Request_for_Clarification_003.pdf
PDF 17 KB Posted
- Attached to
- UF-8 Federal contract opportunity
- Solicitation number
- N4523A19R1063
About this file
RFC #003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BS_C04.0_Attachment_J-2_5-way_break_out_UF-8_updated_20JUN19.xlsx | XLSX spreadsheet | |
| BS_C04.0_Attachment_J-2_5-way_break_out_UF-8_updated_10JUN19.xlsx | XLSX spreadsheet | |
| Request_for_Clarification_002.pdf | ||
| Request_for_Clarification_001.pdf | ||
| C04.0_Attachment_J-5_Corporate_Experience_Data_Sheet_N4523A19R1063.pdf | ||
| C04.0_Attachment_J-8__BAVR_Instructions.pdf | ||
| Exhibit_A_CDRLs_and_DIDs_UF-8.pdf | ||
| C04.0_Attachment_J-4_Contract_Performance_Data_Sheet_N4523A19R1063.pdf | ||
| C04.0_Attachment_J-7_FBO_Posting_Instructions.pdf | ||
| C04.0_Attachment_J-1_UF-8_SOW_25AUG18.pdf | ||
| C04.0_Attachment_J-2_5-way_break_out_UF-8.xlsx | XLSX spreadsheet | |
| C04.0_Attachment_J-3_Request_for_Clarification_(RFC)_Form_N4523A19R1063.pdf | ||
| C04.0_Attachment_J-6_References.zip | ZIP file | |
| N4523A19R1063_Solicitation.pdf | ||
| SOW_UF_8.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 20 June 2019
QUESTION NO: 003
REQUIREMENT: Utility Float (UF-8)
REQUISITION NO.: N4523A19R1063
ITEM NO: C04.0_Attachment_J-2_5-way_break_out_UF-8 TITLE: 5-way break out UF-8
ISSUING OFFICE POC (CODE 440.22):
Kelly Hadcroft: (360) 476-1356 kelly.hadcroft@navy.mil
PARA. NO: N/A PAGE NO: 1 CONTRACTOR:
PLANNER’S NAME: N/A ATTACH. NO: N/A CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Attachment J-2 (5-way break out UF-8) spreadsheet line 8 covers paragraph 1.16.1 which refers to ‘Environmental and Hazwaste Mngt.’ The SOW paragraph 1.16.1 calls to ‘Accomplish Preservation’.
Contractor requests Government to provide guidance for corrections or a revised spreadsheet.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
See attached J-2 attachment revised 20JUN19.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING
OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST
FOR PROPOSAL.
mailto:kelly.hadcroft@navy.mil
File details come from the government source that posted it.