C04.0_Attachment_J-2_5-way_break_out_UF-8.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
UF-8 Federal contract opportunity
Solicitation number
N4523A19R1063
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment J-2 5-way break out UF-8

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =(UF-8) Utility Float 8DATE: =
PRIMESUBCONTRACTORPRIME
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&APRIME

Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate

PARAGRAPH No.TITLEM/HMATERIAL PRICETOTAL
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material PriceLabor CostMaterial CostTOTAL

Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)

1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessels$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00
1.20Gas Free$0.00$0.00$0.00$0.00$0.00
1.21Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.13.3Scaffolding$0.00$0.00$0.00$0.00$0.00
1.16.1Environmental and Hazwaste Mngt$0.00$0.00$0.00$0.00$0.00
3.1Docking / Undocking Vessel$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zincs$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & Freeboard UT Inspection$0.00$0.00$0.00$0.00$0.00
3.4.1Open, pump, clean, ventilate & Gas free tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color schemes & Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch-up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Blast & Preserve Void Access Covers$0.00$0.00$0.00$0.00$0.00
3.4.7Tank/Void Exterior Identification$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.4.10Tank/Void Access Covers$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.3UT Inspection$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A RateProfit Rate:$0.00
Total Proposed Price

********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.

File details come from the government source that posted it.