Bid_Question_6_RESPONSE.pdf

PDF 158 KB Posted

Attached to
Deep Draft Utility Floats (UFDD) Federal contract opportunity
Solicitation number
N4523A-16-R-0009
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Bidder's question answer 6

View the file

Other files for this federal contract opportunity

Other files attached to Deep Draft Utility Floats (UFDD), newest first.
File Type Posted
Bidders_question__10.pdf PDF
Bidders_question_8.pdf PDF
Bid_Question_3_RESPONSE.pdf PDF
Bid_Question_4_RESPONSE.pdf PDF
Bidders_Question_7-2.pdf PDF
Bid_Question_1_RESPONSE.pdf PDF
Bidders_Question_9.pdf PDF
Bid_Question_5_RESPONSE.pdf PDF
Bid_Question_7_RESPONSE.pdf PDF
Amend.docx DOCX document
UFDD_40_ _117_-_Request_for_Clarification_(_1).docx DOCX document
amend_1.docx DOCX document
REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx DOCX document
UFDD_40_ _117_KTR_5-Way_Breakdown.xls XLS spreadsheet
solicitation_on_FBO.docx DOCX document
SOW_(2).doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 8MAR2016 QUESTION NO: 6

REQUIREMENT: REQUISITION NO.: N4523A-16-R-0009

ITEM NO:

TITLE:

ISSUING OFFICE POC(CODE 446):

LeAundria Shaheed: (360) 476-4452

Leaundria.shaheed@navy.mil

PARA. NO: PAGE NO: CONTRACTOR: STABBERT MARINE

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

VINCENT PROM, 619-838-1988

CONTRACTOR QUESTION:

1. 1093370E Camel Float Structural Details. According to this drawing these floats were originally coated with three coats of Red Lead Primer. Question…has the red lead primer ever been replaced in the floats? The drawing also calls out that there is approximately 36,105 lbs. of concrete ballast in them. Question…is the ballast still in the floats?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG: N

TECHNICAL REVIEW: GILBERT SERIAL NO:

1- Review / accomplish requirements of para 1.13.2 in Statement of Work

2- No concrete ballast

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

FOR PROPOSAL.