Amendment_0001.pdf
PDF 43 KB Posted
- Attached to
- LCAC 73 PSE Federal contract opportunity
- Solicitation number
- N55236-17-R-0017
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_N55236-17-R-0017_LCAC_73_PSE.pdf | ||
| Attachment_1_-_Reference_Information_Sheet.doc | DOC document | |
| Attachment_2_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| BOST_516-17_LCAC_73_PSE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LCAC73
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: LCAC 73 PSE
The purpose of this amendment is to answ er Requests for Specif ication Clarif ication, see enclosed.
See continuous page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N5523617R0017
X 9B. DATED (SEE ITEM 11)
02-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2017
CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
CODE 410 3755 BRINSER STREET, STE 1
SAN DIEGO CA 92136
N55236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N5523617R0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
1. QUESTION: As to ITEM NO: 555-11-002, TITLE: Halon, PARA. NO: 3.2.7, following material has an unacceptable lead time for purchase and request item be provided as Government Furnished Material (GFM) in order to meet Period of Performance (POP): ELBOW, TUBE, D10021AD16, 4730-01-364-8698, 8 EA
ANSWER: Items will be provided as GFM.
2. QUESTION: As to ITEM NO: 234-11-001 & 234-12-001, TITLE: Starboard (Port) ETF40B Main Propulsion Engine; remove, install and test, PARA. NO: 3.1.6, special lifting equipment is required to accomplish removal, installation, lifting of the ETF40B Main Propulsion Engines.
a) Is it the government’s intent that the contractor provides certified lifting fixtures?
b) Is it the government’s intent that the contractor provides crane (or lifting equipment) to remove and reinstall the Main Engines?
c) If the craft is placed in a hangar for this availability, will the overhead crane be available for contractor’s use?
ANSWER:
a) All crane requirements will be the responsibility of the Navy personnel assigned to the Craft detachment.
b) Contractor will be required to coordinate any lifting requirements with Craft Crew.
c) Contractor will not be authorized to operate any command cranes or be able to check out any government lifting fixtures.
3. QUESTION: As to ITEM NO: 234-11-001 & 234-12-001, TITLE: Starboard (Port) ETF40B Main Propulsion Engine; remove, install and test, PARA. NO: 3.10, special test equipment is required to accomplish system functional testing of the ETF40B Main Propulsion Engines. Section 5 only lists the shipping containers for the ET40B Main Engines. Will the Government provide the special test equipment?
ANSWER: Yes, Government will provide all necessary LCAC specific testing equipment as required.
4. QUESTION: As to ITEM NO: 234-11-001 & 234-12-001, TITLE: Starboard (Port) ETF40B Main Propulsion Engine; remove, install and test, PARA. NO: 3.8, Paragraph 3.8 reads “Inspect each engine module and associated combustion inlet air ducts located in 1.2, to include the intake ducting, intake filtration compartment, blow-in door areas (both clean side and engine tunnel), topside of Engine and Auxiliary Power Unit (APU) compartment, APU enclosure and APU filtration ducting for cleanliness and completion of work prior to installation of the inlet air filter stages and immediately prior to the first engine start attempt.” Contractor notes APU filtration removal or reinstallation is not indicated in work items. Is it the Government’s intent that the APU filtration removal and reinstallation is included in this work item?
ANSWER: Government requires a cleanliness inspection of adjoining areas and equipment in the vicinity of the work area prior to starting equipment. This protects Foreign Object Debris (FOD) damage prior to start ups.
Paragraph 3.8 directs the contractor to inspect the APU Compartment and filtration ducting. This requires the removal and reinstallation of the APU filtration.
5. QUESTION: As to ITEM NO: 248-85-002, TITLE: LCAC Craft Change Document (CCD) – 391 Rev 01, Lift Fan Shaft Journal and Thread Repair; accomplish (OPTION ITEM), PARA. NO: 4.2, accomplishing repairs in accordance with this CCD typically requires the Lift Fan Impeller assemblies to be shop static balancing to ensure successful dynamic balance checks during operations. Paragraph 4.2 indicates the work items where the work on this work item interfaces which are also all OPTION ITEMS, but include all work required to remove impeller assemblies from the Craft. Is it the government’s intent that the impeller assemblies be removed and turned over for static balancing after the repaired impeller shafts are reinstalled?
N5523617R0017
ANSWER: Yes, Impellers will be required to be turned over as GFM assemblies for the Lift Fan Shop to balance prior to the contractor’s reinstallation.