Technical_Proposal_Breakdown.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
65 FT EOD Support Craft MK-II (65SCMK2) Federal contract opportunity
Solicitation number
N4523A-15-R-0010
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Technical Proposal Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to 65 FT EOD Support Craft MK-II (65SCMK2), newest first.
File Type Posted
Attachment_1_Request_for_Clarification_2.pdf PDF
Attachment_1_Request_for_Clarification_1.pdf PDF
N4523A15R0010_0002.pdf PDF
N4523A15R0010_0001.doc DOC document
Solicitation_N4523A-15-R-0010_65FT_Diveboat.pdf PDF
LG2_PWS.pdf PDF
Attachment_1_Request_for_Clarification.doc DOC document
LG2_PWS_DRAFT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Proposal Breakdown

PROJECT: LONG GLASS II (65' Dive Boat)OFFEROR: ________________________________DATE: ____________
PARA NO.Work Item/ Paragraph TitleM/HCOST $
1.0General Requirements
1.6Arrival Conference
1.8Progress Meetings
1.13Environmental & HAZWASTE Mgmt.
1.17Availability Conference
1.19Gas Free
3.1Docking & Undocking
3.1.8Docking the vessel
3.1.9Post docking
3.1.10Shifting the vessel
3.1.11Undocking the vessel
3.2Hull Repairs
3.2.1Identify Distinguishing Figures and Markings
3.2.3Zinc Anodes
3.2.4Hull Blasting and Preservation
3.2.5Diver's Platform Port Handrail Repair
3.2.6Hull and Freeboard Visual Inspection
3.2.7Hull and Freeboard UT Inspection
3.3Structural Repairs
3.3.1Lazarette Deck Plate preservation
3.3.2Engine Room Deck Plate Preservation
3.3.3Deck Tile Repair
3.3.4Head Decking Repair
3.3.5Chair Mounting Bracket Removal
3.4Tanks/Voids
3.4.1Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids
3.4.2Tank/Void Visual Inspection
3.4.3Preliminary Air Test
3.4.4Clean, Disinfect, and Flush Fresh Water System
3.4.5Certification of Fresh Water Piping and Tank
3.4.6Tank/Void Closeout Inspection
3.4.7Final Air Test
3.4.8On-Load Fuel and Potable Water
3.5Main Deck Repairs
3.5.1Main Deck Exterior Preservation
3.5.2Main Deck Stantion Repair
3.5.3Main Deck Life Line Replacement
3.5.4Main Deck Crane Foundatin and Stuffing Tube Removal
3.6Superstructure
3.6.1Pilot House Roof non-skid repairs
3.6.2Pilot House exterior preservation
3.6.3Pilot House Top Deck Life Line replacement
3.6.4Repair Pilot House Window
3.6.5Pilot House Door repairs
3.6.6Remove/Replace Pilot House Vent Grills
3.6.7Suit Heater Foundation Repair
3.7Main Propulsion Repairs
3.7.1Shaft Removals
3.7.2Shaft Assembly
3.7.3System Operational Test
3.8Steering Repairs
3.8.1Hydraulic Steering Hoses Repair
3.8.2Cylinder Assembly Repair
3.8.3Rudder Removals
3.8.4Rudder Assembly
3.9Machinery Systems
3.9.1Remove/Replace HPU and Anchor Windlass hoses
3.11Piping Repairs
3.11.1Sea Strainer Repair
3.11.2Suit Heater Fuel Line Repair
3.14Dock and Sea Trials
TOTAL:- 0- 0$ - 0

TECHNICAL PROPOSAL BREAKDOWN N4523A-15-R-0007, Attachment J-3

(Rev 03/2015)

File details come from the government source that posted it. Updated .