Preliminary Work Specification Package

View the file

Other files for this federal contract opportunity

Other files attached to US Navy Submarine FY19 ERP, newest first.
File Type Posted
Sources_Sought_-Enclosure_1-30May_(Final_Draft).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NWRMC (NMD)

PRELIMINARY SPECIFICATION

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: NWRMC-501-19

INCLUDES ALL CHANGES THROUGH 5/25/2018

PRELIMINARY SPECIFICATION

INDEX

NWRMC-501-19

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-19 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 10/01/2017

009-02 Environmental Compliance Reports for Material Usage at Naval Facility; accomplish 11/18/2016

009-03 Toxic and Hazardous Substance; control 10/01/2017

009-04 Quality Management System; provide 10/01/2017

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

11/18/2016

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 10/01/2017

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2017

009-10 Asbestos-Containing Material (ACM); control 11/18/2016

009-18 Magnetic Material; control 03/07/2017

009-19 Provisioning Technical Documentation (PTD); provide 07/30/2015

009-20 Government Property; control 10/01/2017

009-21 Logistics and Technical Data; provide 10/01/2017

009-23 Interference; remove and install 10/01/2017

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 10/01/2017

009-29 CANCELLED 07/29/2004

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 11/18/2016

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

11/18/2016

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2017

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

10/01/2017

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-67 Integrated Total Ship Testing; manage 10/01/2017

009-69 Heavy Weather/Mooring Plan; provide 10/01/2017

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

11/18/2016

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2017

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2017

009-74 Occupational, Safety and Health Plan; accomplish 10/01/2017

009-80 Ship Facilities; maintain 11/18/2016

009-81 Compartment Closeout; accomplish 10/01/2017

009-82 Installation of Equal Component Vice Specified Component; report 11/18/2016

009-84 Threaded Fastener Requirements; accomplish 10/01/2017

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

11/18/2016

009-94 CANCELLED 11/18/2016

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

ITEM_NO. TITLE DATE

009-99 Ship Departure Report; provide 07/18/2014

009-100 Ship's Stability; maintain 10/01/2017

009-101 Ship Transit and Berthing; accomplish 11/18/2016

009-102 CANCELLED 10/01/2017

009-103 Weight and Moment Change Data; provide 07/18/2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017

009-108 CANCELLED 11/18/2016

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

11/18/2016

009-117 Combat Systems, Light-Off Suport; provide 11/18/2016

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Event; manage 10/01/2017

009-122 Temporary Padeye; install and remove 10/01/2017

CATEGORY II. FY-19 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-32 Cleaning and Painting Requirements; accomplish 03/07/2017

SHIP: ITEM NO: 042-10-001

COAR: 16 PCN: SERV-L001

CMP: NONE

PLANNER: WRIGHT , ANNA

COOPER, DANIEL

SSP: NWRMC-501-19 1 of 2 ITEM NO: 042-10-001

1. SCOPE:

1.1 Title: Work Place Requirements

1.2 Location of Work:

1.2.1 ,Puget Sound Naval Shipyard and Intermediate Maintenance Facility(PSNS & IMF)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items , (FY19)

2.2 099-060NW, Schedule and Associated Reports for Aircraft Carrier (CVN) Availabilities at Puget Sound Naval Shipyard Over 9 Weeks in Duration; provide and manage

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 for schedule and associated reports.

3.2 Contractor work schedule and work breakdown structure shall coincide with PSNS & IMF work specified in Attachment A.

3.3 Project Work Place Requirements:

3.3.1 Perform touch up preservation identified in the preservation work items.

3.3.1.1 The estimated touch up square footage is 1,850 Square feet, to be accomplished across all preservation work items.

3.3.2 Perform structural repair work identified in the structural repair work items.

3.3.2.1 The estimated weld repair is 56,720 Square inches, to be accomplished across all weld repair work items.

3.3.3 Perform sound damping removal identified in the sound damping work items.

3.3.3.1 The estimated sound damping tile to be removed is 4,400 Square feet, to be accomplished across all sound damping work items items.

3.3.4 Each contractor employee requiring access to the ship shall be required to attend a mandatory project indoctrination briefing approximately 2 hours long.

3.3.4.1 Contact SUPERVISOR for times and locations. Briefing

includes Project Introduction, Environmental Safety & Health, Gas Free/Confined Space Briefing, Submarine Orientation, Shipboard Fire Safety Control, Cleanliness and Material Tracking. Employees shall sign the Employee Introduction Training Roster after

SHIP:

SSP: NWRMC-501-19 2 of 2 ITEM NO: 042-10-001 completion of the training.

3.3.5 Notify the SUPERVISOR via email, 72 hours before vehicle escort is required.

3.3.5.1 Email shall include company name, drivers name, phone number, estimated arrival date, estimated arrival time and what is being delivered.

4. NOTES:

4.1 The term "SUPERVISOR" is defined as CODE 400 Project Maintenance Team.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

HAZMAT

SHIP: ITEM NO: 077-10-001

COAR: 16 PCN: SSPS-L001

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 2 ITEM NO: 077-10-001

1. SCOPE:

1.1 Title: Contractor Environmental and Hazardous Waste Management Program; provide

1.2 Location of Work:

1.2.1 Puget Sound Naval Shipyard and

Intermediate Maintenance Facility

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items , (FY19)

2.2 099-06NW, General Contractor Waste Management Requirements for Bremerton Naval Complex (BNC); accomplish

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 for Contractor Waste Management Requirements for Bremerton Naval Complex.

3.1.1 Submit one Legible copy, electronic media, of a report listing the following information to the Contracting Officer's Representative (COR) no later than one day prior to the Availability start date(A- 1), using 2.1 through 2.2 as follows:

3.1.1.1 Contractor's plan to control generation of hazardous

waste materials.

3.1.1.2 Names, titles, and contract information of management personnel, in charge of the contractor's environmental, safety, and hazardous waste programs.

3.1.1.3 Contractor's method for accounting of hazardous waste materials, from generation until transported, to the Government's facility.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SSP: NWRMC-501-19 2 of 2 ITEM NO: 077-10-001

HAZMAT

SHIP: ITEM NO: 077-11-001

COAR: 16 PCN: SSPS-L002

SWT FILE NO: 077-001 CMP: NONE

REVISED: 07 Nov 2017 PLANNER: WRIGHT , ANNA

COOPER, DANIEL

SSP: NWRMC-501-19 1 of 4 ITEM NO: 077-11-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Puget Sound Naval Shipyard and Intermediate

Maintenance Facility (PSNS & IMF)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items , (FY19)

2.2 Resource Conservation and Recovery Act, (RCRA)

2.3 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act

2.4 Applicable Hazardous Waste, Manifest Form

2.5 10 U.S.C., 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 through 2.5.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.5 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.2 and 2.4, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of 2.5 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.2 and 2.4, using EPA or delegated state environmental agency identification number in accordance with 2.5.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented

SSP: NWRMC-501-19 2 of 4 ITEM NO: 077-11-001 to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.3, and 3.2.3.

3.5 Hazardous waste, as identified in 2.2, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________

SSP: NWRMC-501-19 3 of 4 ITEM NO: 077-11-001 spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Carbohydrazide _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ ___19AL___

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Ignitable)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________

__182GAL___

Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)

Paints (May include lead, cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludge (Contaminated with _____ ____________ __________

SSP: NWRMC-501-19 4 of 4 ITEM NO: 077-11-001 a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Ventilation Debris/Residue

(heavy metals, e.g., cadmium, chromium) _____ ____________ __________

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 111-11-001

COAR: 16 PCN: SSPS-L004

CMP: NONE

PLANNER: WRIGHT , ANNA

COOPER, DANIEL

SSP: NWRMC-501-19 1 of 6 ITEM NO: 111-11-001

1. SCOPE:

1.1 Title: Superstructure Group 2; repair

1.2 Location of Work:

1.2.1 Superstructure Group 2, Frame 62 to Frame 71

1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 111-4642843 Rev F, Superstructure Frames 51-83

2.6 111-4642842 Rev E, Superstructure Frames 51–83 Material & General Notes

2.7 111-4642856 Rev G, Superstructure Main Deck Frames 51-83

2.8 111-4642855 Rev J, Superstructure Main Deck Frames 51-83 Material & General Notes

2.9 845-2445497 Rev J, Hanger Standard, Clamps & Blocks Material

2.10 320-4679075 Rev G, External Wireways FR 50 Thru FR 87 L/M Ref & Plan View

2.11 320-4679076 Rev H, External Wireways FR 50 Thru FR 87 Sections, Elev & Details

2.12 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

2.13 SMS 6350-081-001, Inspect; repair vibration damping.

2.14 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.15 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection with the government to verify the

SSP: NWRMC-501-19 2 of 6 ITEM NO: 111-11-001 locations of structural repairs identified in Attachment- A, provided by the SUPERVISOR.

3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4 using 2.5 through 2.11 for guidance.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions.

3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.

3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to

SUPERVISOR.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.4 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 After completion of weld repairs at the location listed in Attachment A.

(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"

3.2.5 Accomplish nondestructive magnetic particle testing in

accordance with 2.2 through 2.4.

3.2.5.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.6 Submit one legible copy, in approved transferrable media, of final repair report Attachment- A, and any Objective Quality Evidence (OQE) required by 2.2 to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Provide notification to the Supervisor when access to the external surfaces of the superstructure is accessible to re-map after weld repairs.

3.3.1 Accomplish repairs to the re-mapped surfaces not accepted by PSNS Code 290 in accordance with 2.2 through 2.12.

3.4 Remove existing insulation and Sound damping in way of weld repairs from each location listed in 1.2, using 2.13 for guidance.

3.4.1 Remove all tile/insulation remnants, glue and corrosion products.

3.4.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.

3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.14 and 2.15.

3.5.1 Do NOT grind below the valleys of the welded areas.

3.6 Accomplish the requirements of 2.12 Enclosure (2) for Strip back distances for heat sensitive material.

SSP: NWRMC-501-19 3 of 6 ITEM NO: 111-11-001

4. NOTES:

4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment- A.

4.2 PSNS Code 290 will provide initial mapping measurements to the contractor.

4.3 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.

4.3.1 PSNS engineering requires 24 hour advance notice for POA inspections.

4.4 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.

4.5 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.

4.6 Contractor will procure materials not listed in paragraph 5, to accomplish the work as defined in this work item.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 30 FT

BAR, METAL, FLAT

STL

0.250X2.0001/4"

X 2" X 10' MAX

LG, 1.7 LB/LIN

FT, STEEL, ASTM

A36/A36M

Varies per referenc e

NIIN 15-

239-C003

2. 40 FT

BAR, METAL,

ROUND 1-1/4"

DIA. 4.172

LB/LIN FT,

STEEL-

CARBON,GRADE

NIIN#16-

225-C002

3. 1 PM

PLATE, METAL,

72" X 120"3/16"

THK; 7.65 LB/SQ

FT, STEEL GRADE-

DH36 CLASS-U,

NIIN#16-

089-C011

SSP: NWRMC-501-19 4 of 6 ITEM NO: 111-11-001

HIGHER-STRENGTH-

ABS GR-DH36

4. 1 PM

JML DOCUMENT #

6069-0065PLATE,

METAL, 1/4"

THICK, 96" X

240"STEEL GRADE-

DH36 CLASS-U,

HIGHER-

STRENGTHCLAUSE

ST "V-1" RN ABS

GR-DH36 Various NA

5. 1 PM

PLATE, METAL

5/16" THK X 96"

WD X 120” LG, 50

SQ FT/PM, 12.76

LB/SQ FTSTEEL

GRADE-DH36

CLASS-U, HIGHER-

STRENGTH-

STRUCTURALC542

RN ABS GR-DH36 Various

NIIN 15-

272-C007

6. 1 PM

PLATE,METAL 3/8"

THK X 96" W X

240” LG 160 SQ

FT/PM 15.3 LB/SQ

FTSTEEL GRADE-

DH36, CLASS-U,

HIGHER-STRENGTH-

STRUCTURALCLAUSE

STANDARD "U" RN

ABS GR-DH36 Various

NIIN 00-

224-3089

7. 1 PM

PLATE,

NORMALIZED HEAT

TREAT IS NOT

REQD INSP-2 RIP-

571/2" THK X 96"

WD X 240” LG,

20.4 LB/SQ

FTSTEEL GRADE-

DH36, HIGHER

STRENGTH Various

NIIN#00-

224-3091

8. 1 PM

CARBON STEEL

PLATE, 3/4" X

96" X 396", DH36

PER ABS Various

NIIN 00-

224-3093

9. 1 PM

PLATE, METAL

INSP-2 RIP-571"

THK X 96" WD X

240” LG, 160 SQ

FT/PM , 40.8

LB/SQ FT Various

NIIN 15-

295-C002

SSP: NWRMC-501-19 5 of 6 ITEM NO: 111-11-001

10. 1 PM

BAR, PLATE,METAL

INSP-2 RIP-

573/8" THK X 72"

WDX 240” LG, 120

SQ FT/PM,15.3

LB/SQ FT ALLOY

STEEL GRADE-

HY80,HIGH-YIELD-

STRENGTH-

STRUCTURAL Various

NIIN 06-

164-A001

11. 10 FT

CHANNEL, METAL,

5" X 9# X 10'LG.

HIGHER STRENGTH-

STRUCTURAL,

GRADE: AH36,

ABS. Various NA

12. 240 FT

ANGLE,

STRUCTURAL STL

4.000X4.000X0.25

0 INSP-2 RIP-

574" X 4" X 1/4"

THK,6.6 LB/LIN

FTSTEEL GRADE-

AH36 HIGHER

STRENGTHCLASS-

UC542 RN ASTM

A36/A36M-89 Various

NIIN 01-

023-9272

13. 50 FT

JML DOCUMENT #

3081-9644ANGLE,

STRUCTURAL STL

5.000X5.000X0.31

2 INSP-2 RIP-

575" X 5" X

5/16" THK, 10.3

LB/LIN FTSTEEL

GRADE-AH36

CLASS-U, HIGHER

STRENGTH

STRUCTURAL Various

NIIN 01-

025-1382

14. 100 FT

ANGLE, 4 X 4 X

3/8 THK X 20',

HSS, ABS GR-AH36 Various NA

15. 1 PM

HY-80, 0.500"

THICK. 96"X 240”

LG Various

NIIN 00-

554-0874

16. 60 FT

ANGLE,

STRUCTURAL STL

2.500X2.500X0.25

0 INSP-2 RIP-

572-1/2" X 2-

1/2" X 1/4" THK

X 20' LG, 4.1

LB/LIN

Various NA

SSP: NWRMC-501-19 6 of 6 ITEM NO: 111-11-001

FTSTRUCTURAL

STEEL

17. 140 FT

ANGLE,

STRUCTURAL STL

3" X 3" X 3/16"

THK X 20' LG,

3.71 LB/LIN

FTSTEEL GRADE-

AH36 CLASS-U,

HIGHER-STRENGTH-

STRUCTURAL Various NA

SHIP: ITEM NO: 111-11-002

COAR: 16 PCN: SSPS-L005

CMP: NONE

PLANNER: WRIGHT , ANNA

COOPER, DANIEL

SSP: NWRMC-501-19 1 of 3 ITEM NO: 111-11-002

1. SCOPE:

1.1 Title: Superstructure Group 10; repair

1.2 Location of Work:

1.2.1 Superstructure Group 10 Frame 105 to Frame 118

1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 111-4642859 Rev D, Superstructure Main Deck Frames 93-106

2.6 111-4642846 Rev G, Superstructure Frames 93-106

2.7 111-4642860 Rev E, Superstructure Main Deck Frames 107-117

2.8 111-4642849 Rev G, Superstructure Frames 107-117

2.9 111-4775429 Rev F, Superstructure Frames 118-AFT

2.10 111-4642861 Rev F, Superstructure Main Deck Frames 118-AFT

2.11 111-4642835 Rev C, Superstructure Typical Details

2.12 113-4789068 Rev H, 113-4789068 Rev H, FDN Cleat Box Aft

2.13 113-4789212 Rev D, FDN Cleat Box Aft Details Sheet 02

2.14 SMS 6350-081-001, Inspect; repair vibration damping.

2.15 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.16 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

2.17 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

locations of structural repairs identified in Attachment- A, provided by

SSP: NWRMC-501-19 2 of 3 ITEM NO: 111-11-002 the SUPERVISOR.

3.2 Accomplish repairs of areas identified in Attachment A, in accordance with 2.1 through 2.4 using 2.5 through 2.13 for guidance.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions.

3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.

3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to

SUPERVISOR.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.4 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 After completion of weld repairs at the location listed in Attachment A

(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"

3.2.5 Accomplish nondestructive magnetic particle testing in

accordance with 2.2. through 2.4.

3.2.5.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.6 Submit one legible copy, in approved transferrable media, of final repair report Attachment- A, and any Objective Quality Evidence (OQE) required by 2.2 to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Remove existing insulation and Sound damping in way of weld repairs from each location listed in 1.2, using 2.14 for guidance.

3.3.1 Remove all tile/insulation remnants, glue and corrosion products.

3.3.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.

3.4 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.15 and 2.16.

3.4.1 Do NOT grind below the valleys of the welded areas.

3.5 Accomplish the requirements of 2.17 Enclosure (2) for Strip back distances for heat sensitive material.

4. NOTES:

4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment- A.

4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.

SSP: NWRMC-501-19 3 of 3 ITEM NO: 111-11-002

4.2.1 PSNS engineering requires 24 hour advance notice for POA inspections.

4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.

4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.

4.5 Contractor will procure materials not listed in paragraph 5 of work item 111-11-001 to accomplish the work as defined in this work item.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

GAS FREE CERTIFICATION REQUIRED

SHIP: ITEM NO: 123-11-001

COAR: 16 PCN: SSPS-L006

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 3 ITEM NO: 123-11-001

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 1A; repair

1.2 Location of Work:

1.2.1 MBT 1A

1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27

2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS

2.7 101-4640631 Rev H, CENTERLINE LONG'L BHD FRAMES 4-15

2.8 101-4640625 Rev H, MBT 1A & 1B BHD FRAMES 4, 5, & 6

2.9 101-4640626 Rev C, NON PRESSURE HULL FRAMES 7, 8, & 9

2.10 101-4640627 Rev F, MBT BHD 10 & NP HULL FR 11

2.11 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

2.12 SMS 6350-081-001, Inspect; repair vibration damping

2.13 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.14 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment- A, provided by the SUPERVISOR.

3.2 Accomplish repairs of areas identified in Attachment- A, in

SSP: NWRMC-501-19 2 of 3 ITEM NO: 123-11-001 accordance with 2.1 through 2.4, using 2.5 through 2.10 for guidance.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions.

3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.

3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to

SUPERVISOR.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.4 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 After completion of weld repairs at the location listed in Attachment A

(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"

3.2.5 Accomplish nondestructive magnetic particle testing in

accordance with 2.2.through 2.4.

3.2.5.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.6 Submit one legible copy, in approved transferrable media, of final repair report Attachment- A, and any Objective Quality Evidence (OQE) required by 2.2 to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Accomplish the requirements of 2.11 Enclosure (2) for Strip back distances for heat sensitive material.

3.4 Remove existing insulation and Sound damping in way of weld repairs from each location listed in 1.2, using 2.12 for guidance.

3.4.1 Remove all tile/insulation remnants, glue and corrosion products.

3.4.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.

3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.13 and 2.14.

3.5.1 Do NOT grind below the valleys of the welded areas.

4. NOTES:

4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment- A.

4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.

4.2.1 PSNS engineering requires 24 hour advance notice for POA inspections.

SSP: NWRMC-501-19 3 of 3 ITEM NO: 123-11-001

4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.

4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.

4.5 Contractor will procure materials not listed in paragraph 5 of work item 111-11-001 to accomplish the work as defined in this work item.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 123-11-002

COAR: 16 PCN: SSPS-L007

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 3 ITEM NO: 123-11-002

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 2A; repair

1.2 Location of Work:

1.2.1 MBT 2A

1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27

2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS

2.7 101-4640631 Rev H, CENTERLINE LONG'L BHD FRAMES 4-15

2.8 101-4640627 Rev F, MBT BHD 10 & NP HULL FR 11

2.9 101-4640628 Rev F, NON PRESSURE HULL FRAMES 12, 13, & 14

2.10 101-4640629 Rev F, MAIN BALLAST TANK BULKHEAD 15 AND NON-PRESSURE

HULL FRAME 16

2.11 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

2.12 SMS 6350-081-001, Inspect; repair vibration damping

2.13 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.14 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment- A, provided by the SUPERVISOR.

3.2 Accomplish repairs of areas identified in Attachment- A, in

SSP: NWRMC-501-19 2 of 3 ITEM NO: 123-11-002 accordance with 2.1 through 2.4, using 2.5 through 2.10 for guidance.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions.

3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.

3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to

SUPERVISOR.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.4 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 After completion of weld repairs at the location listed in Attachment A

(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"

3.2.5 Accomplish nondestructive magnetic particle testing in

accordance with 2.2. through 2.4.

3.2.5.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.6 Submit one legible copy, in approved transferrable media, of final repair report Attachment- A, and any Objective Quality Evidence (OQE) required by 2.2 to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Accomplish the requirements of 2.11 Enclosure (2) for Strip back distances for heat sensitive material.

3.4 Remove existing insulation and Sound damping in way of weld repairs from each location listed in 1.2, using 2.12 for guidance.

3.4.1 Remove all tile/insulation remnants, glue and corrosion products.

3.4.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.

3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.13 and 2.14.

3.5.1 Do NOT grind below the valleys of the welded areas.

4. NOTES:

4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment- A.

4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be accomplished by PSNS of the area under the tile/insulation.

4.2.1 PSNS engineering requires 24 hour advance notice for POA inspections.

SSP: NWRMC-501-19 3 of 3 ITEM NO: 123-11-002

4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.

4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.

4.5 Contractor will procure materials not listed in paragraph 5 of work item 111-11-001 to accomplish the work as defined in this work item.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 123-11-003

COAR: 16 PCN: SSPS-L008

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 3 ITEM NO: 123-11-003

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 3A; repair

1.2 Location of Work:

1.2.1 MBT 3A

1.2.1.1 Superstructure (plating and framing to include hangers, hand grabs, foundations)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 100-4640663 Rev G, NON-PRESSURE HULL PLATING FRAME 6 – 27

2.6 101-4640664 Rev F, NON-PRESSURE HULL PLATING FRAME 6-27 DETAILS

2.7 101-4640630 Rev G, NON-PRESSURE HULL 17, 18, 19

2.8 101-4640632 Rev G, CL LONG BHD FRS 15 – 25

2.9 101-4640558 Rev L, PRESSURE HULL FRS 23 – 25

2.10 100-4642351 Rev E, PENETRATIONS NON PRESSURE HULL BOW FR 94 DETAILS

2.11 515-4695737 Rev E, MBT 1, 2 & 3 VENT VALVE HOUSING & DETAIL – SSBN

TRIDENT CLASS

2.12 101-4640634 Rev E, NON PRESSURE HULL FRS 20 – 22

2.13 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

2.14 SMS 6350-081-001, Inspect; repair vibration damping

2.15 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.16 4788576 Rev D , SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

SSP: NWRMC-501-19 2 of 3 ITEM NO: 123-11-003 locations of structural repairs identified in Attachment- A, provided by the SUPERVISOR.

3.2 Accomplish repairs of areas identified in Attachment- A, in accordance with 2.1 through 2.4, using 2.5 through 2.12 for guidance.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions.

3.2.2 Repair work shall be sequenced to minimize warping, buckling and other deformations during hot work operations.

3.2.3 Unidentified dented or deformed pressure hull and/or tank structure shall be reported within 48 hours of discovery to

SUPERVISOR.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.4 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 After completion of weld repairs at the location listed in Attachment A

(I)(G) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"

3.2.5 Accomplish nondestructive magnetic particle testing in

accordance with 2.2 through 2.4.

3.2.5.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.6 Submit one legible copy, in approved transferrable media, of final repair report Attachment- A, and any Objective Quality Evidence (OQE) required by 2.2 to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Accomplish the requirements of 2.13 Enclosure (2) for Strip back distances for heat sensitive material.

3.4 Remove existing insulation and Sound damping in way of weld repairs from each location listed in 1.2, using 2.14 for guidance.

3.4.1 Remove all tile/insulation remnants, glue and corrosion products.

3.4.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing locations of tile/insulation documented in a 3 dimensional fashion including number of tile removed and square footage to the SUPERVISOR.

3.5 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.15 and 2.16.

3.5.1 Do NOT grind below the valleys of the welded areas.

4. NOTES:

4.1 PSNS engineering will inspect the structure located in 1.2.1 and provide a list of areas requiring repair using Attachment- A.

4.2 Tile/insulation removed in way of hot work or for any reasons is considered a Previously Obscure Area (POA). Inspection is required to be

SSP: NWRMC-501-19 3 of 3 ITEM NO: 123-11-003 accomplished by PSNS of the area under the tile/insulation.

4.2.1 PSNS engineering requires 24 hour advance notice for POA inspections.

4.3 Area listed in 1.2 will not be released to the contractor for final blast and paint until PSNS (Code 250VS) engineering has verified that all reporting information has been provided for all defects previously submitted for contractor repair.

4.4 PSNS engineering requires 3 working days to complete review after final repairs are completed and Attachment A is submitted.

4.5 Contractor will procure materials not listed in paragraph 5 of work item 111-11-001 to accomplish the work as defined in this work item.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ITEM NO: 151-11-001

COAR: 16 PCN: SSPS-L046

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 3 ITEM NO: 151-11-001

1. SCOPE:

1.1 Title: Group 2 Safety Track; repair

1.2 Location of Work:

1.2.1 Main Deck Safety Track, Frames 62-71 (Group 2)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) 7650-081-091 Rev D, Chg 3, Submarine Structural Inspection and Repairs

2.5 111-4642856 Rev G, SSBN Trident Class Superstructure Main Deck Frs 51 to 83

2.6 605-4645173 Rev J, SSBN Trident Class Label Plates Structural

2.7 605-4645174 Rev K, SSBN Trident Class Label Plates Structural

2.8 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION DETAILS

2.9 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

2.10 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection to verify structural repairs locations, identified in Attachment A.

3.2 Accomplish repairs identified using Attachment A in accordance with

2.1 through 2.4 using 2.5 through 2.9 for guidance.

3.2.1 Template exact sizes, locations, and configurations from existing shipboard conditions.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.2 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 after completion of weld repairs at the location listed in Attachment A.

(I)(G) "NONDESTRUCTIVE TESTINGMAGNETIC PARTICLE"

SSP: NWRMC-501-19 2 of 3 ITEM NO: 151-11-001

3.2.3 Accomplish nondestructive magnetic particle testing in

accordance with 2.2 through 2.4.

3.2.3.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.4 Paint used in the manufacturing of Label plates shall be in accordance with MIL-PRF-24635, Type 2, Class 1, Grade A.

3.2.5 Submit one legible copy, in approved transferrable media, of a report to include Attachment A and any additional OQE required by 2.2, to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.8 and 2.9.

3.3.1 Do NOT grind below the valleys of the welded areas.

3.4 Accomplish the requirements of 2.10 Enclosure (2) for Strip back distances for heat sensitive material.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Puget Sound Naval Shipyard (PSNS) will provide a list of areas requiring repair to the contractor using Attachment A.

4.2 Procure material not already identified as Government Furnished Material (GFM) in this work item to accomplish this work.

4.3 Preservation of the repaired Safety Track will be on a separate Work Item.

4.4 PSNS will perform the Strength Pull Test and Operational Test of the repaired safety track.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 120 FT

JML DOCUMENT #

81099425 I BEAM

, 3 X2-3/8 X5.7

LB (S 3 X 5.7),

STRUCTURAL,

HIGHER STRENGTH

STEEL , GR AH-

36, CL-U, ABS

Various

NIIN 16-

061-C003

SSP: NWRMC-501-19 3 of 3 ITEM NO: 151-11-001

RULES

2. 2 SF

JML DOCUMENT #

81099424, 3/16"

THK PLATE,

STEEL, GRADE N,

SUPERCEDED BY

MIL-S-24698, DH-

36 1-101

NIIN16-

060-C002

3. 1 SF

JML DOCUMENT #

81099426, 3/8"

THK PLATE,

STEEL, GRADE N

SUPERCEDED BY

MIL-S-24698, DH-

36 Various

NIIN16-

060-C001

4. 1 SF

JML DOC #

81099421 SHEET

METAL NI-CU

0.062" THK,

NICKEL COPPER

CLASS-A C542 RN

QQ-N-281 CL-A

MFR FEDERAL

INSPECTION FSCM

81348 33 & 34

NIIN 00-

234-2166

5. 100 EA

JML DOC #

81099420 0.164-

32UNC-2AX0.25

FLAT HEAD,

XRECESS DES-1,

82 DEG

COUNTERSUNK,

STAINLESS STEEL

, 300-SERIES,

PASSIVATED, FF-

S-92,MS51959-41,

TY III, STY 2C 35

NIIN 00-

765-4244

SHIP: ITEM NO: 151-11-002

COAR: 16 PCN: SSPS-L047

CMP: NONE

PLANNER: WRIGHT , ANNA

SSP: NWRMC-501-19 1 of 3 ITEM NO: 151-11-002

1. SCOPE:

1.1 Title: Group 10 Safety Track; repair

1.2 Location of Work:

1.2.1 Main Deck Safety Track, Frames 105-118 (Group 10)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) 7650-081-091 Rev D, Chg 3, Submarine Structural Inspection and Repairs

2.5 600-4694412 Rev B, SSBN Trident Class Topside Safety Track Extension

2.6 111-6558972 Rev B, SSBN Trident Class TLA Superstructure Modifications Frames 105-114

2.7 111-4642859 Rev D, SSBN Trident Class Superstructure Main Deck FRs 93-106

2.8 111-4642860 Rev E, SSBN Trident Class Superstructure Main Deck Frs 107 to 117

2.9 111-4642861 Rev F, SSBN Trident Class Superstructure Main Deck Frs

118-AFT

2.10 605-4645173 Rev J, SSBN Trident Class Label Plates Structural

2.11 605-4645174 Rev K, SSBN Trident Class Label Plates Structural

2.12 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION

DETAILS

2.13 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

2.14 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection to verify structural repairs locations, identified in Attachment A.

3.2 Accomplish repairs identified using Attachment A in accordance with

2.1 through 2.4 using 2.5 through 2.14 for guidance.

3.2.1 Template exact sizes, locations, and configurations from

SSP: NWRMC-501-19 2 of 3 ITEM NO: 151-11-002 existing shipboard conditions.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.2.2 Accomplish nondestructive visual inspection in accordance with paragraph 2.2 after completion of weld repairs at the location listed in Attachment A.

(I)(G) "NONDESTRUCTIVE TESTINGMAGNETIC PARTICLE"

3.2.3 Accomplish nondestructive magnetic particle testing in

accordance with 2.2 through 2.4.

3.2.3.1 Submit one legible copy, in approved transferrable

media, of the results of the magnetic particle testing inspections upon completion.

3.2.4 Paint used in the manufacturing of Label plates shall be in accordance with MIL-PRF-24635, Type 2, Class 1, Grade A.

3.2.5 Submit one legible copy, in approved transferrable media, of a report to include Attachment A and any additional OQE required by 2.2, to the SUPERVISOR within 72 hours after completion of the repairs.

3.3 Grind each surface smooth in way of each repair site located in tile installation areas identified in 2.12 and 2.13.

3.3.1 Do NOT grind below the valleys of the welded areas.

3.4 Accomplish the requirements of 2.14 Enclosure (2) for Strip back distances for heat sensitive material.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Puget Sound Naval Shipyard (PSNS) will provide a list of areas requiring repair to the contractor using Attachment A.

4.2 Procure material not already identified as Government Furnished Material (GFM) in work item 151-11-001 to accomplish this work.

4.3 Preservation of the repaired Safety Track will be on a separate Work Item.

4.4 PSNS will perform the Strength Pull Test and Operational Test of the repaired safety track.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: NWRMC-501-19 3 of 3 ITEM NO: 151-11-002

SHIP: ITEM NO: 524-10-001

COAR: 16 PCN: SSPS-L011

CMP: NONE

PLANNER: WRIGHT , ANNA

COOPER, DANIEL

SSP: NWRMC-501-19 1 of 3 ITEM NO: 524-10-001

1. SCOPE:

1.1 Title: Auxiliary Tank 1 (AUX-1); repair

1.2 Location of Work:

1.2.1 AUX Tank 1

1.2.1.1 Tank plating and framing to include hangers, hand grabs, foundations

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2.3 S9086-CH-STM-010/CH-074 Rev 5, Volume 1,Welding and Allied Processes

2.4 Submarine Maintenance Standard (SMS) Rev D, 7650-081-091 Chg 3 Submarine Structural Inspection and Repairs

2.5 520-4687596 Rev C, Manhole Structural Inspection and Repairs

2.6 115-4677726 Rev K, Tank Auxiliary No. 1

2.7 115-4677725 Rev F, Tank Auxiliary Notes & L/M

2.8 SMS 6350-081-001, Inspect; repair vibration damping

2.9 4674661 Rev J, SSBN TRIDENT CLASS SOUND DAMPING INSTALLATION DETAILS

2.10 4788576 Rev D, SSBN TRIDENT CLASS SOUND DAMPING FAIRWATER &

SUPERSTRUCTURE

2.11 UIPI 0770-104, Rel 4, Shipboard Hot Work Precautions

3. REQUIREMENTS:

(V)(G) "VERIFY ATTACHMENT A"

3.1 Accomplish a joint inspection with the government to verify the locations of structural repairs identified in Attachment- A, provided by…