About this file

Security requirements added

View the file

Other files for this federal contract opportunity

Other files attached to Deep Draft Utility Floats (UFDD), newest first.
File Type Posted
Bidders_question__10.pdf PDF
Bidders_question_8.pdf PDF
Bidders_Question_9.pdf PDF
Bid_Question_6_RESPONSE.pdf PDF
Bid_Question_5_RESPONSE.pdf PDF
Bid_Question_7_RESPONSE.pdf PDF
Bid_Question_3_RESPONSE.pdf PDF
Bid_Question_4_RESPONSE.pdf PDF
Bidders_Question_7-2.pdf PDF
Bid_Question_1_RESPONSE.pdf PDF
Amend.docx DOCX document
UFDD_40_ _117_-_Request_for_Clarification_(_1).docx DOCX document
REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx DOCX document
solicitation_on_FBO.docx DOCX document
UFDD_40_ _117_KTR_5-Way_Breakdown.xls XLS spreadsheet
SOW_(2).doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4523A-16-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

NOTICE TO OFFEROR

1) This is 100% Small Business Set-Aside under NAICS Code 336611.

2) Security Point of Contact Daniel Cooper, at 360-476-0418, email: daniel.d.cooper@navy.mil, Refer to Section L (1)(g)(2), if access is needed must notify by February 29, 2016

3) Ship check Point of Contact John Musante at (360) 476-4065 or email: john.musante@navy.mil, Refer to Section L (1)(g)(1), March 2, 2016 8:30 – 11:30

4)Government Point of Contact(s):
a)LeAundria Shaheed at (360) 476-4452 or email at leaundria.shaheed@navy.mil

b) Alternative point of contact is Joseph Lownik at (360) 476-4071or email at joseph.lownik@navy.mil

5) Request for Clarification form Attachment identified in Section J to the Contract Specialist no later than 2:00 P.M. (PST), March 9, 2016

6) Proposal deadline is Monday March 21 2016 at 12:00 PM PST.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

SECURITY REQUIREMENT

NAVY INSTALLATIONS, BADGING, AND ACCESS REQUIREMENTS

1. GENERAL:

a. Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Installations sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. It is the contractor’s responsibility to check for and obtain changes and updated information at each installation on a continual basis. Further information can be found at the individual Naval Installation websites.

b. The following badging and access requirements are effective 01 Sep 2011.

c. Commander, Navy Installations Command (CNIC), has established the Navy Commercial Access Control System (NCACS) (replaces the RAPIDGate program system) a standardized process for granting unescorted access privileges to vendors, contractors, suppliers, and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Visiting vendors may obtain daily passes directly from the individual Navy Installations by submitting identification credentials for verification and undergoing a criminal screening/ background check.

d. Contractor employees shall require an individual identification badge, and may require additional badges, to gain access to job sites.

e. Lack of proper I.D. badge(s) shall result in denial of access to the Naval Installation, and/or the ship, resulting in a delay at the Contractor's expense.

f. Contractor personnel are authorized to retain temporary badges until the badge expiration date or termination of employment. Upon badge expiration date, termination of employment, or completion of contract, the Contractor is required to immediately notify the Contracting Officer’s Security Officer and return all badges.

g. Badges must be displayed on the outermost garment above the waist at all times. The only exception would be while the contractor personnel are engaged in work which could cause a safety hazard if the badge were worn while performing the work.

h. Lost or misplaced badges shall be reported immediately to the CONTRACTING OFFICER’S SECURITY OFFICER, or if after close of business working hours, to NESCOM 476-3393.

i. All additional badging or access requirements will be identified on a case by case basis in the individual delivery order.

2. PSNS & IMF CONTROLLED INDUSTRIAL AREA (CIA):

“Effective 16 June 2014 PSNS & IMF will only issue NAVSEA badges to contractor employees who do possess one of the following credentials: Common Access Card (CAC), a single day pass issued by Naval Base Kitsap (NBK) or Navy Commercial Access Control System (NCACS) credential.”

a. As a contract requirement, the contractor shall prepare a Visit Request List of all prime and subcontractor personnel required to access Naval Vessels in the CIA. The access list shall be restricted to only those employees who have a "need to access" in the execution of the contract requirements. The prime contractor shall bear full responsibility for the accuracy of the Visit Request List. With good cause, as determined by the CONTRACTING OFFICER or appropriate SECURITY PERSONNEL, access requests may be refused or amended. Updates to the Visit Request List shall be made on an as needed basis.

b. Submit the Visit Request List with a cover letter on Company letterhead to the Contracting Officer’s Security Officer, Daniel Cooper, voice 360-476-0418, email: daniel.d.cooper@navy.mil. The cover letter shall be a formal request for badging and access during the contract or delivery order period of performance. The letter shall include (1) purpose for access, (2) dates of validity (period of performance), (3) contract number, and (4) name of subcontractors to be employed. The letter shall be signed by the prime Contractor's Facility Security Officer, and shall be received by the Contracting Officer’s Security Officer no later than TBD696767 to be granted access.

c.The Visit Request List shall be organized ALPHABETICALLY BY LAST NAME and contain the following information in column form:
(1)NAME (Last, First, MI)
(2)DATE OF BIRTH
(3)PLACE OF BIRTH (City & State)
(4)SSN
(5)CITIZENSHIP
(6)COMPANY (Prime Contractor or Subcontractor)

d. Badges may be picked up at the PSNS & IMF Pass & ID office, and requires contractor employees to provide identification of citizenship. Valid forms of citizenship are:

(1) Certified Birth Certificate (not a copy)

(2) Current Passport

(5) Naturalization Papers

(6) Consular Report of Birth (FS-240):

*Note: If contractor employees are providing document with no photo, they shall also be required to present government issued photo identification (i.e. Driver’s License or ID card).

e. For contractor individuals that require higher level badge requirements (access to Nuclear Work Areas (NWA) or Controlled Nuclear Information Areas (CNIA) areas (i.e. Red or Yellow badges), the Contractor’s Facility Security Officer shall (1) Input each individual’s information into the Joint Personnel Adjudication System (JPAS) Security program with Security Management Office (SMO) number 002515, and (2) Submit a completed DD254 and separate Visit Request List to the Contracting Officer’s Security Officer.

f. To grant Contractor Vehicle Access to the PSNS & IMF CIA, a list of vehicles, a copy of each vehicle registration and a justification for access shall be submitted for processing via PSNS & IMF Form 5530/25. Contractors are required to stop at PSNS & IMF Pass & ID Office with proof of a valid, current Driver’s License, vehicle registration, and proof of insurance, prior to receiving access.

ii. All Contractor Employees shall adhere to PSNS&IMF NOTICE 5239 PORTABLE ELECTRONIC DEVICE (PED) GUIDANCE.

SECTION E - INSPECTION AND ACCEPTANCE

The following have been deleted:

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996

SECTION G - CONTRACT ADMINISTRATION DATA

HQ G-2-0004 PURCHASING OFFICE

REPRESENTATIVE:

COMMANDER

ATTN: LeAundria Shaheed

Puget Naval Shipyard

1400 Farragut Ave

Bremerton, WA 98314

Telephone No. 360-476-4452

ALTERNATE POINT OF CONTACT

Email Address: leaundria.shaheed@navy.mil

Joseph Lownik

PSNS & IMF

1400 Farragut Ave Bremerton, WA 98314 Telephone No 360-340-2741 joseph.lownik@navy.mil

The following were previously included by reference and are now included by full text:

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Inspector DODAAC N4523A

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAACN4523A
Issue By DoDAACN4523A
Admin DoDAACN4523A
Inspect By DoDAACN4523A
Ship To CodeN/A
Ship From CodeN/A
Mark For CodeN/A
Service Approver (DoDAAC)N4523A
Service Acceptor (DoDAAC)N4523A
Accept at Other DoDAACN/A
LPO DoDAACN/A
DCAA Auditor DoDAACN/A
Other DoDAAC(s)N/A

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Leaundria.shaheed@navy.mil and joseph.lownik@navy.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Vilva Delacruz @ vilva.delacruz@navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.243-7 NOTIFICATION OF CHANGES (APR 1984)

(a) Definitions.

"Contracting Officer," as used in this clause, does not include any representative of the Contracting Officer.

"Specifically authorized representative (SAR)," as used in this clause, means any person the Contracting Officer has so designated by written notice (a copy of which shall be provided to the Contractor) which shall refer to this subparagraph and shall be issued to the designated representative before the SAR exercises such authority.

(b) Notice. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to constitute a change to this contract. Except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Administrative Contracting Officer in writing, within 24 calendar days from the date that the Contractor identifies any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. On the basis of the most accurate information available to the Contractor, the notice shall state--

(1) The date, nature, and circumstances of the conduct regarded as a change;

(2) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such conduct;

(3) The identification of any documents and the substance of any oral communication involved in such conduct;

(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;

(5) The particular elements of contract performance for which the Contractor may seek an equitable adjustment under this clause, including--

(i) What contract line items have been or may be affected by the alleged change;

(ii) What labor or materials or both have been or may be added, deleted, or wasted by the alleged change;

(iii) To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change;

(iv) What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and

(6) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay or disruption of performance.

(c) Continued performance. Following submission of the notice required by (b) above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor, unless the notice reports a direction of the Contracting Officer or a communication from a SAR of the Contracting Officer, in either of which events the Contractor shall continue performance; provided, however, that if the Contractor regards the direction or communication as a change as described in (b) above, notice shall be given in the manner provided. All directions, communications, interpretations, orders and similar actions of the SAR shall be reduced to writing and copies furnished to the Contractor and to the Contracting Officer. The Contracting Officer shall countermand any action which exceeds the authority of the SAR.

(d) Government response. The Contracting Officer shall promptly, within 5 calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall either--

(1) Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;

(2) Countermand any communication regarded as a change;

(3) Deny that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance; or

(4) In the event the Contractor's notice information is inadequate to make a decision under (1), (2), or (3) above, advise the Contractor what additional information is required, and establish the date by which it should be furnished and the date thereafter by which the Government will respond.

(e) Equitable adjustments.

(1) If the Contracting Officer confirms that Government conduct effected a change as alleged by the Contractor, and the conduct causes an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, whether changed or not changed by such conduct, an equitable adjustment shall be made--

(i) In the contract price or delivery schedule or both; and

(ii) In such other provisions of the contract as may be affected.

(2) The contract shall be modified in writing accordingly. In the case of drawings, designs or specifications which are defective and for which the Government is responsible, the equitable adjustment shall include the cost and time extension for delay reasonably incurred by the Contractor in attempting to comply with the defective drawings, designs or specifications before the Contractor identified, or reasonably should have identified, such defect. When the cost of property made obsolete or excess as a result of a change confirmed by the Contracting Officer under this clause is included in the equitable adjustment, the Contracting Officer shall have the right to prescribe the manner of disposition of the property. The equitable adjustment shall not include increased costs or time extensions for delay resulting from the Contractor's failure to provide notice or to continue performance as provided, respectively, in (b) and (c) above.

Note: The phrases “contract price” and “cost” wherever they appear in the clause, may be appropriately modified to apply to cost-reimbursement or incentive contracts, or to combinations thereof.

52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)

(a) Definitions. As used in this clause --

Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.

Supplies means the end items furnished by the Contractor and related services required under this contract. The word does not include ``data.''

(b) Contractor's obligations.

(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for 90 days

(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and

(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform with the requirements of this contract.

(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor. However, the Contractor's liability for the transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in this contract and the Contractor's plant, and return.

(3) Any supplies or parts thereof, corrected or furnished in replacement under this clause, shall also be subject to the terms of this clause to the same extent as supplies initially delivered. The warranty, with respect to supplies or parts thereof, shall be equal in duration to that in paragraph (b)(1) of this clause and shall run from the date of delivery of the corrected or replaced supplies.

(4) All implied warranties of merchantability and "fitness for a particular purpose" are excluded from any obligation contained in this contract.

(c) Remedies available to the Government.

(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within 90 days of the last delivery under this contract,”

(2) Within a reasonable time after the notice, the Contracting Officer may either--

(i) Require, by written notice, the prompt correction or replacement of any supplies or parts thereof (including preservation, packaging, packing, and marking) that do not conform with the requirements of this contract within the meaning of paragraph (b)(1) of this clause; or

(ii) Retain such supplies and reduce the contract price by an amount equitable under the circumstances.

(3) (i) If the contract provides for inspection of supplies by sampling procedures, conformance of suppliers or components subject to warranty action shall be determined by the applicable sampling procedures in the contract. The Contracting Officer--

(A) May, for sampling purposes, group any supplies delivered under this contract;

(B) Shall require the size of the sample to be that required by sampling procedures specified in the contract for the quantity of supplies on which warranty action is proposed;

(C) May project warranty sampling results over supplies in the same shipment or other supplies contained in other shipments even though all of such supplies are not present at the point of reinspection; provided, that the supplies remaining are reasonably representative of the quantity on which warranty action is proposed; and

(D) Need not use the same lot size as on original inspection or reconstitute the original inspection lots.

(ii) Within a reasonable time after notice of any breach of the warranties specified in paragraph (b)(1) of this clause, the Contracting Officer may exercise one or more of the following options:

(A) Require an equitable adjustment in the contract price for any group of supplies.

(B) Screen the supplies grouped for warranty action under this clause at the Contractor's expense and return all nonconforming supplies to the Contractor for correction or replacement.

(C) Require the Contractor to screen the supplies at locations designated by the Government within the contiguous United States and to correct or replace all nonconforming supplies.

(D) Return the supplies grouped for warranty action under this clause to the Contractor (irrespective of the f.o.b. point or the point of acceptance) for screening and correction or replacement.

(4) (i) The Contracting Officer may, by contract or otherwise, correct or replace the nonconforming supplies with similar supplies from another source and charge to the Contractor the cost occasioned to the Government thereby if the Contractor--

(A) Fails to make redelivery of the corrected or replaced supplies within the time established for their return; or

(B) Fails either to accept return of the nonconforming supplies or fails to make progress after their return to correct or replace them so as to endanger performance of the delivery schedule, and in either of these circumstances does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure.

(ii) Instead of correction or replacement by the Government, the Contracting Officer may require an equitable adjustment of the contract price. In addition, if the Contractor fails to furnish timely disposition instructions, the Contracting Officer may dispose of the nonconforming supplies for the Contractor's account in a reasonable manner. The Government is entitled to reimbursement from the Contractor, or from the proceeds of such disposal, for the reasonable expenses of the care and disposition of the nonconforming supplies, as well as for excess costs incurred or to be incurred.

(5) The rights and remedies of the Government provided in this clause are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.

The following have been deleted:

NOTE A

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
J-2 Request for Clarification
Attachment 2
J-1 Technical Breakdown

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 3
J-2 Request for Clarification

(End of Summary of Changes) image1.wmf