1636727_Ballistic Glazing (B7315) - SAP Package.pdf
PDF 1 MB Posted
- Attached to
- Ballistic Glass Replacement Federal contract opportunity
- Solicitation number
- N4008520R2103
About this file
This federal solicitation requests replacement of ballistic glazing and frames at a firing range facility. The scope of work includes removing thirty existing ballistic glass units and hollow metal frames between firing lanes and control booths in two indoor small arms ranges. The contractor must install new glazing and frames that meet UL752 Level 7 ballistic standards. All work must be completed within 120 calendar days of award. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for the ballistic glass replacement project located at Building 7315 on Naval Station Great Lakes in Illinois.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PROPOSAL COVER SHEET - Ballistic Glazing 7315.docx | DOCX document | |
| Ballistic Glazing Site Visit Sign-In Sheet.pdf | ||
| N4008520R21030002 Amendment.pdf | ||
| N4008520R2103 Solicitation Ballistic Glazing B7315.pdf | ||
| Att.1-PrePropsal Inquiry Form N4008520R2103 Ballistic Glazing B7315.xlsx | XLSX spreadsheet | |
| N4008520R2103 Amendment Ballistic Glazing B7315.pdf | ||
| 1636727_Ballistic Glazing (B7315) - As Builts.pdf | ||
| George - ACQR 5766946 - INSTRUCTIONS TO OFFEROR.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Ballistic Glazing (B7315) eProject #1636727
Naval Station Great Lakes, IL (Camp Porter)
Revised 11 OCT 2019 Page 1 of 11
Replace Ballistic Glazing (B7315)
3410 Illinois Street, Great Lakes, IL 60088 eProjects WON: 1636727
1. General Description:
The work includes furnishing all labor, transportation, supervision, material, equipment, and performing all operations in connection with replacement of the existing ballistic-rated glazing and hollow-metal frames between the firing lanes and the control booths within both indoor small arms ranges at the USS
Wisconsin (Building 7315). Each range contains five (5) window units with three (3) glazed lites at each unit; there are a total of 30 glazed lites requiring replacement across both ranges, approximately 480 SF in total of ballistic glazing and associated hollow metal framing. Replacement glazing must meet UL
752, Level 7, standards as required for range operations.
2. Location:
The work shall be performed at the USS Wisconsin, Building 7315, inside both firing ranges (on the first deck), at 3410 Illinois Street onboard Naval Station Great Lakes (Camp Porter).
3. Winter Weather:
To ensure adequate protection from winter weather, the Contractor will not perform any construction work exterior to the facility during the period of 01 NOV to 01 APR without submitting a written request and obtaining written approval of the Government Representative.
4. Examination of the Premises:
Contractor shall reference FAR Part 52.236-3, Site Investigation and Conditions Affecting the Work.
Site visits are encouraged and can be arranged by contacting the Contracting Office.
5. Inspection and Approval:
All material and workmanship shall be subject to the inspection and approval of the Authorized
Government Representative.
6. Minimum Insurance Requirements:
The contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
A. Comprehensive general liability: $500,000 per occurrence.
B. Automobile liability: $200,000 per person; $500,000 per occurrence for bodily injury; and
$20,000 per occurrence for property damage.
C. Workmen's compensation: As required by Federal and State workers' compensation and occupational disease laws.
D. Employer's liability coverage: $100,000 except in States where workers' compensation may not be written by private carriers.
Revised 11 OCT 2019 Page 2 of 11
E. Others as required by State law.
Before Commencing work under this contract, the Contractor shall receive notification of an approved insurance certificate from the Contracting Officer. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the
Government’s interest shall not be effective-
A. For such period as the laws of the State in which this contract is to be performed prescribe; or, B. Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
7. Submittals:
The Contractor shall submit two (2) hard copies and electronic PDFs of the contract submittals after award. All submittals shall be approved by the Government Representative prior to the start of work.
Contractor can submit submittals electronically via email if the type of submittal allows it. For example, floor tile samples obviously could not be sent electronically. All Safety Data Sheets shall be supplied to the Government Representative.
A. Required Post-award Submittals:
1. Administrative submittals
a. Insurance (see para. 6)
b. Accident Prevention Plan (see safety specification)
c. Safety Plan
d. Lift Plan (if applicable)
e. Hazardous Material Survey
f. Asbestos Hazard Abatement Plan (if applicable)
g. Lead, Cadmium, & Chromium, Compliance Plan (if applicable)
h. Construction Schedule
i. Environmental Protection & Waste Management Plan
j. ECATTS Training Certs
k. Schedule of Values
2. Technical Submittals, product manufacturer’s literature with specifications and drawings.
a. Specifications & drawings
b. Product manufacturer’s literature
c. Final As-Builts
i. Two (2) full-size and one (1) half-size hard copy of all drawings and specs.;
ii. Three (3) archival-grade CDs containing full-size PDFs of all drawings and specs.
(unencrypted) and all drawings in AutoCAD 2016 format (inclusive of all external references, unencrypted).
d. Operation & Maintenance Support Information (OMSI)
i. Three (3) bound hard copies of all OMSI materials.
ii. Three (3) archival-grade CDs containing PDF versions of all OMSI materials
(unencrypted).
8. Materials and General Requirements:
The USS Wisconsin (Building 7315) onboard NAVSTA Great Lakes (Camp Porter) serves as Recruit
Training Command’s (RTC) primary indoor small arms live fire range training facility. The facility is
Revised 11 OCT 2019 Page 3 of 11 comprised of two (2) separate firing ranges; each range consists of 18 firing lanes (36 total in the building). The existing ballistic glazing separating the firing ranges from the control rooms is degraded and has begun to fail in areas with various pitting and cracking occurring.
Existing ballistic-rated glazing and hollow metal framing assemblies between the firing lanes and the control booths within both indoor small arms ranges is to be removed and replaced completely, cleaned and prepped to receive new work. Each range contains five (5) window units with three (3) glazed lites at each unit; there are a total of 30 glazed lites requiring replacement across both ranges. Approximately
240 SF of ballistic glazing in each range, 480 SF in total, is in need of replacement.
At each of the two ranges there are six (6) glazing lites measuring approximately 42.5”W x 52”H (inside frame/clear dimensions) and nine (9) glazing lites measuring approximately 45”W x 52”H (inside frame/clear dimensions). New work will maintain existing glazing/window unit dimensions throughout.
Replacement glazing must be clear, chemically strengthened glass-clad ionomer or polycarbonate compositional sheet and conform to UFGS 08 34 02 for bullet resistant components, meeting UL 752
Level 7 standards for bullet resistant materials as required for range operations and 5.56 mm rifle round usage (M4, M16, or similar); existing glazing is Level 4 and not compatible with range operations.
Provide new detention-grade hollow metal steel frames; frames should be constructed of brake formed commercial-grade cold-rolled 12 gauge steel, lined with UL listed bullet resistant fiberglass in frame.
Assembly of frames should be fully welded the full length of the intersection, knocked down or mechanical joints will not be accepted. Provide all necessary anchors, fasteners, stops, reinforcement plates, hardware, etc. required for a complete system installation. Conform to ANSI/NAAMM HMMA
863 (Guide Specifications for Detention Security Hollow Metal Doors and Frames).
Keep hollow metal surfaces clean and free of grout, tar, or other bonding materials or sealer; clean grout or other bonding material off of frames immediately following installation. Finish smooth any exposed welds and touch up with rust inhibitive primer. Likewise, touch up pre-primed or painted surfaces which have been scratched or marred during installation, using a rust inhibitive primer. Frames should be finished with a factory-applied rust inhibitive hydrophobic acrylic primer and field-finished with (one coat) of the same primer and with (two coats) a compatible acrylic emulsion paint, satin finish; color to match existing.
The USS Wisconsin is an actively used recruit training facility; coordination and communication will be required to ensure end-user operations are impacted as minimally as possible. Only one range will be permitted to be taken offline at a time, the other must remain fully operational; required downtime should be kept to an absolute minimum. All efforts should be made to plan and prep/mobilize for necessary construction activities prior to range shutdown; further, proactive communication is required through
NAVFAC with the supported tenant Command to ensure training operation downtime can be planned for in advance of shutdown(s). If during work unforeseen conditions should arise, the contractor should immediately cease operations and request guidance from the Navy.
Building 7315 was built in 2000 and no known lead, asbestos or hazardous materials were used, however during construction, if suspected hazardous materials are encountered, conduct a Hazardous Material
Survey of the areas directly impacted by the project. Based on the survey results, an Asbestos Design, Asbestos Hazard Abatement Plan, Lead Design and/or Lead, Cadmium, & Chromium Compliance Plan may be required. Refer to Section 11, Environmental Protection, for specific requirements.
9. Drawings and/or Sketches Accompanying Specifications:
A. UFGS 01 31 23.13 20 – Electronic Contract Management System (ECMS)
Revised 11 OCT 2019 Page 4 of 11
B. UFGS 01 35 26 – Great Lakes Safety Requirements
C. UFGS 08 34 02 – Bullet Resistant Components
D. Great Lakes Environmental Requirements
E. DBIDS Standard Operating Procedures
F. As-Built Reference Drawings
Attached drawings are provided for reference purposes and general information only. They may contain errors and/or discrepancies and should not be relied upon to be 100% accurate. These drawings might be outdated and changes may have occurred. Actual field conditions shall be verified by Contractor.
10. Cleanup:
Upon completion of work each day the Contractor shall remove all excess material and debris from the
Government property, and leave the entire area in a neat and clean condition. Proper disposal of any materials and/or debris shall be the responsibility of the Contractor and all costs shall be incorporated in the contract price.
11. Environmental Protection:
Naval Station Great Lakes (NSGL), including contractor project work site(s) are subject to Federal, State, and local regulatory inspection to verify compliance with environmental regulations. The
Contractor shall cooperate fully with all regulatory representatives which may visit their job site and shall provide immediate notification to the Navy Contracting Officer (NCO). The contractor shall complete, maintain, and make available to the NCO, NSGL designated representative or regulatory agency all documentation relating to environmental compliance as requested.
Contractor must minimize land disturbance during construction. All saw cutting must be done so that dust is not released into the air. Any runoff from these activities and any other activities associated with this project must be routed so that all sediment is removed before the reaching any drains to the storm water system.
A. Procurement of Recycled Content Materials:
Contractors shall procure all materials for projects on Government property in accordance with
Executive Order 13101 of September 14, 1998 “Greening the Government through Waste
Prevention, Recycling and Federal Acquisition”. A listing of recycled content materials available to be utilized can be found in the United States Environmental Protection Agency (U.S. EPA)
Comprehensive Procurement Guidelines (CPG) listing: http://www.epa.gov/cpg/products.htm.
Contractor shall provide documentation regarding compliance with this Order to the Contracting
Officer’s representative.
B. Control and Disposal of Solid Wastes:
Pick up solid wastes and place in covered containers, which are regularly emptied. Recycling is mandatory aboard Naval Station, Great Lakes, Illinois. This includes, but is not limited to, Construction & Demolition (C&D) debris, aluminum, paper, cardboard, and glass. All recycling efforts can be coordinated with the Contracting Officer.
C. Identification, Control, and Disposal of Regulated Materials and Waste:
Revised 11 OCT 2019 Page 5 of 11
Control and disposal of all hazardous regulated waste (waste regulated by state, local, or federal law, Navy or other agency, regulation or other policy) generated as a consequence of execution of this project shall be the responsibility of the Contractor and is to be included in the contract price. Contractor is responsible for all Regulated Materials (materials regulated under State, Local or Federal law, Navy or other agency regulation or policy, including, but not limited to
Asbestos or Lead based paint) or Regulated Wastes as defined above, which are created in the course of the project, used in the project or brought on Government property by the Contractor.
Contractor shall immediately notify the Contracting Officer or his/her designated representative in the event that any unforeseen Regulated Waste or Regulated Material is encountered in the course of the work described herein. Due care has been taken to identify any Regulated
Materials or Regulated Wastes which should reasonably encountered in the course of the project, notwithstanding this, Contractor has primary responsibility for 1) identifying all Regulated
Wastes or Regulated Materials encountered or generated in the course of the project and 2) complying with all applicable Policies, and State, Local or Federal regulations pertaining to these
Regulated Wastes and/or Regulated Materials including, but not limited to, safety policies and regulations. All costs associated with complying with these requirements shall be included in the contract price.
1. Regulated Waste as defined above, shall be generated, stored, and disposed of in compliance with Navy Policy and all applicable Federal, State, Local regulations. The Contractor is responsible for familiarizing themselves with all these requirements. Contact the Navy’s
Designated Hazardous Waste Program Manager (via NAVFAC’s Construction Manager) for
Navy Hazardous Waste policy.
2. Prior to any regulated waste being generated or stored, the Contractor shall contact the
Navy’s Designated Hazardous Waste Program Manager to request approval of the proposed location for any waste accumulation area. The Contractor shall appoint a single point of contact along with a contact for all such areas and provide a contact number for that person.
The contact must be accessible 24 hours a day and identified in the Site Specific
Environmental Protection Plan.
3. Contractor shall dispose of all Contractor generated waste at a licensed permitted disposal facility acceptable to the Government. The Government, in its sole judgment, reserves the right to approve or disapprove contractor disposal facilities based on their potential effect on the Governments disposal related liability.
4. All representations to third parties regarding the nature of Regulated Waste(s) generated in the course of the project and the Navy’s Designated Hazardous Waste Program Manager must approve shipping documents related to movement of any Regulated Wastes in advance.
Where signature of the owner or operator is required, such signature shall be requested via the Navy’s Designated Hazardous Waste Program Manager. Arrangements to review documents shall be scheduled a minimum of 2 business days in advance of the shipment, during normal business hours Monday through Friday, except in emergencies. Waste pickups must be scheduled at a time acceptable to the Navy Project Representative and
Navy’s Designated Hazardous Waste Program Manager. The Contractor shall be responsible for completing and obtaining approval of the appropriate authorities for all documents necessary to comply with Navy Policy as well as State, Local and Federal regulations and/or requirements. Generators' copies of all shipping documents from disposal facilities, as well as Certificates of Disposal/Recycling shall be returned to the Navy’s Designated Hazardous
Waste Program Manager within forty-five (45) days of shipment off station. The items requiring review and approval include, but are not limited to the following:
Revised 11 OCT 2019 Page 6 of 11
a. Prime Contractor:
-Laboratory Reports on Waste Streams
- Profile Sheets
-Completed “Disposal Facility Environmental Audit” form from TSDF
b. Transporter:
-Name, address, phone number, and Point of Contact.
-Copies of transporter permits and hauler I.D. number.
-Proof of Insurance
c. Disposal Facility: (TSDF)
D. Release or Spill of Regulated Substance or Violation of Law:
a. Spills or chemical releases occurring on Navy property. All spills or release of petroleum products (including cooking oil and animal grease), hazardous substances, regulated waste, regulated gases or sewage occurring on Navy property shall be reported immediately to:
a. Great Lakes Emergency Dispatch Center 911
(HAZMAT, Fire, Police, Ambulance) (847) 688-3333
c. NSGL Environmental Division (847) 688-5395 x270
(630) 715-8765
l. The Navy will take prompt response action as deemed necessary to contain and otherwise resolve spills or releases with potential impact to environmentally sensitive areas occurring on NSGL including storm sewers; Lake Michigan tributary waters; creeks/streams/wetlands;
critical habitats; and protected/susceptible habitats.
m. Off-site spills or releases. All spills or releases occurring off-site involving government property is responsibility of the Contactor for reporting to federal, State and local agencies, and will be reported to:
i. Navy Contract Official (as identified at PAK)
ii. PWD Environmental Division (847) 688-5395 x270 or
(630) 715-8765
n. Reporting of spills or releases. The Navy’s designated PWD Environmental Representative is responsible for reporting spill or release incidents occurring on Navy property to Federal, State, and local agencies. Contractor is responsible for reporting all incidents occurring off
Navy property.
o. Liability. Spills and/or chemical release cleanup, remediation, damage to the environment and other related costs incurred resulting from Contractor actions shall be the responsibility of the Contractor. Such actions taken by the Navy or its designated responder(s) as deemed appropriate and necessary, shall be at the expense of the responsible Contractor.
Revised 11 OCT 2019 Page 7 of 11
E. Environmental Permits and Licenses
The Contractor including representative(s) thereof, is prohibited from initiating contact with local, State, or federal agencies on behalf of NSGL without prior written consent from the Navy.
This requirement shall apply to all correspondence, permits, spills, or environmental emergency incidents occurring on NSGL. Draft copy of all environmental permits or other authorizations shall be submitted to the NSGL Public Works Department Environmental Division (PWD-EV
DIV), via the NAVFAC Construction Manager, for approval prior to submission to the pertinent regulatory agency. Permits or other regulatory authorizations shall be received by the
Contractor with copy provided to the NCO prior to start of field work. Permits or regulatory authorizations include but not limited to - Storm Water Permits, and NSGL Temporary Tank
Authorization.
F. Hazardous Material Survey and Abatement
If suspected hazardous materials are encountered, the Contractor shall conduct a Hazardous
Material Survey of the project site and prepare a report. Provide the labor, equipment and materials necessary to perform the survey while adhering to all applicable local, state, and federal regulations. Inspect all impacted areas of the renovation project for suspect asbestos-containing materials and paint containing lead, cadmium, hexavalent chromium, or other hazardous materials. Collect information on the condition, location, and quantity of each suspect material identified. Photograph all suspect materials. Follow 40 CFR 763 Subpart E, Asbestos
Hazard Emergency Response Act (AHERA) requirements for inspection of friable and non-friable asbestos containing materials. Perform destructive testing for each homogenous area, inaccessible to routine testing, that will be disturbed by the subject work. Screen painted surfaces using an appropriately calibrated XRF Spectrum Analyzer. Collection of paint samples shall be limited to areas inaccessible by the XRF Analyzer or components with irregular (non-flat) surfaces and also to confirm inconclusive XRF results. Send samples to a third party accredited laboratory. Laboratories performing analysis for asbestos must be accredited by the National
Institute of Standards and Technology/National Voluntary Laboratory Accreditation Program
(NIST/NVLAP) and must be a successful participant and maintain proficiency in the
NIST/NVLAP sponsored quality assurance program for asbestos identification. Laboratories performing analysis for lead must be fully accredited by the EPA National Lead Laboratory
Accreditation Program (NLLAP) and rated proficient in the NIOSH/EPA Environmental Lead
Proficiency Analytical Testing Program (ELPAT). The inspector shall be licensed by the State of
Illinois as an Asbestos Building Inspector and Lead Inspector. Prepare a report to include as a minimum the following information. Submit the report to the Navy’s Designated Asbestos
Program Manager for review and approval.
Main Body of Report
a. Cover Page (include Project Title; Project Location; Contract Number; Prepared By;
Prepared For; Report Date)
b. Table of Contents
c. Executive Summary
d. Purpose and scope of the survey
e. Date when survey was conducted
f. Person(s) who conducted the survey (include name and inspector license numbers)
g. Survey Methodology
h. Summary of Findings
i. Statement of Limitations
j. Conclusions and Recommendations
Revised 11 OCT 2019 Page 8 of 11
Additionally, each page of the main body of report shall include the project title and date of report (including revision date as applicable).
Appendices or Attachments to Report
a. Table summarizing all identified suspect or assumed ACM. The table shall include as a minimum the following information: Homogenous Material (HM) Description, HM
Location, HM Type (surfacing material, thermal system insulation, or miscellaneous), approximate HM Quantity (LF/SF), HM Sample Identification Number, Test Result (% and type of asbestos), Test Method (PCM, PC, TEM), Friability (friable/non-friable), Condition
(good, damaged, severely damaged), and Photo Identification Number.
b. Table summarizing all identified paint testing combinations. The table shall include as a minimum the following information: Room Equivalent, Component Type, Substrate, Paint
Color, % Lead, % Cadmium, % Chromium (VI), Approx. Quantity, Condition, and Photo
Identification Number.
c. Drawings showing location of Homogenous Materials, Paint Testing Combinations and
Sample Collection Points.
d. Lab results including inspector sample identification number, physical description of sample as received, analytical method used, % and type of asbestos, name and signature of person performing analysis, and date of analysis.
e. Instrument Quality Control (QC) information
f. Chain of Custody forms
g. Inspector training certifications
h. Laboratory certifications
i. Photographs of Homogenous Materials and Paint Testing Combinations
The Contractor shall perform asbestos abatement work in accordance with the approved Asbestos
Hazard Abatement Plan as described in UFGS 02 82 00. The Designer of Record shall edit
UFGS 02 82 00 (Asbestos Remediation) based on the results of the Hazardous Materials
Survey.The Designer of Record shall be an EPA accredited Asbestos Project Designer and appropriately licensed in the State of Illinois. Submit the edited specification to the Navy’s
Designated Asbestos Program Manager for review and approval. The abatement plan shall be prepared in accordance with the requirements of the approved edited specification. Submit the abatement plan to the Navy’s Designated Asbestos Program Manager for review and approval.
Abatement work shall not begin until both the edited specification and abatement plan are reviewed & approved by the Navy’s Designated Asbestos Program Manager.
The Contractor shall perform work involving the removal of paint or painted components containing lead, cadmium, or hexavalent chromium in accordance with the approved Lead
Cadmium, Chromium Compliance Plan as described in UFGS 02 83 00. The Designer of Record shall edit UFGS 02 83 00, Lead Remediation. Submit the edited specification to the Navy’s
Designated Asbestos Program Manager for review and approval. The Lead, Cadmium, Chromium Compliance Plan shall be prepared in accordance with the requirements of the approved edited specification. Submit the plan to the Navy’s Designated Asbestos Program
Manager for review and approval. Work shall not begin until both the edited specification and
Lead, Cadmium, Chromium Compliance Plan are reviewed and approved by the Navy’s
Designated Asbestos Program Manager.
Revised 11 OCT 2019 Page 9 of 11
12. Working Hours:
The work shall be accomplished during normal working hours Monday through Friday, 0700 to 1600, and no work shall be performed on weekends or Federal, State, and local Holidays unless special arrangements are made through the Government Representative.
13. Safety:
Contractor shall follow all Federal, State, County, and Local Safety Requirements as well as the
Specifications Section 01 35 2605.20 and EM 385-1-1. The most stringent guidelines shall be used.
A. Contractor shall follow all Safety Requirements that pertain to this project as stated in the
Specification Section 01 35 2605.20 , Safety Requirements, which is included with the SAP.
B. Safety will be enforced as per the latest edition of US Army Corps of Engineers Safety and
Health Requirements Manual, EM 385-1-1. All applicable Sections of the Manual will be enforced.
C. Safety Data Sheets shall be provided to the contracting officer before work begins.
14. Pre-Performance Conference:
Within five (5) workdays of issuance contract award, the Contractor shall contact the Public Works
Department Great Lakes Construction Manager (as assigned) to schedule a pre-performance conference.
A. Provide Informal Partnering.
To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership with the contractor and its subcontractors. The partnership will draw on the strength of each organization in an effort to achieve a quality project done right the first time, within budget, on schedule, and without any safety mishaps. These partnering objectives are providing the basis for the contractor to make a reasonable profit. This level of partnering is part of the Post Award Kickoff (PAK). The Contracting Officer will organize the partnering session with key personnel of the project team, including Contractor’s personnel and Government personnel. The partners will determine the frequency of the follow-on sessions. Partnering sessions should be held at or near the location of the work being complete or via phone.
15. Invoicing Instructions:
Requests for payment will be processed in accordance with the Contract Clause "FAR 52.232-27, Prompt
Payment Construction Contracts." Submit all documents electronically in PDF format.
A. The Contract Performance Statement on the form furnished by the Government for this purpose, showing in detail, the estimated cost, percentage of completion, and value of completed performance.
B. Final invoice shall be accompanied by Final Release Form.
C. Updated construction and equipment delivery schedules.
D. Contractor Safety Self Evaluation Checklist.
Revised 11 OCT 2019 Page 10 of 11
E. Invoices not completed in accordance with contract requirements will be returned to the
Contractor for correction of the deficiencies.
F. Final invoices not accompanied by Final Release Form will be considered incomplete and will be returned to the Contractor.
This contract utilizes Wide Area Workflow (WAWF) for electronic invoicing. The contractor is responsible for registering for a WAWF account at the following website:
https://wawf.eb.mil
Information needed to register for a WAWF account will be included in the contract award document.
Training can be found at:
https://wawftraining.eb.mil/ and http://www.wawftraining.com
16. Contractor's Daily Reports:
Contractor shall submit daily reports directly to the Government Representative the day after the work has taken place. Daily reports shall indicate the repairs, type, quantity and locations. The report form can be obtained at the pre-performance conference.
17. Station Regulations:
Contractor shall abide by all station regulations, including all security requirements, drug and alcohol abuse policies, and sexual harassment policies.
18. Commencement of Work:
Contracting shall notify the building occupants at least three (3) working days prior to start of work.
Contractor will only start construction upon Government authorization.
19. Contractor Parking and Storage Areas:
Parking and storage areas must be coordinated during the on-site pre-performance meeting. The government will not assume responsibility for any contractor vehicles, equipment or materials stored in the work area. Additional space needs must be coordinated through the Contracting Officer’s
Representative.
20. Defense Biometric Identification System (DBIDS):
Commander, Navy Installations Command (CNIC), has established the Defense Biometric Identification
System (DBIDS) program for contractors to obtain access to the installation; participation in the program is mandatory to obtain necessary clearance and badges for access.
The Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law https://wawf.eb.mil/ https://wawftraining.eb.mil/ http://www.wawftraining.com/
Revised 11 OCT 2019 Page 11 of 11 enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
To obtain a DBIDS credential, complete and submit to the base sponsor a minimum of 15 days in advance a SECNAV FORM 5512/1 for each individual requiring access to the base. There is no cost to obtain a DBIDS credential.
Upon completion of the background check, the Visitor Control Center representative will complete the
DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and other assessments prior to issuing the DBIDS credential.
Under DBIDS, no commercial vehicle inspection is required, other than for Random Anti-Terrorism
Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON).
Immediately report instances of lost or stolen DBIDS credentials to the Contracting Officer.
Section 01 31 23.13 20 Page 1 of 8
Revised 11 OCT 2019
SECTION 01 31 23.13 20
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
05/17
PART 1 GENERAL
1.1 CONTRACT ADMINISTRATION
Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic
Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing and management of electronic technical submittals and documents. The web-based eCMS is the designated means of transferring technical documents between the Contractor and the Government. Paper media or e-mail submission, including originals or copies, of the documents identified in Table 1 are not permitted, except where eCMS is unavailable or non-functional. Contact the Contracting Officer's Representative (COR) regarding availability of eCMS training and reference materials.
1.2 USER PRIVILEGES
The Contractor will be provided access to eCMS. All technical submittals and documents must be transmitted to the Government via the COR. Project roles and system roles will be established to control each user's menu, application, and software privileges, including the ability to create, edit, or delete objects.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contractor's Personnel; G
1.4 SYSTEM REQUIREMENTS AND CONNECTIVITY
1.4.1 General
The eCMS requires a web-browser (platform-neutral) and Internet connection.
Obtain from an approved vendor an External Certification Authority (ECA), Primary Key Infrastructure (PKI) certificate, or other similar digital identification to support two-factor authentication and access to eCMS.
Provide and maintain computer hardware and software for the eCMS access throughout the duration of the contract for all Contractor-designated users.
Provide connectivity, speed, bandwidth, and access to the Internet to ensure adequate functionality. Neither upgrading of the Contractor's computer system nor delays associated from the usage of the eCMS will be justification or grounds for a time extension or cost adjustment to the
Contract.
../Word/01%2033%2000.doc
Section 01 31 23.13 20 Page 2 of 8
1.4.2 Contractor Personnel List
Within 20 calendar days of contract award, provide to the Contracting
Officer a list of Contractor's personnel who will have the responsibility for the transfer, sharing and management of electronic design, technical submittals and documents and will require access to the eCMS. Project personnel roles to be filled in the eCMS include the Contractor's Project
Manager, Designer of Record, Superintendent, Quality Control (QC) Manager, and Site Safety and Health Officer (SSHO). Personnel must be capable of electronic document management. Notify the COR immediately of any personnel changes to the project. The Contracting Officer reserves the right to perform a security check on all potential users. Provide the following information:
First Name
Last Name
E-mail Address
Office Address
Project Role (e.g. Project Manager, QC Manager, Superintendent)
1.5 SECURITY CLASSIFICATION
In accordance with Department of Navy guidance, all military construction contract data are unclassified, unless specified otherwise by a properly designated Original Classification Authority (OCA) and in accordance with an established Security Classification Guide (SCG). Refer to the project's OCA when questions arise about the proper classification of information.
The eCMS must only be used for the transaction of unclassified information associated with construction projects. In conformance with the Freedom of
Information Act (FOIA), Department of Defense Manual 5200.01-V4: DoD
Information Security Program: Controlled Unclassified Information (CUI), and
DoD requirements, any unclassified project documentation uploaded into the eCMS must be designated either "U - UNCLASSIFIED" (U) or "FOUO -
UNCLASSIFIED-FOR OFFICIAL USE ONLY" (FOUO).
1.6 ECMS UTILIZATION
Establish, maintain, and update data and documentation in the eCMS throughout the duration of the contract.
1.6.1 Information Security Classification/Identification
The eCMS must be used for the transmittal of the following documents. This requirement supersedes conflicting requirements in other sections), however, submittal review times in Section 01 33 00 SUBMITTAL PROCEDURES remain applicable. Table 1 - Project Documentation Types provides the appropriate
U and FOUO designations for various types of project documents.
Construction documents requiring FOUO status must be marked accordingly.
Apply the appropriate markings before any document is uploaded into eCMS.
Markings are not required on U documents.
Table 1 also identifies which eCMS application is to be used in the transmittal of data (these are subject to change based on the latest software configuration). If a designated application is not functional
../Word/01%2033%2000.doc
Section 01 31 23.13 20 Page 3 of 8 within 4 hours of initial attempt, defer to the Submittal application and submit the required data as an uploaded portable document (e.g. PDF), word processor, spreadsheet, drawing, or other appropriate format. Hard copy or e-mail submission of these items is acceptable only if eCMS is documented to be not available or not functional. For Submittals, select the following:
Preparation by = Contractor personnel assigned to prepare the submittal
Approval by = Contracting Officer Representative (COR)
Returned by = Design Lead/Manager
Forwarded to = Contractor project manager
Table 1 - Project Documentation Types
SUBJECT/NAME CLASS REMARKS ECMS APPLICATION
As-Built Drawings U Locations of sensitive areas must be labeled as either "Controlled
Area" or "Restricted Area" and may be shown on unclassified documents with the approval from Site
Security Manager
Document management, documents, submittals
Base Access
Request/Approval
FOUO 1. Verify applicability with local installation security procedures via the Administrative Contracting
Office
2. Redact Social Security Numbers
(SSNs) prior to upload into eCMS, unless SSNs are required by the local security office to support security clearance investigations or verifications
Communications management, communications
Building
Information
Modeling (BIM)
U 1. Locations of sensitive areas must be labeled as either
"Controlled Area" or "Restricted
Area" and may be shown on unclassified documents with the approval from Site Security Manager
2. Design reviews will be performed in existing "Dr Checks"
Document management, documents, submittals
Construction
Permits
U Refer to rules of the issuing activity, state or jurisdiction
Document management, documents, submittals
Section 01 31 23.13 20 Page 4 of 8
SUBJECT/NAME CLASS REMARKS ECMS APPLICATION
Construction
Schedules
(Activities and
Milestones)
U After the schedule submittal is approved by the COR, import the schedule file into the scheduling application, and select "Approve" to establish a new schedule baseline
Document management, documents, submittals
Construction
Schedules (Cost-
Loaded)
FOUO Document management, documents, submittals
DD 1354 Transfer of
Real Property
U Document management, documents, submittals
Daily Production
Reports
FOUO Provide weather conditions, crew size, man-hours, equipment, and materials information
Site management, Daily Report
Daily Quality
Control (QC)
Reports
FOUO Provide QC Phase, Definable
Features of Work
Identify visitors
Site management, Daily Report
Designs and
Specifications
U 1. Locations of sensitive areas must be labeled as either
"Controlled Area" or "Restricted
Area" and may be shown on unclassified documents with the approval from Site Security Manager
2. Design reviews will be performed in existing "Dr Checks"
Document management, documents, submittals
Environmental
Notice of Violation
(NOV), Corrective
Action Plan
U Refer to rules of the issuing activity, state or jurisdiction
Document management, documents, submittals
Environmental
Protection Plan
(EPP)
FOUO Document management, documents, submittals
Section 01 31 23.13 20 Page 5 of 8
SUBJECT/NAME CLASS REMARKS ECMS APPLICATION
Jobsite
Documentation, Bulletin Board, Labor Laws, SDS
U Document management, documents, submittals
Meeting Minutes FOUO Communication management, meeting minutes
Operations &
Maintenance Support
Information
(OMSI/eOMSI), Facility Data
Worksheet
U 1. Locations of sensitive areas must be labeled as either
"Controlled Area" or "Restricted
Area" and may be shown on unclassified documents with the approval from Site Security Manager
2. Design reviews will be performed in existing "Dr Checks"
Document management, documents, submittals
Photographs U Subject to base/installation restrictions
Document management, documents, submittals
QCM Initial Phase
Checklists
FOUO Site management, Checklists
QCM Preparatory
Phase Checklists
FOUO Site management, Checklists
Quality Control
Plans
FOUO Document management, documents, submittals
QC Certifications U Document management, documents, submittals
QC Punch List U Site management, Punch lists
Red-Zone Checklist U Site management, Checklists
Section 01 31 23.13 20 Page 6 of 8
SUBJECT/NAME CLASS REMARKS ECMS APPLICATION
Rework Items List FOUO Site management, Punch lists
Request for
Information (RFI)
Post-Award
FOUO Communications management, RFIs
Safety Plan FOUO Site management, Daily Report
Safety - Activity
Hazard Analyses
(AHA)
FOUO Site management, Daily Report
Safety - Mishap
Reports
FOUO Site management, Daily Report
SCIF/SAPF
Accreditation
Support Documents
FOUO Note: Some Construction Security plans may be classified as Secret.
Classified information must not be uploaded into eCMS. Refer to the
Site Security Manager, as applicable.
Document management, documents, submittals
Shop Drawings U Locations of sensitive areas must be labeled as either "Controlled
Area" or "Restricted Area" and may be shown on unclassified documents with the approval from Site
Security Manager
Document management, documents, submittals
Storm Water
Pollution
Prevention (Notice of Intent - Notice of Termination)
U Refer to rules of the issuing activity, state or jurisdiction
Document management, documents, submittals
Submittals and
Submittal Log
U Document management, documents, submittals
Testing Plans, Logs, and Reports
FOUO Site management, QC inspection and testing plan
Section 01 31 23.13 20 Page 7 of 8
SUBJECT/NAME CLASS REMARKS ECMS APPLICATION
Training/Reference
Materials
U Document management, documents, submittals
Training Records
(Personnel)
FOUO Document management, documents, submittals
Utility Outage/Tie-
In Request/Approval
FOUO Document management, documents, submittals
Warranties/BOD
Letter
FOUO Document management, documents, submittals
Quality Assurance
Reports and
Compliance Notices
FOUO GOV ONLY
Other Government-prepared documents
FOUO GOV ONLY
All O ther
Documents
FOUO Refer to FOIA guidelines and contact the FOIA official to determine whether exemptions exist
As applicable
1.6.2 Markings on FOUO documents
a. Only FOUO documents being electronically uploaded into the eCMS (.docx, .xlsx, .pptx, .pdf, .jpg, .zip, and others as appropriate), and associated paper documents described in the paragraph CONTRACT
ADMINISTRATION require FOUO markings as indicated in the subparagraphs below.
b. FOUO documents that are originally created within the eCMS application using the web-based forms (RFIs, Daily Reports, and others as appropriate) will be automatically watermarked by the eCMS software, and these do not require additional markings.
c. FOUO documents must be marked "UNCLASSIFIED//FOR OFFICIAL USE ONLY" at the bottom of the outside of the front cover (if there is one), the title page, the first page, and the outside of the back cover (if there is one).
Section 01 31 23.13 20 Page 8 of 8
d. FOUO documents must be marked on the internal pages of the document as
"UNCLASSIFIED//FOR OFFICIAL USE ONLY"' at top and bottom.
e. Where Installations require digital photographs to be designated FOUO, place the markings on the face of the photograph.
f. For visual documentation, other than photographs and audio documentation, mark with either visual or audio statements as appropriate at both the beginning and end of the file.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
Section 08 34 02 Page 1 of 16
SECTION 08 34 02
BULLET-RESISTANT COMPONENTS
08/09
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL, INC. (AMCA)
AMCA 500-D (2018) Laboratory Methods of Testing Dampers for
Rating
ALUMINUM ASSOCIATION (AA)
AA DAF45 (2003; Reaffirmed 2009) Designation System for
Aluminum Finishes
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 611 (2014) Voluntary Specification for Anodized
Architectural Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip
Galvanized) Coatings on Iron and Steel Products
ASTM A653/A653M (2018) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-
Coated (Galvannealed) by the Hot-Dip Process
ASTM C1036 (2016) Standard Specification for Flat Glass
ASTM C1048 (2018) Standard Specification for Heat-
Strengthened and Fully Tempered Flat Glass
ASTM C1172 (2019) Standard Specification for Laminated
Architectural Flat Glass
ASTM D256 (2010; R 2018) Standard Test Methods for
Determining the Izod Pendulum Impact Resistance of Plastics
ASTM D542 (2014) Index of Refraction of Transparent Organic
Plastics
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for
Water Absorption of Plastics
ASTM D635 (2018) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in
Section 08 34 02 Page 2 of 16 a Horizontal Position
ASTM D638 (2014) Standard Test Method for Tensile
Properties of Plastics
ASTM D696 (2016) Standard Test Method for Coefficient of
Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica
Dilatometer
ASTM D792 (2013) Density and Specific Gravity (Relative
Density) of Plastics by Displacement
ASTM D882 (2012) Tensile Properties of Thin Plastic
Sheeting
ASTM D905 (2008; E 2009) Strength Properties of Adhesive
Bonds in Shear by Compression Loading
ASTM D1003 (2013) Haze and Luminous Transmittance of
Transparent Plastics
ASTM D1044 (2013) Resistance of Transparent Plastics to
Surface Abrasion
ASTM D1922 (2015) Propagation Tear Resistance of Plastic
Film and Thin Sheeting by Pendulum Method
ASTM D3595 (2014) Polychlorotrifluoroethylene (PCTFE)
Extruded Plastic Sheet and Film
ASTM D3951 (2015) Commercial Packaging
ASTM D4093 (1995; R 2014) Photoelastic Measurements of
Birefringence and Residual Strains in Transparent or Translucent Plastic Materials
ASTM D4802 (2016) Standard Specification for Poly(Methyl
Methacrylate) Acrylic Plastic Sheet
ASTM D5420 (2016) Standard Test Method for Impact Resistance of Flat, Rigid Plastic Specimen by Means of a
Strike Impacted by a Falling Weight (Gardner
Impact)
ASTM E90 (2009; R2016) Standard Test Method for Laboratory
Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements
ASTM E169 (2016) Standard Practices for General Techniques of Ultraviolet-Visible Quantitative Analysis
ASTM E204 (1998; R 2007) Identification of Material by
Infrared Absorption Spectroscopy, Using the ASTM
Coded Band and Chemical Classification Index
ASTM E831 (2014) Linear Thermal Expansion of Solid
Materials by Thermomechanical Analysis
Section 08 34 02 Page 3 of 16
ASTM E1300 (2016) Standard Practice for Determining Load
Resistance of Glass in Buildings
ASTM F428 (2009; R 2014) Intensity of Scratches on
Aerospace Glass Enclosures
ASTM F520 (2016) Standard Test Method for Environmental
Resistance of Aerospace Transparencies to
Artificially Induced Exposures
ASTM F521 (2016) Standard Test Methods for Bond Integrity of Transparent Laminates
ASTM F548 (2009; R 2014ntensity of Scratches on Aerospace
Transparent Plastics
ASTM F735 (2017) Standard Test Method for Abrasion
Resistance of Transparent Plastics and Coatings
Using the Oscillating Sand Method
ASTM F791 (1996; R 2013) Stress Crazing of Transparent
Plastics
ASTM F1233 (2008; R 2013) Security Glazing Materials and
Systems
ASTM G155 (2013) Standard Practice for Operating Xenon Arc
Light Apparatus for Exposure of Non-Metallic
Materials
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.1 (2016) Butts and Hinges
ANSI/BHMA A156.4 (2013) Door Controls - Closers
ANSI/BHMA A156.5 (2014) Cylinder and Input Devices for Locks
(2015) Door Controls - Overhead Stops and Holders
ANSI/BHMA A156.13 (2017) Mortise Locks & Latches Series 1000
ANSI/BHMA A156.16 (2018) Auxiliary Hardware
ANSI/BHMA A156.18 (2016) Materials and Finishes
ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and
Steel Frames GLASS ASSOCIATION OF NORTH AMERICA
(GANA)
GANA Glazing Manual (2008) Glazing Manual
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM HMMA 810 (2009) Hollow Metal Doors
NAAMM HMMA 820 (2008) Hollow Metal Frames
Section 08 34 02 Page 4 of 16
NAAMM HMMA 830 (2002) Hardware Selection for Hollow Metal Doors and Frames
NAAMM HMMA 840 (2007) Installation and Storage of Hollow Metal
Doors and Frames
NAAMM HMMA 850 (20140) Fire Rated Hollow Metal Doors and Frames
NAAMM HMMA 862 (2013) Guide Specifications for Commercial
Security Hollow Metal Doors and Frames
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload
Relays Rated 600 V
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems:
Enclosures
NEMA MG 1 (2016; SUPP 20162018) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2; TIA 17-
3; TIA 17-4; TIA 17-5; TIA 17-6; TIA 17-7; TIA
17-8; TIA 17-9; TIA 17-10; TIA 17-11; TIA 17-12;
TIA 17-13; TIA 17-14; TIA 17-15; TIA 17-16; TIA
17-17) National Electrical Code
NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives
NATIONAL INSTITUTE OF JUSTICE (NIJ)
NIJ Std 0108.01 (1985) Ballistic Resistant Protective Materials
NAVAL FACILITIES ENGINEERING AND EXPEDITIONARY WARFARE
CENTER (NAVFAC EXWC)
NAVFAC EXWC CR 80.025 (1980) Testing and Evaluation of Attack
Resistance and Hardening Retrofits of Marine
Barrack Construction Types to Small Arms Multiple
Impact
U.S. DEPARTMENT OF STATE (SD)
SD Std-01.01 (1993 Rev G Amended; Inx Certified Prod/Mfg)
Certification Standard Forced Entry and Ballistic
Resistance of Structural Systems
UNDERWRITERS LABORATORIES (UL)
UL 752 (2005; Reprint Dec 2015) Standard for Bullet-
Resisting Equipment
Section 08 34 02 Page 5 of 16
1.2 SYSTEM DESCRIPTION
1.2.1 Design Requirements
Provide bullet resistant components conforming to the requirements specified for the particular items and, as much as possible, complete assemblies by a single manufacturer.
1.2.2 Performance Requirements
All items specified shall be bullet resistant to the threat specified. Movable and operable components shall operate smoothly and freely. When a reference for performance is listed, operation shall conform to referenced requirements.
1.2.3 Submittal Requirement Details
The following shall be submitted:
a. Manufacturer's descriptive data and installation instructions. Descriptive data shall include cleaning instructions as recommended by the plastic sheet manufacturer.
b. Lists including schedule of all components to be incorporated in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .