 |
| Train Personnel on ITP deployment |
| 01 Feb 2016 |
| 3 |
| Prepare ITP and deployment gear for shipping |
| 15 Feb 2016 |
| 4 |
| Provide data management |
| Life of ITP |
Task 1 – Build ITP with CTD Construction of the ITP system that consists of three components: a surface instrument package that sits atop an ice floe, a weighted, wire-rope tether of a length to be determined by deployment location depth (up to 800 m) suspended from the surface package, and an instrumented (CTD) underwater unit that travels up and down the wire tether.
Task 2 – Deployment training Provide training to four personnel on the deployment and activation of the ITP.
Task 3 – Package ITP and deployment gear for delivery Package ITP w/CTD and all necessary deployment gear so NAVOCEANO can coordinate shipping to Deadhorse, AK. Inspection will be completed at WHOI, prior to shipping, and acceptance will be done at ICEX camp during deployment.
Task 4 – Provide data management Provide iridium comms for data receipt from the ITP once deployed and initial processing services, quality control, and forwarding to NAVOCEANO for duration of ITP life.
Delivery Deliverable Schedule
| Deliverable |
| Description |
| Quantity/Media |
| Date Completed |
| 1 |
| Ice Tethered Profiler with CTD (hardware specifications are in appendix A) |
| 1 |
| 15-FEB-2016 |
| 2 |
| ITP deployment gear |
· Rigging/Handling Gear
· Tripod Accessories
· Deployment Winch
· Augers and field supplies
| See appendix B for list of deployment gear |
| 15-FEB-2016 |
| 3 |
| ITP Deployment training at contractor site for 4 people and documentation |
| 2 printed and 1 digital copy of deployment documentation |
| 01-FEB-2016 |
| 4 |
| Monthly progress reports |
| Monthly during tasks 1 - 3 |
| 5 |
| CTD profile from ITP |
| Near-Real time email/web posting |
| Daily from date of deployment to EOL of ITP |
NAVOCEANO will provide for shipment of ITP and deployment gear from contractor facility to Deadhorse, AK Place of Performance All work will be performed at contractor’s facilities.
Period of Performance The period of performance will be from contract award to Sept 30, 2016.
Options There will be no options on this statement of work.
Appendix A: ITP Hardware specifications Mooring length: 10 to 800 m Profiling range: 1,500,000 m on standard battery pack Duration: 2.5 to 3 years returning two 750 m (one way) profiles per day (2000 total) Temperature specification: -35° C for prototypes Data telemetry: typically 50 Kbytes per profile (totaling 100 Mbytes over 3 years) Sensors: Sea-Bird 41-CP CTD (same as many ARGO floats) Telemetry: Sea-Bird inductive link from profiler to surface unit;
Iridium link to shore Power: lithium BCX “DD” battery packs;
3300 Wh in surface package (after derating for temperature), 2500 Wh in profiler Size: Profiler fits through a 10.5-1” diameter hole in the ice
Appendix B: ITP Deployment Gear
1. Tripod Components
a. 3 each tripod legs with insert pins
b. 3 each feet inserts (two have galvanized eye nuts attached)
c. 3 each chain legs (5/16” galvanized chain and 5/16” screw pin shackles)
d. Spider with 3 pins
e. Top clevis with 3 each 5/8” sling links and 3 each 5/8” screw pin shackles
f. 1/2 Ton chain hoist (Ross)
g. McKissik 6” snatch block
h. Cleat with 2 each ½” x 5” bolts, lock washers, flat washers, and nuts
2. ITP Deployment Winch Components
a. Aluminum reel with 790m of ¼” wire & molded chain (with Delrin inserts)
b. Brake/base assembly
c. Insert quick release pins (+ spares)
d. 2 each lifting legs
e. 250 lb. anchor
f. Shaft
g. 4 each shaft arbors
h. Recovery handle
3. Motor Powered Ice Auger (10”) – Ice Accessories
a. 5 each 1m flight extensions
b. 1 each 11” flight extension
c. Cutting blades (spares in bag)
d. Jiffy Head (1-spare if needed)
e. 2 cycle gas mixture
f. Chisel and ice scooper (‘Chipper Dipper’)
g. Ice Pick(s)
h. Shovel(s)
4. Hand Powered Ice Auger (2”)
a. 5 each flight extensions
b. 2” cutting bit (+1 spare)
c. Handle assembly
d. Carrying case
5. Akio Ice Sleds: Small 4’ and Large 7’
6. Handling Gear and General Supplies (orange tool boxes-milk crates)
a. 88/23 tape (2-3 each)
b. 2 each 4’ slings; 2 each 6’ slings; 2 each 8’ slings
c. Tie wraps (8”)
d. 2 each 1/2” safety shackles with cotter pins
e. 5/8” sling link (wire to anchor connection)
f. Black rope knives
g. 100’ VLS (slip line)
h. 2 each 10” ‘Crescent’ wrenches
i. 2 each angled cutters
j. 2 each ½” x 5 ½” SS HH bolts, lock washers, flat washers, nuts, and bolt bushings
k. 3/8” drive socket set
l. 2 each ¾” box wrenches
m. 7/16”, ½”, 9/16”, and ¾” box wrenches
n. Cotter pins
o. 2 each ‘Yale’ grips
p. Cordless drill (spare charged battery)
q. Blue grease (with acid brushes)
r. 6’ ladder
s. Ice thickness gage and ice floe detection device (steel)
t. 4 each large pieces of plywood (removed from ITP buoy box)
7. Instrument and Electronic Supplies (grey tool box)
a. 88 tape
b. Tie wraps (8”)
c. Utility knife
d. 2 each 8” ‘Crescent’ wrenches
e. Angled cutters
f. Needlenose and 8” pliers
g. Small slotted, regular slotted, and phillips screwdrivers
h. 3/16” long shaft ball driver
i. 3/32”, ¼”, 5/32”, 5/16”, 7/64”, 9/64” and 3/8” ball drivers
j. 3/8”, 7/16” and 11/16” box wrenches
k. ½-13 x 3” Nylon SH bolts
l. Spare SS SH bolts, washers, locks
m. Spare snap ring, #4&6 plugs
n. Spare O-rings (#163 profiler, #238 drive motor, #254 piston, #259 dome)
o. Desiccant packs
p. Heat packs
q. Cotton swabs
r. Wipes
s. DC-4 grease
8. Surface Package and Profiler Components
a. Surlyn Foam Buoy
b. Ice Tethered Profiling Instrument
c. 2 – ITP bumper stops
d. Boat gaffe