Combined_SOW_SSN_715.docx
DOCX document 39 KB Posted
- Attached to
- Forklift Rentals Federal contract opportunity
- Solicitation number
- N4523A18RC45081
About this file
Revised Statement of Work due to industry difficulty in meeting the requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C11.0_Forklift_Pricing_Schedule.xlsx | XLSX spreadsheet | |
| 81279595-04170-Combined_SOW_SSN_715.docx | DOCX document | |
| 52.212-2.docx | DOCX document | |
| 52.212-5.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
REV 1/25/2018
JML #: 8137-9550
DD2276 #: N4523A18RC45081
Ship/Activity: SSN 715 Title: Rental Forklift Place of Performance: Puget Sound Naval Shipyard and Intermediate Maintenance Facility, Bremerton, WA Period of Performance: 12 MONTHS 6/14/2018 – 6/13/2019
1 BACKGROUND.
1.1 In support of material handling operations, Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) requires multiple capacity forklifts for the movement of materials throughout the shipyard, such as through buildings, along piers and down in dry docks.
2 REFERENCES.
2.1 40 CFR 63.6625(i) or (j)
2.2 29 CFR, Part 1926, Subpart H, Materials Handling, Storage, Use, and Disposal
2.3 Industrial Truck Standard Development Foundation, ITSDF B56 standard
3 WORK REQUIREMENTS.
3.1 The contractor shall provide (5) 3-ton forklifts (herein referred to as vehicle), equipped as follows:
3.1.1 Rated Capacity: 6,000 lbs. (minimum)
3.1.2 Load Center: 24 inches
3.1.3 Transmission: Automatic
3.1.4 Tires: Solid or Foam filled
3.1.5 Overall Width: 52” (maximum)
3.1.6 Fork Length: 48” pallet type
3.1.7 Forks shall have side-shift capability
3.1.8 Fuel: Diesel or Gasoline
3.1.9 Parking Brake: Hand / foot operated
3.1.10 Lights: Brake, front and rear drive lights, work-lights
3.1.11 Dash Instruments: Battery discharge, oil pressure, fuel gauge, water temperature, and engine hour meter.
3.1.12 No spinner knobs on steering wheel.
3.1.13 Lifting Attachment Points: See section 3.5
3.2 The contractor shall provide (2) 7-ton forklifts (herein referred to as vehicle), equipped as follows:
3.2.1 Rated Capacity: 14,000 lbs. (minimum)
3.2.2 Load Center: 24 inches
3.2.3 Transmission: Automatic
3.2.4 Tires: Solid (foam filled)
3.2.5 Mast Type: Nested channels to provide maximum visibility of the attachment and load.
3.2.6 Overall Width: 82” (maximum)
3.2.7 Fork Length: 72” - 96” pallet type
3.2.8 Forks shall have side-shift capability
3.2.9 Fork Spread: 6” minimum (to inside edge), 75” maximum (to outside edge)
3.2.10 Fuel: Diesel
3.2.11 Parking Brake: Hand or foot operated
3.2.12 Lights: Brake, front and rear drive lights, work-lights.
3.2.13 Dash Instruments: Battery discharge, oil pressure, fuel gauge, water temperature, and engine hour meter.
3.2.14 No spinner knobs on steering wheel.
3.2.15 Lifting Attachment Points: See section 3.5
3.3 The contractor shall provide (2) 10-ton forklifts from 8/14/2018 – 6/13/2019 (herein referred to as vehicle), equipped as follows:
3.3.1 Rated Capacity: 20,000 lbs. (minimum)
3.3.2 Load Center: 24 inch (minimum)
3.3.3 Transmission: Automatic
3.3.4 Tires: Solid (foam filled)
3.3.5 Mast Type: 2 stage, with nested channel to provide maximum visibility of attachment or load
3.3.6 Overall Width: 96” (maximum) From outside tire to outside tire
3.3.7 Fork Length: 96” pallet type
3.3.8 Forks shall have side-shift capability
3.3.9 Fuel: Diesel
3.3.10 Parking Brake: Hand or foot operated
3.3.11 Lights: Brake, front and rear drive lights, work-lights.
3.3.12 Dash Instruments: Battery discharge, oil pressure, fuel gauge, water temperature, and engine hour meter.
3.3.13 Operator Cab: Forklift shall be supplied with a fully enclosed cab equipped with two doors, heater, defroster, fan and wipers.
3.3.14 No spinner knobs on steering wheel.
3.3.15 Lifting attachment points: See section 3.5.
3.4 Weigh vehicle(s) prior to delivery and mark (4 inch high black lettering) with the individual weight in pounds on each side of vehicle(s). OEM weight markings are acceptable.
3.5 Lifting attachment points shall meet the following requirements:
3.5.1 Lifting attachment points shall have an identified Working Load Limit (WLL) marked at each point. Alternatively, the lifting attachment point’s WLL shown in operations manual, or clearly identified in writing on OEM letter head, would be acceptable.
3.5.2 All lifting attachment points shall be clearly above the vertical center of gravity and symmetric about the vehicle(s) fore and aft centerline.
3.5.3 Lifting attachment points shall accept common rigging shackles.
3.5.4 Lifting gear shall only contact the vehicle at the lifting points. It is unacceptable to remove vehicle components to accommodate lifting gear.
3.5.5 Use of spreader beams, other special lifting gear or unusually complex lifting arrangements are not allowed unless evaluated and approved by PSNS & IMF Lifting & Handling Department (Department 700 Code 740).
3.5.6 Vehicle component assembly lift points, used during equipment fabrication, shall not be used for lifting the entire assembled vehicle unless specifically identified in the OEM operations manual.
3.5.7 Vehicle tow point, hitch, or draw bar shall not be used as a lifting attachment.
3.5.8 Ensure retrofitted, repaired, or modified lifting accessories on provided vehicle(s) comply with reference 2.2. Additionally, size attachment points based on either pair of diagonally opposed legs of a four-point lifting assembly carrying the entire load for worst-case scenario of load distribution with respect to center of gravity.
3.5.8.1.1 Size lifting attachments for three-point lifts such that any two points carry the entire load based on worst-case scenario load distribution with respect to center of gravity.
3.5.9 Ensure the working load limit of each lifting attachment point is not exceeded by sling angle tension when lifted. Minimum sling angle with respect to horizontal shall be 60°.
3.5.9.1.1 Orientation of lifting attachment points shall be such that when loaded, the direction of force applied to each sling shall be aligned with the plane of the padeye or lug within ±5°.
3.6 Inspect and provide each vehicle in a safe and operational condition, free of rust, cosmetic defects, or damage.
3.7 Provide vehicle(s) that meets, or exceeds, the safety requirements of 2.3 related to the elements of design, operation, and maintenance, the standardization relating to principal dimensions to facilitate interchangeability, and establishment of test methods and test procedures, for powered and non-powered industrial trucks.
3.8 Accomplish the following prior to delivery and provide written certification of accomplishment upon delivery:
3.8.1 Provide new condition maintenance free battery.
3.8.2 Inspect all hoses and belts for cracks, wear, etc. and replace items that suspect to failure.
3.8.3 Replace the engine oil with new or perform an engine oil analysis per 2.1 on existing engine oil to validate effectiveness.
3.8.4 Operationally test the vehicle(s) to include all manufacturer safety features and performance criteria.
3.8.5 Ensure vehicle(s) is/are crane ready according to paragraph 3.6.
3.9 Inspect the vehicle(s) provided, at the time of delivery and before acceptance, with the Contracting Officer’s Representative (COR) or other authorized government representative.
3.9.1 Document in writing the condition of the vehicle to ensure it meets contract requirements. Provide a signed copy of the inspection document to the government representative.
3.9.2 Correct any discrepancies noted or replace the delivered vehicle(s) with a compliant unit.
3.10 Inspect the vehicle(s), upon completion of the period of performance and at the time of pick-up, or prior to the return of the vehicle(s) to the contractor for maintenance, repair or replacement during the period of performance, with the authorized Government representative and document any new conditions or damage. Provide a signed copy of the inspection document to the government representative.
3.11 Provide a copy of the manufacturer Operation and Maintenance manual(s), containing detailed operating instructions specific for the vehicle provided to the Contracting Officer’s Representative or designated Government employee.
3.12 Perform any required scheduled maintenance, in accordance with the manufacturer’s maintenance standards, on vehicles provided during the period of performance.
3.12.1 Provide the planned scheduled maintenance schedule, with the contractor’s proposal, and notify the Contracting Officer’s Representative four days in advance of performing maintenance on the vehicle(s), to permit coordination with project workload.
3.12.2 Provide a replacement vehicle, within 24 hours, for any unscheduled repairs required.
3.12.3 Perform lockout/tag-out of vehicle(s) prior to performing maintenance. Notify the Contracting Officer’s Representative if vehicle(s) maintenance must be performed in a condition not requiring lockout or tag-out conditions.
3.13 Replace inoperative or unsafe vehicles, upon notification by authorized Government representative, within 24 hours if repairs cannot be accomplished to return the vehicle to full operating status within 8 hours of a service call.
3.13.1 Supply a manufacturer’s technical representative or ASME certified mechanic to respond on-site within 8 hours of Government notification of a problem on a 24hrs/day, including weekends and holidays.
3.13.2 Provide the Contracting Officer’s Representative the name, telephone number/pager and/or other contact information to coordinate contact with the contractor’s representative for repair of defective or inoperative equipment.
3.14 Coordinate scheduled pick-up of the vehicle(s), at the end of the period of performance, with the Contracting Officer’s Representative. If the contractor is unable to accomplish pick-up on this date, immediately notify the Contracting Officer’s Representative and provide an alternate date and time of pick-up that is mutually agreeable.
4 DELIVERABLE ITEMS
4.1 Prior to contract approval, provide the vehicle(s) make/model along with OEM lifting point identification per section 3.3 outlining lifting points to PSNS & IMF Lifting and Handling Department (Department 700 Code 740).
4.2 Certification that all pre-delivery checks of section 3.10 were performed and all unsatisfactory items were corrected.
4.3 Emergency point of contact to coordinate repairs as described in above paragraph 3.14 .
5 GOVERNMENT-FURNISHED ITEMS – PROPERTY, MATERIAL, EQUIPMENT, SERVICES
5.1 The government will provide crane lifting and handling services as required for the vehicle(s).
5.2 The government will provide lifting and handling forklift attachments detailed below:
5.2.1 NAVAIR Swab and Scrapper Assembly - towing capacity 500 lbs.
5.2.2 NAVAIR Catapult Cylinder Strong-backs and Lifters - 5,000 lbs. capacity at 24” load center.
5.2.3 Morse Model 285XGR Single Drum Barrel Lifter - 2,500 lbs. capacity.
5.2.4 Lift-O-Matic Dual Drum Lifter - 2,000 lbs. capacity
5.2.5 Hercules 5410 Barrel Lifter - 1,500 lbs. capacity
5.2.6 Wesco Single Poly Drum Lifter - 1,000 lbs. capacity
5.2.7 Wesco Single Drum Lifter - 1,000 lbs. and 1,500 lbs. capacity
5.2.8 Caldwell Single Hook Beam 10S-2-20 - 4,000 lbs. capacity
5.2.9 Caldwell Single Hook Beam 10S-5-24 - 10,000 lbs. maximum capacity (Not be used in excess of 6,000 lbs. at 24” load center).
5.2.10 Caldwell Single Hook Beam 10S-7.5-36 - 15,000 lbs. capacity (Not be used in excess of 6,000 lbs. at a 24” load center)
5.2.11 Forklift Boom Extension - maximum capacity 4,000 lbs. at 36” load center (Load center is based on the distance to the center-of-gravity of the load from the backrest of the forklift forks).
5.2.12 OWTS Small Roto-bins - maximum capacity 1,300 lbs.
5.2.13 Two Cubic Yard Roto-bins - maximum capacity 2,400 lbs.
5.2.14 Additional forklift attachments may be provided by the government with approval from the Puget Sound Naval Shipyard and Intermediate Maintenance Facility Rigging Engineering Branch (PSNS&IMF, Department 700, and Code 715).
5.3 The government will provide all required employees for vehicle operation.
5.4 The government will provide all fuel and personnel/equipment vehicle refueling.
5.5 The government will perform a pre- and post-operational safety inspection of the vehicle(s) as part of daily use. If the vehicle is defective, needs repair or maintenance or found to be otherwise unsafe it will be removed from service and the contractor notified.
5.6 If the vehicle is involved in an accident or mishap it will be removed from service and the contractor will be notified. Contractor will inspect and provide a condition found report to the Contracting Officer for any damage as a result of accident.
6 QUALITY ASSURANCE SURVEILLANCE PLAN.
| Primary Performance Objectives |
| Performance Standard/AQL |
| Performance Assessment Method |
| Contractor to deliver and pick-up Forklift and provide inspection documents in a timely manner |
| 100% of the services performed and documents submitted |
| Timely delivery will be tracked by Contracting Officer |
| Contractor to provide Forklift repairs within 8 hours of notification by Government or provide replacement unit in a timely manner |
| 100% of repairs/replacements completed in a timely manner |
| Contracting Officer will assess compliance with reviews completed monthly |
| Contractor to perform scheduled maintenance of Forklift in a timely manner |
| 100% of scheduled maintenance completed in a timely manner |
| Contracting Officer will assess compliance with reviews completed monthly |
| Contractor to maintain close liaison and good communication with the Government |
| Any problem or questions encountered by either party are addressed within 24 hours |
| Government will assess compliance through coordination between the Contracting Officer |
7 SECURITY REQUIREMENTS.
7.1 Contractor representative(s) will require base access to the Puget Sound Naval Shipyard Controlled Industrial Area (PSNS CIA). Vendor shall notify the Contracting Officer, para. 9.1, Ten days prior to arriving at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, Bremerton, WA.
8 TRAVEL REQUIREMENTS.
8.1 The contractor shall arrange delivery to and from the delivery location. Delivery location will be Puget Sound Naval Shipyard and Intermediate Maintenance Facility, Bremerton, WA Transportation Bldg 455 1400 Farragut Ave.
9 GOVERNMENT REPRESENTATIVE.
9.1 Contracting Officer (KO): __________________
9.2 Contracting Officer Representative (COR):
9.3 Project Point of Contact:
9.4 Engineering Point of Contact:
10 ENVIRONMENTAL AND SAFETY.
10.1 Comply with all federal, state and local laws, regulations and best practices in relation to establishing and maintaining a compliant safety program.
11 ADDITIONAL CONSIDERATIONS.
11.1 Government Supported Work Hours: All deliveries will be scheduled for accomplishment between the hours of 8:00AM and 3:00PM, Monday through Friday unless one of these days is a federal holiday.
11.2 Technical Clarifications: All technical clarifications/deviations will be coordinated through the Contracting Officer Representative, identified in para. 9.1.
11.3 Delivery and Shipping Requirements: The contractor shall inform the Contracting Officer Representative of the specific time and date of Forklift delivery.