The file's text, extracted by GovTribe without its formatting.
Sheet1
| ELINS/SCOPE SHEET | |
| CONTRACT: | PUMPS AND MOTORS (CONTINGENCY) |
| CONTRACTOR; | |
| CONTRACT NR: | |
| SHIP: | USS HIGGINS (DDG-76) |
| LOCATION: | NAVY REGION SOUTHWEST |
| POC: | MICHAEL SHEAHAN |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ELIN 0001 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO DISCONNECT AND REMOVE THE EXISTING FIRE PUMP AND MOTOR ASSEMBLY FROM THE FOUNDATION AND ASSOCIATED PIPING. AFTER OVERHAUL OF (EXISTING) PUMP AND ASSEMBLE ONTO NEW (GFM) MOTOR, INSTALL THE PUMP AND MOTOR ASSEMBLY ONTO THE FOUNDATION AND CONNECT TO THE ASSOCIATED PIPING IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND STATEMENT OF WORK. | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ELIN 0002 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO ACCOMPLISH A CLASS B OVERHAUL OF THE FIREPUMP AND ASSEMBLY ONTO THE GFM MOTOR. | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ELIN 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), CRANE SUPPORT, AND TRANSPORTATION OF THE FIRE PUMP AND MOTOR ASSEMBLY FROM THE FOUNDATION TO SHOP FOR OVERHAUL AND BACK ONTO THE FOUNDATION AFTER REPAIR | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ELIN 0004 PROVIDE LABOR, SEVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TESTING OF THE NEW GFM MOTOR PRIOR TO ASSEMBLY OF THE FIREPUMP AND SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED FIRE PUMP AND MOTOR ASSEMBLY | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ELIN 0005 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF FIRE PUMP AND MOTOR ASSEMBLY OVERHAUL AND INSTALLATION | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-2851 | 4-254-0-E, NR. 4 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ELIN 0007 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE NEW AND DISTURBED SURFACES IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-32 | 1 | | $0.00 | | |
GERALD CHAVEZ, SBS TOTAL $0.00
| MILESTONE EVENT | DATE |
| 1. Delivery Order Start | 21-Apr-2020 |
| 2. Removal of pump and motor assembly from foundation. Rigging and crane offload. | 22 - 27 April 2020 |
| 3. Pump and motor disassembly, overhaul of the firepeump, assembly onto the new GFM motor unit, and shop testing | 28 April - 14 May 2020 |
| 4. Crane onload and rigging. Pump and motor assembly installation on foundation, Shipboard testing | 15 - 20 May 2020 |
| 5. Delivery Order End | 21-May-2020 |
| NOTE: |
| 1. Refer to technical manual S6225-W6-MMA-010 Navy Standard Titanium Centrifugal Pump for detailed procedures on the removal of the existing fire pump and motor assembly and installation of overhauled fire pump and new motor assembly to include shipboard operational testing. |
Sheet2