ELIN_16-Q-3000_USS_GRIDLEY_Preservation.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USS GRIDLEY - INTERIOR PRESERVATION Federal contract opportunity
Solicitation number
N55236-16-Q-3000
Issued by
Department of the Navy Naval Sea Systems Command

About this file

ELIN 16-Q-3000 USS GRIDLEY

View the file

Other files for this federal contract opportunity

Other files attached to USS GRIDLEY - INTERIOR PRESERVATION, newest first.
File Type Posted
N55236-16-Q-3000_USS_GRIDLEY.pdf PDF
Attachment_1_Request_for_Specification_Clarification_Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

"INTERIOR PRESERVATION CONTINGENCY"
CONTRACT:N55236-16-Q-3000
SHIP:USS GRIDLEY (DDG-101)
POP16 OCT 2015 - 08 NOV 2015
LOCATION:NAVAL BASE SAN DIEGO
POC:TIM GUENTHER (732) 682-0679
JSNLOCATIONSQ FTUNIT PRICEEXT PRICE
EA01-15374-226-0-E, AUXILIARY ROOM NO. 26,300
ELIN: A001 PREPARE, PRIME AND PAINT MACHINERY SPACE BILGES IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-32.6,300$ - 0$ - 0

JOEY MAGBUTAY, CIS SBS TOTAL $ - 0

1. Location listed above is defined as a critical coated area in accordance with NAVSEA Standard Item 009-32.
2. The Contractor shall accomplish the requirements of the NAVSEA Standard Items, including 009-32, Table 3, Line 11, Column A, B, D, and E and applicable references listed in the contract for the surface preparation, power tool cleaning, and preservation (primer, stripe coat, and top coat) of the bilge deck surfaces at the location listed above to include all vertical and horizontal surfaces above the bilge deck area up to the deck plate cribbing that has pre-existing "Terracota Red" paint such as all bulkheads, bulkhead framing, pipes, valves, foundations, brackets, deck pads, deck clips, piping hangers, tank cover plates, deck plate cribbing, coolers, sea chest box, and strainers.
3. The Contractor shall be responsible for the removal of bilge liquid, oily waste, debris, dirt, and etc. that is present in the bilge area at the beginning of the perservation work. The Contractor shall be responsible to maintain the cleanliness of the bilge area and all surfaces listed in Specification Note 2 throughout the duration of the preservation work in accordance with NAVSEA Standard Items.
4. The Contractor shall install protective coverings, blanks, and plugs and take precautions to ensure that no damage or contamination will result to the ship drainage system, ship's machinery, electrical, and piping systems or other equipment during the work specified in this work item. Remove all installed protective coverings, blanks and plugs as required.
5. The Contractor shall provide all management services, administrative services, materials, tools, equipment, labor, crane/rigging services, scaffolding, access cuts, utilities (i.e. air, water and electricity, etc.) and other required services and support to accomplish the work specified in this contract.
6. The Contractor shall submit one legible copy in electronic media of the Coating and Application Product Summary (CAPS) sheet to the Supervisor for approval at least 48 hours prior to the start of the preservation process. The submittal shall include all the information identified in QA Checklist Form Appendix 8. The approved CAPS sheet shall be at the work site throughout the preservation process.
7. The Contractor shall not preserve surface areas that are not normally painted. Surface area inside the coaming of strainers, filters, pumps, drains, equipment, purifiers, heaters, is not included in the preservation work.
8. Point of contact for any issues will be CIS SBS Joey Magbutay, Cell Phone No. (619) 664-1872.