Technical Proposal Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Request_for_Clarification_2.pdf | ||
| Attachment_1_Request_for_Clarification_1.pdf | ||
| N4523A15R0010_0002.pdf | ||
| N4523A15R0010_0001.doc | DOC document | |
| Solicitation_N4523A-15-R-0010_65FT_Diveboat.pdf | ||
| LG2_PWS.pdf | ||
| Attachment_1_Request_for_Clarification.doc | DOC document | |
| LG2_PWS_DRAFT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Proposal Breakdown
| PROJECT: LONG GLASS II (65' Dive Boat) | OFFEROR: ________________________________ | DATE: ____________ | ||
| PARA NO. | Work Item/ Paragraph Title | M/H | COST $ | |
| 1.0 | General Requirements | |||
| 1.6 | Arrival Conference | |||
| 1.8 | Progress Meetings | |||
| 1.13 | Environmental & HAZWASTE Mgmt. | |||
| 1.17 | Availability Conference | |||
| 1.19 | Gas Free | |||
| 3.1 | Docking & Undocking | |||
| 3.1.8 | Docking the vessel | |||
| 3.1.9 | Post docking | |||
| 3.1.10 | Shifting the vessel | |||
| 3.1.11 | Undocking the vessel | |||
| 3.2 | Hull Repairs | |||
| 3.2.1 | Identify Distinguishing Figures and Markings | |||
| 3.2.3 | Zinc Anodes | |||
| 3.2.4 | Hull Blasting and Preservation | |||
| 3.2.5 | Diver's Platform Port Handrail Repair | |||
| 3.2.6 | Hull and Freeboard Visual Inspection | |||
| 3.2.7 | Hull and Freeboard UT Inspection | |||
| 3.3 | Structural Repairs | |||
| 3.3.1 | Lazarette Deck Plate preservation | |||
| 3.3.2 | Engine Room Deck Plate Preservation | |||
| 3.3.3 | Deck Tile Repair | |||
| 3.3.4 | Head Decking Repair | |||
| 3.3.5 | Chair Mounting Bracket Removal | |||
| 3.4 | Tanks/Voids | |||
| 3.4.1 | Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids | |||
| 3.4.2 | Tank/Void Visual Inspection | |||
| 3.4.3 | Preliminary Air Test | |||
| 3.4.4 | Clean, Disinfect, and Flush Fresh Water System | |||
| 3.4.5 | Certification of Fresh Water Piping and Tank | |||
| 3.4.6 | Tank/Void Closeout Inspection | |||
| 3.4.7 | Final Air Test | |||
| 3.4.8 | On-Load Fuel and Potable Water | |||
| 3.5 | Main Deck Repairs | |||
| 3.5.1 | Main Deck Exterior Preservation | |||
| 3.5.2 | Main Deck Stantion Repair | |||
| 3.5.3 | Main Deck Life Line Replacement | |||
| 3.5.4 | Main Deck Crane Foundatin and Stuffing Tube Removal | |||
| 3.6 | Superstructure | |||
| 3.6.1 | Pilot House Roof non-skid repairs | |||
| 3.6.2 | Pilot House exterior preservation | |||
| 3.6.3 | Pilot House Top Deck Life Line replacement | |||
| 3.6.4 | Repair Pilot House Window | |||
| 3.6.5 | Pilot House Door repairs | |||
| 3.6.6 | Remove/Replace Pilot House Vent Grills | |||
| 3.6.7 | Suit Heater Foundation Repair | |||
| 3.7 | Main Propulsion Repairs | |||
| 3.7.1 | Shaft Removals | |||
| 3.7.2 | Shaft Assembly | |||
| 3.7.3 | System Operational Test | |||
| 3.8 | Steering Repairs | |||
| 3.8.1 | Hydraulic Steering Hoses Repair | |||
| 3.8.2 | Cylinder Assembly Repair | |||
| 3.8.3 | Rudder Removals | |||
| 3.8.4 | Rudder Assembly | |||
| 3.9 | Machinery Systems | |||
| 3.9.1 | Remove/Replace HPU and Anchor Windlass hoses | |||
| 3.11 | Piping Repairs | |||
| 3.11.1 | Sea Strainer Repair | |||
| 3.11.2 | Suit Heater Fuel Line Repair | |||
| 3.14 | Dock and Sea Trials | |||
| TOTAL: | - 0 | - 0 | $ - 0 |