Attachment_2_Draft_Work_Item_List.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- CVN-71 Advance Planning Federal contract opportunity
- Solicitation number
- N4523A18Q0800
About this file
Draft Work Items - N4523A18Q0800
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_Wage_Determination.docx | DOCX document | |
| Attachment_1_SOW_Advanced_Planning.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CVN 71 FY18 PIA - Potential HII Discrete Contracting Candidates | ||||
| SWLIN | Title | HII COMMENTS | C413 COMMENTS | PSNS COMMENTS |
| 551C8502 | SCD-10168 Loss of machinery space LA isolation | Yes for out of plant portion. There are 4 valves in plant and 6 out of plant | Do drawings support division of work in this manner for this alteration? | All valves are in-plant. |
| 211E1511 | S/A 9612K - Seal Weld the Core Insp Hatch (CIH) Plt 1 | Yes | ||
| 211E1512 | S/A 9612K - Seal Weld the Core Insp Hatch (CIH) Plt 2 | Yes | ||
| 211B1101 | 1-M-R-17 & 18; Perform preventive maintenance on RV valves #1 plant | Yes - Need more info -Open/Clean/Inspect and grease | Changed to accepted per telecon 12-1-17. | |
| 211B1202 | 1-M-R-17 & 18; Perform preventive maintenance on RV valves #2 plant | Yes - Need more info -Open/Clean/Inspect and grease | Changed to accepted per telecon 12-1-17. | |
| 244A1101 | Shaft guard repair: Excessive corrosion has been identified on the shaft guard on line shaft no. 1 in lower level MMR2 (approximately between frames 171 and 173). The Shaft Guard is piece 22 on Plan 4-D of DWG 4364299. Work scope includes repair or replacement of 2 (EA) Bottom Shaft Guard Assembly Covers and 2 (EA) Top Shaft Guard Assembly Cover. | Need more info | Changed to accepted per telecon 12-6-17. | |
| 517A3104 | Reboiler Eddy Current Inspection and Hydrostatic Test & Reboiler Feed Heater Drain Cooler Eddy Current Inspection and Hydrostatic Test | |||
| 517A3205 | Reboiler Strength and Integrity Inspection, Reboiler Eddy Current Inspection, Hydrostatic Test ,Strength Test & Reboiler Feed Heater Drain Cooler Eddy Current Inspection and Hydrostatic Test. REQUIRED TO PERFORM 125% OPERATING PRESSURE TUBE SIDE AND SHELL SIDE HYDROSTATIC TESTS OF NO.2 REBOILER AS REQUIRED BY DFS CVN-71-1000-2017 | Changed to accepted per telecon 12-6-17. | ||
| 210E9505 | S/A 9647K - Install Holders for Waste Collection Bottles Plt 1 | Changed to accepted per telecon 12-6-17. | ||
| 210E9506 | S/A 9647K - Install Holders for Waste Collection Bottles Plt 2 | Changed to accepted per telecon 12-6-17. | ||
| 255C8505 | SCD-8244 Elimination of salinity cell | Changed to accepted per telecon 12-6-17. | ||
| 517C8003 | SCD-10669 1/2" bypass valve install for RB-V33 | Changed to accepted per telecon 12-6-17. | ||
| 551C8001 | SCD-10413 HP/LP piping mod | Changed to accepted per telecon 12-6-17. | ||
| 257C8001 | SCD 17307 - REROUTE RF TRANSFER PUMP CASING VENT TO DIRTY DRAIN FUNNEL | Changed to accepted per telecon 12-6-17. | ||
| 254C8015 | SCD 10780 - INSTALL IMPROVED MAIN & TG FRESHWATER LAY-UP CAPAB | Changed to accepted per telecon 12-6-17. | ||
| 212B5112 | 8-M-R-28; ES V4/12 Op Check, Plant 1. | Changed to accepted per telecon 12-6-17. | ||
| 212B5222 | 8-M-R-28; ES V4/12 Op Check, Plant 2. | Changed to accepted per telecon 12-6-17. |
| 513E2605 | S/A 9656K: Install Louvers in Air Intakes RC Vent Plt 1 | Yes this is actually considered non-nuc and we could probably sub | Why would we use J&A for HII if out of plant and subcontracted? | Removed from consideration based on risk assessment by project team. |
| 513E2606 | S/A 9656K: Install Louvers in Air Intakes RC Vent Plt 1 | Yes this is actually considered non-nuc and we could probably sub | Why would we use J&A for HII if out of plant and subcontracted? | Removed from consideration based on risk assessment by project team. |
| 513B2109 | Inspect and Photo RV System Supply Duct 36 Inch Isolation Valves Plt 1 | Need more info | Removed from consideration based on risk assessment by project team. | |
| 513B2210 | Inspect and Photo RV System Supply Duct 36 Inch Isolation Valves Plt 2 | Need more info | Removed from consideration based on risk assessment by project team. |
| 321C8002 | SCD 5796 - LOW VOLTAE SHORE POWER REMOVAL | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 321A1103 | PORT AFT HVSP CONNECTION BOX HAS BEEN SEVERLY DEGRADED BY OUTSIDE ENVIRONMENT/SHIP FORCE COUNTERMEASURE WASHDOWN | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 436C8203 | SCD 10741 - CN & RF SALINITY CELL INSERTION DEPTH CORRECTION | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 255C8004 | SCD 19503 Solenoid valve replacement | No | |
| 210E9404 | S/A 9663K - Remove Excess/Mod Remaining Portable N2 Equipment | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 211B1107 | 1-M-R-22; Inspect Ppg, Valves & Boundary Components Plt 1 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 211B1109 | 1-M-R-26 - Inspect Legacy Lagging Outside RC , Plant 1 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 211B1208 | 1-M-R-22; Inspect Ppg, Valves & Boundary Components Plt 2 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 211B1210 | 1-M-R-26 - Inspect Legacy Lagging Outside RC, Plant 2 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 212B8113 | 8-M-R-15; Plt 1 Inspect Select Piping for Surface Corrosion; | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 212B8214 | 8-M-R-15; Plt 2 Inspect Select Piping for Surface Corrosion; | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 214B1105 | 6-M-R-9; Inspect RCP Vent Valve Sleeve Fixture, Plt 1. | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 214B1206 | 6-M-R-9; Inspect RCP Vent Valve Sleeve Fixture, Plt 2. | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 216B4101 | 17-M-R-26; Inspect FCR & RAR Bilges Plt 1 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 216B4103 | 17-M-R-24; Inspect/Recoat FCR BilgeWells Above CD ODT Plt1 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 216B4202 | 17-M-R-26; Inspect FCR & RAR Bilges Plt 2 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 216B4204 | 17-M-R-24; Inspect/Recoat FCR BilgeWells Above CD ODT Plt2 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 874B1103 | 17-M-R-17; RC Bilge Well Inspection, PLT 1 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 874B1204 | 17-M-R-17; RC Bilge Well Inspection, PLT 2 | Changed to declined by HII-NNS per telecon 12-6-17. | |
| 264A1202 | Repair corroded lube oil deck fitting | No | |
| 512C8001 | SCD-6832 HVAC Mod | No | |
| 631A1101 | Bilge painting | No | |
| 311C8111 | S/A 9154 - Turbine Generator Air Water Intrusion Mods Inc 2&3 | No | |
| 311C8212 | S/A 9154 - Turbine Generator Air Water Intrusion Mods Inc 2&3 | No | |
| 513B2101 | 21-M-R-14; Isolation Vlv Operation & Leak Checks Plt 1 | No, because of test interface | |
| 513B2202 | 21-M-R-14; Isolation Vlv Operation & Leak Checks Plt 2 | No, because of test interface | |
| 513B2103 | 21-M-R-9; Inspect & Test High/Reduce Press RV Air Ppg Plt 1 | No, because of test interface | |
| 513B2204 | 21-M-R-9; Inspect & Test High/Reduce Press RV Air Ppg Plt 2 | No, because of test interface |
| Accepted by HII-NNS based on initial Market Research. |
| Accepted or additional information requested by HII-NNS based on initial Market Research, but removed from consideration from Project Team (NAPS, NPE, NCTE). |
| Declined by HII-NNS based on initial Market Research. |
Sheet2
Sheet3
File details come from the government source that posted it.