Attachment_J-2_Compensating_Barge_IX-546_5-Price_Proposal_Worksheet.xls
XLS spreadsheet 43 KB Posted
- Attached to
- Maintenance on IX-546 Federal contract opportunity
- Solicitation number
- N4523A17R0012
About this file
Attachment J-2_Compensating Barge IX-546_price proposal worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A17R00120003_Amendment_0003.pdf | ||
| N4523A17R00120002_Amendment_0002.pdf | ||
| IX_546_References.zip | ZIP file | |
| Attachment_J-5_Vessel_Pictures.zip | ZIP file | |
| N4523A-17-R-0012-0001.pdf | ||
| Attachment_J-1_Compensating_Barge_IX-546_Statement_of_Work.pdf | ||
| Exhibit_J-1_-_CDRLs_and_DIDs_A001_through_A022.pdf | ||
| Attachment_J-4_Compensating_Barge_IX-546_Contract_Performance_Data_Sheet.pdf | ||
| N4523A-17-R-0012_Compensating_Barge_IX-546.pdf | ||
| Attachment_J-3_Compensating_Barge_IX-546_Request_for_Clarification_Form.pdf | ||
| SOW_IX_546_-_Draft.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Compensating Barge (IX-546) | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | |||||||||
| 1.5 | Required Documents | $0 | |||||||||
| 1.6 | Progress Meetings | $0 | |||||||||
| 1.7 | Availability Requirements | $0 | |||||||||
| 1.7.1 | Transport Vessel | $0 | |||||||||
| 1.7.2 | Provide Office Space | $0 | |||||||||
| 1.8 | Care of Vessel | $0 | |||||||||
| 1.16.1 | Maintain Preservation OQE Records | $0 | |||||||||
| 1.17.1 | Enviromental/Hazwaste management | $0 | |||||||||
| 1.20 | Gas Free | $0 | |||||||||
| 1.21.1 | Develop & Maintain Test Plan | $0 | |||||||||
| 3.1.1 | Personnel & Equipment | $0 | |||||||||
| 3.1.2 | Docking Procedure | $0 | |||||||||
| 3.1.3 | Blocking Plan | $0 | |||||||||
| 3.1.4 | Crib & Brace Blocking | $0 | |||||||||
| 3.1.5 | Setting & Aligning Blocks | $0 | |||||||||
| 3.1.6 | Docking Conference | $0 | |||||||||
| 3.1.7 | Dock the Vessel | $0 | |||||||||
| 3.1.8 | Post Docking | $0 | |||||||||
| 3.1.9 | Undock the Vessel | $0 | |||||||||
| 3.1.11 | Final Docking Report | $0 | |||||||||
| 3.2.1 | I.D. Distuinguished Figures & Markings | $0 | |||||||||
| 3.2.2 | Rubber Fenders | $0 | |||||||||
| 3.2.3 | Zinc Anodes | $0 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0 | |||||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0 | |||||||||
| 3.2.6 | Hull and Freeboard Ultrasonic Inspection | $0 | |||||||||
| 3.3.1 | Repair Fender Brackets | $0 | |||||||||
| 3.3.2 | Repair Deck Coaming Drain Couplings | $0 | |||||||||
| 3.4.1 | Open, Pump, Clean, Close, Gas Free Tanks | $0 | |||||||||
| 3.4.2 | Tank/Void Visual Inspection | $0 | |||||||||
| 3.4.3 | Identify Color Schemes & Markings | $0 | |||||||||
| 3.4.4 | Preliminary Air Test | $0 | |||||||||
| 3.4.5 | Tank/Void Touch Up Preservation | $0 | |||||||||
| 3.4.6 | Access Cover Blast & Preserve | $0 | |||||||||
| 3.4.7 | Final Air Test | $0 | |||||||||
| 3.4.8 | Tank/Void Pre-Closeout Inspection | $0 | |||||||||
| 3.5.3 | Main Deck Nonskid Repair | $0 | |||||||||
| 3.5.4 | Visual Inspection for Structural Defects | $0 | |||||||||
| 3.5.5 | Ultrasonic Inspection | $0 | |||||||||
| 3.6.1 | Mach Top & Portable Shelter Top Nonskid | $0 | |||||||||
| 3.6.4 | Visual Inspection for Structural Defects | $0 | |||||||||
| 3.6.5 | Ultrasonic Inspection | $0 | |||||||||
| 3.6.6 | Superstructure Preservation | $0 | |||||||||
| 3.11.1 | Sea Valves | $0 | |||||||||
| 3.11.2 | Main Deck Piping UT Inspection | $0 | |||||||||
| 3.11.3 | Main Deck Piping Preservation | $0 | |||||||||
| Column Totals | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.