Attachment_2_Draft_Work_Item_List.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
CVN-71 Advance Planning Federal contract opportunity
Solicitation number
N4523A18Q0800
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Draft Work Items - N4523A18Q0800

View the file

Other files for this federal contract opportunity

Other files attached to CVN-71 Advance Planning, newest first.
File Type Posted
Attachment_3_Wage_Determination.docx DOCX document
Attachment_1_SOW_Advanced_Planning.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CVN 71 FY18 PIA - Potential HII Discrete Contracting Candidates
SWLINTitleHII COMMENTSC413 COMMENTSPSNS COMMENTS
551C8502SCD-10168 Loss of machinery space LA isolationYes for out of plant portion. There are 4 valves in plant and 6 out of plantDo drawings support division of work in this manner for this alteration?All valves are in-plant.
211E1511S/A 9612K - Seal Weld the Core Insp Hatch (CIH) Plt 1Yes
211E1512S/A 9612K - Seal Weld the Core Insp Hatch (CIH) Plt 2Yes
211B11011-M-R-17 & 18; Perform preventive maintenance on RV valves #1 plantYes - Need more info -Open/Clean/Inspect and greaseChanged to accepted per telecon 12-1-17.
211B12021-M-R-17 & 18; Perform preventive maintenance on RV valves #2 plantYes - Need more info -Open/Clean/Inspect and greaseChanged to accepted per telecon 12-1-17.
244A1101Shaft guard repair: Excessive corrosion has been identified on the shaft guard on line shaft no. 1 in lower level MMR2 (approximately between frames 171 and 173). The Shaft Guard is piece 22 on Plan 4-D of DWG 4364299. Work scope includes repair or replacement of 2 (EA) Bottom Shaft Guard Assembly Covers and 2 (EA) Top Shaft Guard Assembly Cover.Need more infoChanged to accepted per telecon 12-6-17.
517A3104Reboiler Eddy Current Inspection and Hydrostatic Test & Reboiler Feed Heater Drain Cooler Eddy Current Inspection and Hydrostatic Test
517A3205Reboiler Strength and Integrity Inspection, Reboiler Eddy Current Inspection, Hydrostatic Test ,Strength Test & Reboiler Feed Heater Drain Cooler Eddy Current Inspection and Hydrostatic Test. REQUIRED TO PERFORM 125% OPERATING PRESSURE TUBE SIDE AND SHELL SIDE HYDROSTATIC TESTS OF NO.2 REBOILER AS REQUIRED BY DFS CVN-71-1000-2017Changed to accepted per telecon 12-6-17.
210E9505S/A 9647K - Install Holders for Waste Collection Bottles Plt 1Changed to accepted per telecon 12-6-17.
210E9506S/A 9647K - Install Holders for Waste Collection Bottles Plt 2Changed to accepted per telecon 12-6-17.
255C8505SCD-8244 Elimination of salinity cellChanged to accepted per telecon 12-6-17.
517C8003SCD-10669 1/2" bypass valve install for RB-V33Changed to accepted per telecon 12-6-17.
551C8001SCD-10413 HP/LP piping modChanged to accepted per telecon 12-6-17.
257C8001SCD 17307 - REROUTE RF TRANSFER PUMP CASING VENT TO DIRTY DRAIN FUNNELChanged to accepted per telecon 12-6-17.
254C8015SCD 10780 - INSTALL IMPROVED MAIN & TG FRESHWATER LAY-UP CAPABChanged to accepted per telecon 12-6-17.
212B51128-M-R-28; ES V4/12 Op Check, Plant 1.Changed to accepted per telecon 12-6-17.
212B52228-M-R-28; ES V4/12 Op Check, Plant 2.Changed to accepted per telecon 12-6-17.
513E2605S/A 9656K: Install Louvers in Air Intakes RC Vent Plt 1Yes this is actually considered non-nuc and we could probably subWhy would we use J&A for HII if out of plant and subcontracted?Removed from consideration based on risk assessment by project team.
513E2606S/A 9656K: Install Louvers in Air Intakes RC Vent Plt 1Yes this is actually considered non-nuc and we could probably subWhy would we use J&A for HII if out of plant and subcontracted?Removed from consideration based on risk assessment by project team.
513B2109Inspect and Photo RV System Supply Duct 36 Inch Isolation Valves Plt 1Need more infoRemoved from consideration based on risk assessment by project team.
513B2210Inspect and Photo RV System Supply Duct 36 Inch Isolation Valves Plt 2Need more infoRemoved from consideration based on risk assessment by project team.
321C8002SCD 5796 - LOW VOLTAE SHORE POWER REMOVALChanged to declined by HII-NNS per telecon 12-6-17.
321A1103PORT AFT HVSP CONNECTION BOX HAS BEEN SEVERLY DEGRADED BY OUTSIDE ENVIRONMENT/SHIP FORCE COUNTERMEASURE WASHDOWNChanged to declined by HII-NNS per telecon 12-6-17.
436C8203SCD 10741 - CN & RF SALINITY CELL INSERTION DEPTH CORRECTIONChanged to declined by HII-NNS per telecon 12-6-17.
255C8004SCD 19503 Solenoid valve replacementNo
210E9404S/A 9663K - Remove Excess/Mod Remaining Portable N2 EquipmentChanged to declined by HII-NNS per telecon 12-6-17.
211B11071-M-R-22; Inspect Ppg, Valves & Boundary Components Plt 1Changed to declined by HII-NNS per telecon 12-6-17.
211B11091-M-R-26 - Inspect Legacy Lagging Outside RC , Plant 1Changed to declined by HII-NNS per telecon 12-6-17.
211B12081-M-R-22; Inspect Ppg, Valves & Boundary Components Plt 2Changed to declined by HII-NNS per telecon 12-6-17.
211B12101-M-R-26 - Inspect Legacy Lagging Outside RC, Plant 2Changed to declined by HII-NNS per telecon 12-6-17.
212B81138-M-R-15; Plt 1 Inspect Select Piping for Surface Corrosion;Changed to declined by HII-NNS per telecon 12-6-17.
212B82148-M-R-15; Plt 2 Inspect Select Piping for Surface Corrosion;Changed to declined by HII-NNS per telecon 12-6-17.
214B11056-M-R-9; Inspect RCP Vent Valve Sleeve Fixture, Plt 1.Changed to declined by HII-NNS per telecon 12-6-17.
214B12066-M-R-9; Inspect RCP Vent Valve Sleeve Fixture, Plt 2.Changed to declined by HII-NNS per telecon 12-6-17.
216B410117-M-R-26; Inspect FCR & RAR Bilges Plt 1Changed to declined by HII-NNS per telecon 12-6-17.
216B410317-M-R-24; Inspect/Recoat FCR BilgeWells Above CD ODT Plt1Changed to declined by HII-NNS per telecon 12-6-17.
216B420217-M-R-26; Inspect FCR & RAR Bilges Plt 2Changed to declined by HII-NNS per telecon 12-6-17.
216B420417-M-R-24; Inspect/Recoat FCR BilgeWells Above CD ODT Plt2Changed to declined by HII-NNS per telecon 12-6-17.
874B110317-M-R-17; RC Bilge Well Inspection, PLT 1Changed to declined by HII-NNS per telecon 12-6-17.
874B120417-M-R-17; RC Bilge Well Inspection, PLT 2Changed to declined by HII-NNS per telecon 12-6-17.
264A1202Repair corroded lube oil deck fittingNo
512C8001SCD-6832 HVAC ModNo
631A1101Bilge paintingNo
311C8111S/A 9154 - Turbine Generator Air Water Intrusion Mods Inc 2&3No
311C8212S/A 9154 - Turbine Generator Air Water Intrusion Mods Inc 2&3No
513B210121-M-R-14; Isolation Vlv Operation & Leak Checks Plt 1No, because of test interface
513B220221-M-R-14; Isolation Vlv Operation & Leak Checks Plt 2No, because of test interface
513B210321-M-R-9; Inspect & Test High/Reduce Press RV Air Ppg Plt 1No, because of test interface
513B220421-M-R-9; Inspect & Test High/Reduce Press RV Air Ppg Plt 2No, because of test interface
Accepted by HII-NNS based on initial Market Research.
Accepted or additional information requested by HII-NNS based on initial Market Research, but removed from consideration from Project Team (NAPS, NPE, NCTE).
Declined by HII-NNS based on initial Market Research.

Sheet2

Sheet3

File details come from the government source that posted it.