About this file

General Outline of the Work Anticipated to be Completed Under the Expected ERP

View the file

Other files for this federal contract opportunity

Other files attached to US Navy Submarine FY19 ERP, newest first.
File Type Posted
Enclosure_2_Preliminary_specification_package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 1 | Page 1

Enclosure 1: General outline of the work anticipated to be completed under the expected ERP.

A. General

a. Estimated Man-Days and Budget:

- Estimated Man-Days: 25,000 – 30,000

- Estimated Budget: $20,000,000 - $30,000,000

b. Availability Particulars:

- Anticipated Period of Performance: February 2019 – May 2020

- Availability type: Chief of Naval Operations (CNO) Maintenance Availability, Dry Docking

- Badging requirement: PSNS&IMF “Green” badge

B. The scope of work will include a significant amount of work across multiple trades and spaces.

The awarded contractor must be able to provide a production schedule that can be incorporated with the Government production schedule and have the capability to provide schedule changes to meet the Government’s Key Events and Milestones as the overall schedule shifts. As well as management of Long Lead Time Material (LLTM) Procurement, etc. Key trades & efforts include:

preservation/touch up, hull and structural repair, anode removal, sound damping tile removal and safety track repair requirements.

C. The Availability’s maintenance requirements are expected to include the following types of work:

Hull Structure

- Condition-based repair and replacement of interior and exterior hull and structure areas.

- Condition-based repair and replacement of free flood lead bins in the Forward Main Ballast Tanks

- Preserve interior and exterior hull and superstructure,

- Preserve Fairwater (Sail) exterior and interior

- Preserve interior tanks

- Removal of sound damping tile interior and exterior hull, structure areas and tanks

- Removal of anodes interior and exterior hull, structure areas and tanks.

- Preserve forward MBTs